668 resultados para Rehabilitation project
em Queensland University of Technology - ePrints Archive
Resumo:
Background/Aims Timely access to appropriate cardiac care is critical for optimizing positive outcomes after a cardiac event. Attendance at cardiac rehabilitation (CR) remains less than optimal (10%–30%). Our aim was to derive an objective, comparable, geographic measure reflecting access to cardiac services after a cardiac event in Australia. Methods An expert panel defined a single patient care pathway and a hierarchy of the minimum health services for CR and secondary prevention. Using geographic information systems a numeric/alpha index was modelled to describe access before and after a cardiac event. The aftercare phase was modelled into five alphabetical categories: from category A (access to medical service, pharmacy, CR, pathology within 1 h) to category E (no services available within 1 h). Results Approximately 96% or 19 million people lived within 1 h of the four basic services to support CR and secondary prevention, including 96% of older Australians and 75% of the indigenous population. Conversely, 14% (64,000) indigenous people resided in population locations that had poor access to health services that support CR after a cardiac event. Conclusion Results demonstrated that the majority of Australians had excellent ‘geographic’ access to services to support CR and secondary prevention. Therefore, it appears that it is not the distance to services that affects attendance. Our ‘geographic’ lens has identified that more research on socioeconomic, sociological or psychological aspects to attendance is needed.
Resumo:
The report presents a methodology for whole of life cycle cost analysis of alternative treatment options for bridge structures, which require rehabilitation. The methodology has been developed after a review of current methods and establishing that a life cycle analysis based on a probabilistic risk approach has many advantages including the essential ability to consider variability of input parameters. The input parameters for the analysis are identified as initial cost, maintenance, monitoring and repair cost, user cost and failure cost. The methodology utilizes the advanced simulation technique of Monte Carlo simulation to combine a number of probability distributions to establish the distribution of whole of life cycle cost. In performing the simulation, the need for a powerful software package, which would work with spreadsheet program, has been identified. After exploring several products on the market, @RISK software has been selected for the simulation. In conclusion, the report presents a typical decision making scenario considering two alternative treatment options.
Resumo:
A worldwide interest is being generated in the use of fibre reinforced polymer composites (FRP) in rehabilitation of reinforced concrete structures. As a replacement for the traditional steel plates or external post-tensioning in strengthening applications, various types of FRP plates, with their high strength to weight ratio and good resistance to corrosion, represent a class of ideal material in external retrofitting. Within the last ten years, many design guidelines have been published to provide guidance for the selection, design and installation of FRP systems for external strengthening of concrete structures. Use of these guidelines requires understanding of a number of issues pertaining to different properties and structural failure modes specific to these materials. A research initiative funded by the CRC for Construction Innovation was undertaken (primarily at RMIT) to develop a decision support tool and a user friendly guide for use of fibre reinforced polymer composites in rehabilitation of concrete structures. The user guidelines presented in this report were developed after industry consultation and a comprehensive review of the state of the art technology. The scope of the guide was mainly developed based on outcomes of two workshops with Queensland Department of Main Roads (QDMR). The document covers material properties, recommended construction requirements, design philosophy, flexural, shear and torsional strengthening of beams and strengthening of columns. In developing this document, the guidelines published on FIB Bulletin 14 (2002), Task group 9.3, International Federation of Structural Concrete (FIB) and American Concrete Institute Committee 440 report (2002) were consulted in conjunction with provisions of the Austroads Bridge design code (1992) and Australian Concrete Structures code AS3600 (2002). In conclusion, the user guide presents design examples covering typical strengthening scenarios.
