26 resultados para Request for proposals

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Selecting an appropriate design-builder is critical to the success of DB projects. The objective of this study is to identify selection criteria for design-builders and compare their relative importance by means of a robust content analysis of 94 Request For Proposals (RFPs) for public DB projects. These DB projects had an aggregate contract value of over US$3.5 billion and were advertised between 2000 and 2010. This study summarized twenty-six selection criteria and classified into ten categories, i.e.: price, experience, technical approach, management approach, qualification, schedule, past performance, financial capability, responsiveness to the RFP, and legal status in descending order of their relative importance. The results showed that even though price still remains as the most important selection category, its relative importance declines significantly in the last decade. The categories of qualification, experience, past performance, by contrast, have been becoming more important to DB owners for selecting design-builders. Finally, it is found that the importance weighting of price in large projects is significantly higher than that in small projects. This study provides a useful reference for owners in selecting their preferred design-builders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The design-build (DB) system is a popular and effective delivery method of construction projects worldwide. After owners decide to procure their projects through the DB system, they may wish to determine the optimal proportion of design to be provided in the DB request for proposals (RFPs), which serve as solicitations for design-builders and describe the scope of work. However, this presents difficulties to DB owners and there is little, if any, systematic research in this area. This paper reports on an empirical study in the USA entailing both an online questionnaire survey and Delphi survey to identify and evaluate the factors influencing owners’ decisions in determining the proportion of design to include in DB RFPs. Eleven factors are identified, i.e. (1) clarity of project scope; (2) applicability of performance specifications; (3) desire for design innovation; (4) site constraints; (5) availability of competent design-builders; (6) project control requirements; (7) user group involvement level; (8) third party requirements; (9) owner experience with DB; (10) project complexity; and (11) schedule constraints. A statistically significant agreement on the eleven factors was also obtained from the (mainly non-owner) Delphi experts. Although some of the experts hold different opinions on how these factors affect the proportion of design, these findings furnish various stakeholders with a better understanding of the delivery process of DB projects and the appropriate provision of project information in DB RFPs. As the result is mainly industry opinion concerning the optimal proportion of design, in addition and for completeness, future studies should be conducted to obtain a big picture of the optimal proportion of design by means of seeking owners’ inputs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Design-build (DB) is regarded as an effective means of delivering high performance green buildings, and the selection of DB contractors is of critical importance. The objective of this study is to evaluate the selection of design-builders for public buildings seeking Leadership in Energy and Environmental Design (LEED) certification and compare the selection practices involved with those of non-LEED-seeking DB projects through a robust content analysis of 74 DB request for proposals (RFPs) for public DB projects. The results of the content analysis reveal that the level of LEED certification is the dominant means of conveying the sustainability requirements in RFPs for contractor selection, with the majority of RFPs (60%) including sustainability requirements as part of the contractor evaluation package. With the exception of contractors' past performance, there is no statistically significant difference in the importance weightings of selection criteria between LEED-seeking and non-LEED-seeking buildings, and DB owners tend to place more emphasis on innovative technical solutions rather than the past performance of DB contractors. Additionally, the research findings also indicate that owners of LEED-seeking building projects tend to provide less design decisions in RFPs in order to solicit innovative design alternatives from potential DB contractors. This study provides DB owners with a number of practical implications for selecting appropriate design-builders for green DB projects.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The design-build (DB) system is regarded as an effective means of delivering sustainable buildings. Specifying clear sustainability requirements to potential contractors is of great importance to project success. This research investigates the current state-of-the-practice for the definition of sustainability requirements within the public sectors of the U.S. construction market using a robust content analysis of 49 DB requests for proposals (RFPs). The results reveal that owners predominantly communicate their desired level of sustainability through the LEED certification system. The sustainability requirement has become an important dimension for the best-value evaluation of DB contractors with specific importance weightings of up to 25%. Additionally, owners of larger projects and who provide less design information in their RFPs generally allocate significantly higher importance weightings to sustainability requirements. The primary knowledge contribution of this study to the construction industry is the reveal of current trend in DB procurement for green projects. The findings also provide owners, architects, engineers, and constructors with an effective means of communicating sustainability objectives in solicitation documents.