384 resultados para Project performance Infrastructure

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Australia is a leading user of collaborative procurement methods, which are used to deliver large and complex infrastructure projects. Project alliances, Early Contractor Involvement (ECI), and partnering are typical examples of collaborative procurement models. In order to increase procurement effectiveness and value for money (VfM), clients have adopted various learning strategies for new contract development. However client learning strategies and behaviours have not been systematically analysed before. Therefore, the current paper undertakes a literature review addressing the research question “How can client learning capabilities be effectively understood?”. From the resource-based and dynamic capability perspectives, this paper proposes that the collaborative learning capability (CLC) of clients drives procurement model evolution. Learning routines underpinning CLC carry out exploratory, transformative and exploitative learning phases associated with collaborative project delivery. This learning improves operating routines, and ultimately performance. The conceptualization of CLC and the three sequential learning phases is used to analyse the evidence in the construction management literature. The main contribution of this study is the presentation of a theoretical foundation for future empirical studies to unveil effective learning strategies, which help clients to improve the performance of collaborative projects in the dynamic infrastructure market.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The research on project learning has recognised the significance of knowledge transfer in project based organisations (PBOs). Effective knowledge transfer across projects avoids reinventions, enhances knowledge creation and saves lots of time that is crucial in project environment. In order to facilitate knowledge transfer, many PBOs have invested lots of financial and human resources to implement IT-based knowledge repository. However, some empirical studies found that employees would rather turn for knowledge to colleagues despite their ready access to IT-based knowledge repository. Therefore, it is apparent that social networks play a pivotal role in the knowledge transfer across projects. Some scholars attempt to explore the effect of network structure on knowledge transfer and performance, however, focused only on egocentric networks and the groups’ internal social networks. It has been found that the project’s external social network is also critical, in that the team members can not handle critical situations and accomplish the projects on time without the assistance and knowledge from external sources. To date, the influence of the structure of a project team’s internal and external social networks on project performance, and the interrelation between both networks are barely known. In order to obtain such knowledge, this paper explores the interrelation between the structure of a project team’s internal and external social networks, and their effect on the project team’s performance. Data is gathered through survey questionnaire distributed online to respondents. Collected data is analysed applying social network analysis (SNA) tools and SPSS. The theoretical contribution of this paper is the knowledge of the interrelation between the structure of a project team’s internal and external social networks and their influence on the project team’s performance. The practical contribution lies in the guideline to be proposed for constructing the structure of project team’s internal and external social networks.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Successful project delivery of construction projects depends on many factors. With regard to the construction of a facility, selecting a competent contractor for the job is paramount. As such, various approaches have been advanced to facilitate tender award decisions. Essentially, this type of decision involves the prediction of a bidderÕs performance based on information available at the tender stage. A neural network based prediction model was developed and presented in this paper. Project data for the study were obtained from the Hong Kong Housing Department. Information from the tender reports was used as input variables and performance records of the successful bidder during construction were used as output variables. It was found that the networks for the prediction of performance scores for Works gave the highest hit rate. In addition, the two most sensitive input variables toward such prediction are ‘‘Difference between Estimate’’ and ‘‘Difference between the next closest bid’’. Both input variables are price related, thus suggesting the importance of tender sufficiency for the assurance of quality production.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Research in construction innovation highlights construction industry as having many barriers and resistance to innovations and suggests that it needs champions. A hierarchical structural model is presented, to assess the impact of the role of the project manager (PM) on the levels of innovation and project performance. The model adopts the structural equation modelling technique and uses the survey data collected from PMs and project team members working for general contractors in Singapore. The model fits well to the observed data, accounting for 24%, 37% and 49% of the variance in championing behaviour, the level of innovation and project performance, respectively. The results of this study show the importance of the championing role of PMs in construction innovation. However, in order to increase their effectiveness, such a role should be complemented by their competency and professionalism, tactical use of influence tactics, and decision authority. Moreover, senior management should provide adequate resources and a sustained support to innovation and create a conducive environment or organizational culture that nurtures and facilitates the PM’s role in the construction project as a champion of innovation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Having a clear project definition is crucial for successful construction projects. It affects design quality, project communication between stakeholders and final project performance in terms of cost, schedule and quality. This study examines the relationship between project definition and final project performance through a structural equation model comprising 4 latent constructs and 6 path hypotheses using data from a questionnaire survey of 120 general contractors in the Malaysian construction industry. The results show that in the study population, all three items impact the project performance, but the link between design quality and project performance is indirect. Instead, the clarity of project definition affects project performance indirectly through design quality and project communication and design quality affects project performance indirectly through project communication. The primary contribution is to provide quantitative confirmation of the more general statements made in the literature from around the world and therefore adds to and consolidates existing knowledge. Practical implications derived from the finding are also proposed for various project stakeholders. Furthermore, as lack of the clarity of project definition is a very common occurrence in construction projects globally, these findings have important ramifications for all construction projects in expanding and clarifying existing knowledge on what is needed for the successful delivery of construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A holistic consideration of innovation and associated activities is still very new to consulting engineering firms. This research will have benefits for both industry and academia. The final outcome of this research is a prioritised decision making innovation model that can be used by consulting engineering firms to make informed decisions by investing in appropriate innovation activities that positively impact project performance. This helps by using an informed approach towards investing rather than 'hit-and-miss' trialling.