Resumo:
This report presents a summary of the research conducted by the research team of the CRC project 2002-005-C, “Decision support tools for concrete infrastructure rehabilitation”. The project scope, objectives, significance and innovation and the research methodology is outlined in the introduction, which is followed by five chapters covering different aspects of the research completed. Major findings of a review of literature conducted covering both use of fibre reinforced polymer composites in rehabilitation of concrete bridge structures and decision support frameworks in civil infrastructure asset management is presented in chapter two. Case study of development of a strengthening scheme for the “Tenthill Creek bridge” is covered in the third chapter, which summarises the capacity assessment, traditional strengthening solution and the innovative solution using FRP composites. The fourth chapter presents the methodology for development of a user guide covering selection of materials, design and application of FRP in strengthening of concrete structures, which were demonstrated using design examples. Fifth chapter presents the methodology developed for evaluating whole of life cycle costing of treatment options for concrete bridge structures. The decision support software tool developed to compare different treatment options based on reliability based whole of life cycle costing will be briefly described in this chapter as well. The report concludes with a summary of findings and recommendations for future research.
Final : report assessing risk and variation in maintenance and rehabilitation costs for road network
Resumo:
This report presents the results of research projects conducted by The Australian Cooperative Research Centre for Construction Innovation, Queensland University of Technology, RMIT University, Queensland Government Department of Main Roads and Queensland Department of Public Works. The research projects aimed at developing a methodology for assessing variation and risk in investment in road network, including the application of the method in assessing road network performance and maintenance and rehabilitation costs for short- and long-term future investment.
Resumo:
Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.
Resumo:
In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.
Resumo:
An estimation of costs for maintenance and rehabilitation is subject to variation due to the uncertainties of input parameters. This paper presents the results of an analysis to identify input parameters that affect the prediction of variation in road deterioration. Road data obtained from 1688 km of a national highway located in the tropical northeast of Queensland in Australia were used in the analysis. Data were analysed using a probability-based method, the Monte Carlo simulation technique and HDM-4’s roughness prediction model. The results of the analysis indicated that among the input parameters the variability of pavement strength, rut depth, annual equivalent axle load and initial roughness affected the variability of the predicted roughness. The second part of the paper presents an analysis to assess the variation in cost estimates due to the variability of the overall identified critical input parameters.
Resumo:
This paper compares and reviews the recommendations and contents of the guide for the design and construction of externally bonded FRP systems for strengthening concrete structures reported by ACI committee 440 and technical report of Externally bonded FRP reinforcement for RC structures (FIB 14) in application of carbon fiber reinforced polymer (CFRP) composites in strengthening of an aging reinforced concrete headstock. The paper also discusses the background, limitations, strengthening for flexure and shear, and other related issues in use of FRP for strengthening of a typical reinforced concrete headstock structure such as durability, de-bonding, strengthening limits, fire and environmental conditions. A case study of strengthening of a bridge headstock using FRP composites is presented as a worked example in order to illustrate and compare the differences between these two design guidelines when used in conjunction with the philosophy of the Austroads (1992) bridge design code.
Resumo:
Background: Access to cardiac services is essential for appropriate implementation of evidence-based therapies to improve outcomes. The Cardiac Accessibility and Remoteness Index for Australia (Cardiac ARIA) aimed to derive an objective, geographic measure reflecting access to cardiac services. Methods: An expert panel defined an evidence-based clinical pathway. Using Geographic Information Systems (GIS), a numeric/alpha index was developed at two points along the continuum of care. The acute category (numeric) measured the time from the emergency call to arrival at an appropriate medical facility via road ambulance. The aftercare category (alpha) measured access to four basic services (family doctor, pharmacy, cardiac rehabilitation, and pathology services) when a patient returned to their community. Results: The numeric index ranged from 1 (access to principle referral center with cardiac catheterization service ≤ 1 hour) to 8 (no ambulance service, > 3 hours to medical facility, air transport required). The alphabetic index ranged from A (all 4 services available within 1 hour drive-time) to E (no services available within 1 hour). 13.9 million (71%) Australians resided within Cardiac ARIA 1A locations (hospital with cardiac catheterization laboratory and all aftercare within 1 hour). Those outside Cardiac 1A were over-represented by people aged over 65 years (32%) and Indigenous people (60%). Conclusion: The Cardiac ARIA index demonstrated substantial inequity in access to cardiac services in Australia. This methodology can be used to inform cardiology health service planning and the methodology could be applied to other common disease states within other regions of the world.
