The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Selecting an appropriate design-builder is critical to the success of DB projects. The objective of this study is to identify selection criteria for design-builders and compare their relative importance by means of a robust content analysis of 94 Request For Proposals (RFPs) for public DB projects. These DB projects had an aggregate contract value of over US$3.5 billion and were advertised between 2000 and 2010. This study summarized twenty-six selection criteria and classified into ten categories, i.e.: price, experience, technical approach, management approach, qualification, schedule, past performance, financial capability, responsiveness to the RFP, and legal status in descending order of their relative importance. The results showed that even though price still remains as the most important selection category, its relative importance declines significantly in the last decade. The categories of qualification, experience, past performance, by contrast, have been becoming more important to DB owners for selecting design-builders. Finally, it is found that the importance weighting of price in large projects is significantly higher than that in small projects. This study provides a useful reference for owners in selecting their preferred design-builders.