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Aligning the motivation of contractors and consultants to perform better than ‘business-as-usual’ (BAU) on a construction project is a complex undertaking and the costs of failure are high as misalignment can compromise project outcomes. Despite the potential benefits of effective alignment, there is still little information about optimally designing procurement approaches that promote motivation towards ‘above BAU’ goals. The paper contributes to this knowledge gap by examining the negative drivers of motivation in a major construction project that, despite a wide range of performance enhancing incentives, failed to exceed BAU performance. The paper provides a case study of an iconic infrastructure project undertaken in Australia between 2002 and 2004. It is shown that incentives provided to contractors and consultants to achieve above BAU performance can be compromised by a range of negative motivation drivers including: • inequitable contractual risk allocation; • late involvement of key stakeholders; • inconsistency between contract intentions and relationship intentions; • inadequate price negotiation; • inconsistency between the project performance goals and incentive goals; •unfair and inflexible incentive performance measurement processes. Future quantitative research is planned to determine the generalisability of these results.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Collaborative infrastructure projects use hybrid formal and informal governance structures to manage transactions. Based on previous desk-top research, the authors identified the key mechanisms underlying project governance, and posited the performance implications of the governance (Chen et al. 2012). The current paper extends that qualitative research by testing the veracity of those findings using data from 320 Australian construction organisations. The results provide, for the first time, reliable and valid scales to measure governance and performance of collaborative projects, and the relationship between them. The results confirm seven of seven hypothesised governance mechanisms; 30 of 43 hypothesised underlying actions; eight of eight hypothesised key performance indicators; and the dual importance of formal and informal governance. A startling finding of the study was that the implementation intensity of informal mechanisms (non-contractual conditions) is a greater predictor of project performance variance than that of formal mechanisms (contractual conditions). Further, contractual conditions do not directly impact project performance; instead their impact is mediated by the non-contractual features of a project. Obligations established under the contract are not sufficient to optimise project performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction projects can involve a diverse range of stakeholders and the success of the project depends very much on fulfilling their needs and expectations. It is important, therefore, to identify and recognize project stakeholders and develop a rigorous stakeholder management process. However, limited research has investigated the impact of stakeholders on construction projects in developing countries. A stakeholder impact analysis (SIA), based on an approach developed by Olander (2007), was adopted to investigate the stakeholders' impact on state-owned civil engineering projects in Vietnam. This involved the analysis of a questionnaire survey of 57 project managers to determine the relative importance of different stakeholders. The results show the client to have the highest level of impact on the projects, followed by project managers and the senior management of state-owned engineering firms. The SIA also provides suggestions to project managers in developing and evaluating the stakeholder management process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The establishment of corporate objectives regarding economic, environmental, social, and ethical responsibilities, to inform business practice, has been gaining credibility in the business sector since the early 1990’s. This is witnessed through (i) the formation of international forums for sustainable and accountable development, (ii) the emergence of standards, systems, and frameworks to provide common ground for regulatory and corporate dialogue, and (iii) the significant quantum of relevant popular and academic literature in a diverse range of disciplines. How then has this move towards greater corporate responsibility become evident in the provision of major urban infrastructure projects? The gap identified, in both academic literature and industry practice, is a structured and auditable link between corporate intent and project outcomes. Limited literature has been discovered which makes a link between corporate responsibility; project performance indicators (or critical success factors) and major infrastructure provision. This search revealed that a comprehensive mapping framework, from an organisation’s corporate objectives through to intended, anticipated and actual outcomes and impacts has not yet been developed for the delivery of such projects. The research problem thus explored is ‘the need to better identify, map and account for the outcomes, impacts and risks associated with economic, environmental, social and ethical outcomes and impacts which arise from major economic infrastructure projects, both now, and into the future’. The methodology being used to undertake this research is based on Checkland’s soft system methodology, engaging in action research on three collaborative case studies. A key outcome of this research is a value-mapping framework applicable to Australian public sector agencies. This is a decision-making methodology which will enable project teams responsible for delivering major projects, to better identify and align project objectives and impacts with stated corporate objectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the findings of an empirical study that compares the level of alignment between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the alignment levels between project managers and stakeholders. Despite the overall agreement level between project manager and stakeholders is only medium; results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Despite a general belief that incentive mechanisms can improve value for money during procurement and performance during project execution, empirical research on the actual effects is nascent. This research focuses on the design and implementation of incentive mechanisms in four different infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on an analytical framework of key motivation drivers, a cross cases analysis is conducted in view of performance on the contract assumptions, selection phase, execution phase and project contract performance. It was identified that despite significant differences in the project characteristics, results indicate that they experience similar contextual drivers on the incentive effectiveness. High value was placed on risk allocation and relationship building in the selection and construction phase. The differences can be explained from both contextual and project related characteristics. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the nature of incentive systems across different geographical and contextual boundaries in future research.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.