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The availability and use of online counseling approaches has increased rapidly over the last decade. While research has suggested a range of potential affordances and limitations of online counseling modalities, very few studies have offered detailed examinations of how counselors and clients manage asynchronous email counseling exchanges. In this paper we examine email exchanges involving clients and counselors through Kids Helpline, a national Australian counseling service that offers free online, email and telephone counseling for young people up to the age of 25. We employ tools from the traditions of ethnomethodology and conversation analysis to analyze the ways in which counselors from Kids Helpline request that their clients call them, and hence change the modality of their counseling relationship, from email to telephone counseling. This paper shows the counselors’ three multi-layered approaches in these emails as they negotiate the potentially delicate task of requesting and persuading a client to change the trajectory of their counseling relationship from text to talk without placing that relationship in jeopardy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document outlines a framework that could be used by government agencies in assessing policy interventions aimed at achieving social outcomes from government construction contracts. The framework represents a rational interpretation of the information gathered during the multi-outcomes construction policies project. The multi-outcomes project focused on the costs and benefits of using public construction contracts to promote the achievement of training and employment and public art objectives. The origin of the policy framework in a cost-benefit appraisal of current policy interventions is evidenced by its emphasis on sensitivity to policy commitment and project circumstances (especially project size and scope).The quantitative and qualitative analysis conducted in the multi-outcomes project highlighted, first, that in the absence of strong industry commitment to policy objectives, policy interventions typically result in high levels of avoidance activity, substantial administrative costs and very few benefits. Thus, for policy action on, for example, training or local employment to be successful compliance issues must be adequately addressed. Currently it appears that pre-qualification schemes (similar to the Priority Access Scheme) and schemes that rely on measuring, for example, the training investments of contractors within particular projects do not achieve high levels of compliance and involve significant administrative costs. Thus, an alternative is suggested in the policy framework developed here: a levy on each public construction project – set as a proportion of the total project costs. Although a full evaluation of this policy alternative was beyond the scope of the multi-outcomes construction policies project, it appears to offer the potential to minimize the transaction costs on contractors whilst enabling the creation of a training agency dedicated to improving the supply of skilled construction labour. A recommendation is thus made that this policy alternative be fully researched and evaluated. As noted above, the outcomes of the multi-outcomes research project also highlighted the need for sensitivity to project circumstances in the development and implementation of polices for public construction projects. Ideally a policy framework would have the flexibility to respond to circumstances where contractors share a commitment to the policy objectives and are able to identify measurable social outcomes from the particular government projects they are involved in. This would involve a project-by-project negotiation of goals and performance measures. It is likely to only be practical for large, longer term projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objectives: To determine GPs' reported use of written education materials with older patients and older patients' reported receipt of these materials. To determine GPs' and older patients' perceptions of written materials.---------- Method: Using self-report questionnaires, two populations were surveyed; a randomised sample of 50 GPs (29 males and 21 females) practising in Brisbane's southern suburbs and a convenience sample of 188 older community-dwelling people (aged over 64 years).----------- Results: All GPs reported using written materials with patients, although 28% had not given any to the Last 10 patients. This increased to 46% when patients were older. Twenty percent of patients wanted more written information from their GP, while some GPs believed that older patients preferred verbal information and gave out written information only when they perceived patient interest. All GPs reported giving written materials at the time of consultation and over two thirds discussed the content with patients. Just over 50% of patients reported receiving written information from GPs in the Last six months and only hall of these again discussed it directly with their GP. Overall, patients were more positive than GPs about the value of written education materials.---------- Conclusions: Older patients' desire for written information may be better met if they are more assertive in requesting this of GPs and GPs may better serve their patients' needs if they make written information more readily available to them. Better access to materials and more financial incentives to give them out might also increase GPs' use of written materials.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Given there is currently a migration trend from traditional electrical supervisory control and data acquisition (SCADA) systems towards a smart grid based approach to critical infrastructure management. This project provides an evaluation of existing and proposed implementations for both traditional electrical SCADA and smart grid based architectures, and proposals a set of reference requirements which test bed implementations should implement. A high-level design for smart grid test beds is proposed and initial implementation performed, based on the proposed design, using open source and freely available software tools. The project examines the move towards smart grid based critical infrastructure management and illustrates the increased security requirements. The implemented test bed provides a basic framework for testing network requirements in a smart grid environment, as well as a platform for further research and development. Particularly to develop, implement and test network security related disturbances such as intrusion detection and network forensics. The project undertaken proposes and develops an architecture of the emulation of some smart grid functionality. The