Resumo:
The Central Queensland Mine Rehabilitation Group (CQMRG) has hosted mine site rehabilitation inspections combined with technical workshops for more than 20 years. It was recognised at CQMRG's anniversary meeting in April 2013 that the vast body of knowledge held by rehabilitation and closure planning practitioners was being lost as senior rehabilitation experts retire from the industry. It was noted that even more knowledge could be readily lost unless a knowledge management platform was developed to capture, store and enable retrieval of this information. This loss of knowledge results in a significant cost to industry. This project was therefore undertaken to review tools which have the capability to gather the less formal knowledge as well as to make links to existing resources and bibliographic material. This scoping study evaluated eight alternative knowledge management systems to provide guidance on the best method of providing the industry with an up-to-date, good practice, knowledge management system for rehabilitation and closure practices, with capability for information sharing via a portal and discussion forum. This project provides guidance for a larger project which will implement the knowledge management system to meet the requirements of the CQMRG and be transferrable to other regions if applicable. It will also provide the opportunity to identify missing links between existing tools and their application. That is, users may not be aware of how these existing tools can be used to assist with mine rehabilitation planning and implementation and the development of a new platform will help to create those linkages. The outcomes of this project are directed toward providing access to a live repository of rehabilitation practice information which is Central Queensland coal mine-specific, namely: highlighting best practice activities, results of trials and innovative practices; updated legislative requirements; links to practices elsewhere; and informal anecdotal information relevant to particular sites which may be of assistance in the development of rehabilitation of new areas. Solutions to the rehabilitation of challenging spoils/soils will also be provided. The project will also develop a process which can be applied more broadly within the mining sector to other regions and other commodities. Providing a platform for uploading information and holding discussion forums which can be managed by a regional practitioner network enables the new system to be kept alive, driven by users and information needs as they evolve over time. Similar internet-based platforms exist and are managed successfully. The preferred knowledge management system will capture the less formal and more difficult to access knowledge from rehabilitation and mine closure practitioners and stakeholders through the CQMRG and other contributors. It will also provide direct links, and greater accessibility, to more formal sources of knowledge with anticipated cost savings to the industry and improved rehabilitation practices with successful transitioning to closure and post-mining land use.
Resumo:
This research project evaluated the biomechanical and functional outcomes of patients following total knee replacement measured at 6 and 12 months following surgery. Using more objective measures, patients were examined to determine changes in biomechanical and neuromuscular function during performance of activities of daily living such as walking, stair climbing and turning. Adaptations in joint positioning and performance were identified and progressive improvements were made in some areas of locomotor function. The findings of the study provided important objective information to contribute to the design and evaluation of prostheses, new surgical and rehabilitation procedures and improved recovery of patients.
Resumo:
This report examines the effectiveness of national and international programs that treat and rehabilitate drivers with alcohol dependence and the criteria used to approve the removal of interlocks. The project recommends a stepped care model which requires all participants to attend education and screening and then requires participants who fail to change their behaviour to attend increasingly intensive rehabilitation programs. Failure to complete an interlock program could result in participants having their licence revoked. This project was designed to inform action 36(d) of the National Road Safety Strategy 2011-2020: Investigate the option of requiring demonstrated rehabilitation from alcohol dependence before removal of interlock conditions.
Resumo:
Austroads called for responses to a tender to investigate options for rehabilitation in alcohol interlock programs. Following successful application by the Centre for Accident Research and Road Safety – Queensland (CARRS-Q), a program of work was developed. The project has four objectives: 1. Develop a matrix outlining existing policies in national and international jurisdictions with respect to treatment and rehabilitation programs and criteria for eligibility for interlock removal; 2. Critically review the available literature with a focus on evaluation outcomes regarding the effectiveness of treatment and rehabilitation programs; 3. Analyse and assess the strengths and weaknesses of the programs/approaches identified, and; 4. Outline options with an evidence base for consideration by licensing authorities.