Common Open Research Emulator (CORE) platform was used to emulate the communication network of the smart grid. Specifically CORE was used to virtualise and emulate the TCP/IP networking stack. This is intended to be used for further evaluation and analysis, for example the analysis of application protocol messages, etc. As a proof of concept, software libraries were designed, developed and documented to enable and support the design and development of further smart grid emulated components, such as reclosers, switches, smart meters, etc. As part of the testing and evaluation a Modbus based smart meter emulator was developed to provide basic functionality of a smart meter. Further code was developed to send Modbus request messages to the emulated smart meter and receive Modbus responses from it. Although the functionality of the emulated components were limited, it does provide a starting point for further research and development. The design is extensible to enable the design and implementation of additional SCADA protocols. The project also defines an evaluation criteria for the evaluation of the implemented test bed, and experiments are designed to evaluate the test bed according to the defined criteria. The results of the experiments are collated and presented, and conclusions drawn from the results to facilitate discussion on the test bed implementation. The discussion undertaken also present possible future work.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Hong Kong is a modern global city with a reputation for well-regulated financial markets, but for years, the government had been trying to enact laws on corporate rescue procedures with relatively little success. It is under the pretext of the Global Financial Crisis, the threat of a future economic meltdown gave the Hong Kong government the impetus to revisit this issue. This third attempt to codify statutory obligations on directors’ liability for insolvent trading has been criticised for either setting the standards too high or low for directors trading whilst insolvent. There is also some reservation given the beliefs and values of directors in Chinese family-owned and controlled companies. These companies would most likely trade out the difficult times. Nevertheless, this does not negate from the fact that the enactment of corporate rescue procedures in Hong Kong in 2010 is a momentous achievement for the Hong Kong government.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Much of the research on the delivery of advice by professionals such as physicians, health workers and counsellors, both on the telephone and in face to face interaction more generally, has focused on the theme of client resistance and the consequent need for professionals to adopt particular formats to assist in the uptake of the advice. In this paper we consider one setting, Kid’s Helpline, the national Australian counselling service for children and young people, where there is an institutional mandate not to give explicit advice in accordance with the values of self-direction and empowerment. The paper examines one practice, the use of script proposals by counsellors, which appears to offer a way of providing support which is consistent with these values. Script proposals entail the counsellors packaging their advice as something that the caller might say – at some future time – to a third party such as a friend, teacher, parent, or partner, and involve the counsellor adopting the speaking position of the caller in what appears as a rehearsal of a forthcoming strip of interaction. Although the core feature of a script proposal is the counsellor’s use of direct reported speech they appear to be delivered, not so much as exact words to be followed, but as the type of conversation that the client needs to have with the 3rd party. Script proposals, in short, provide models of what to say as well as alluding to how these could be emulated by the client. In their design script proposals invariably incorporate one or more of the most common rhetorical formats for maximising the persuasive force of an utterance such as a three part list or a contrastive pair. Script proposals, moreover, stand in a complex relation to the prior talk and one of their functions appears to be to summarise, respecify or expand upon the client’s own ideas or suggestions for problem solving that have emerged in these preceding sequences.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objectives: To quantify randomness and cost when choosing health and medical research projects for funding. Design: Analysis of retrospective data from grant review panels. Setting: The National Health & Medical Research Council of Australia. Participants/Data: All panel members’ scores for grant proposals submitted in 2009. Main outcome measure: The proportion of grant proposals that were always, sometimes and never funded after accounting for random variability arising from variation in panel members’ scores; the cost-effectiveness of different size assessment panels. Results: 59% of 620 funded grants were sometimes not funded when random variability was accounted for. Only 9% of grant proposals were always funded, 61% were never funded and 29% were sometimes funded. The extra cost per grant effectively funded from the most effective system was $18,541. Conclusions: Allocating funding for scientific research in health and medicine is costly and somewhat random. There are many useful research questions to be addressed that could improve current processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The draft report of the Industry Commission's charitable organisations inquiry introduces a new term for nonprofit organisations delivering human services. The new term is "community social welfare organisation" or "CSWO". The report recommends that tax deductibility of donations be extended such organisations. It then hints at making the definition of CSWO a standard criteria for state taxation exemptions. This paper examines the definition of the new term community social welfare organisation and charts its possible consequences if adopted by the federal government. The promise of tax deductibility status to previously shunned organisations is largely illusory. The Commission's aim of simplification through clarification of the definition is flawed and will not reduce the administration costs for the Australian Tax Office (ATO) or organisations.