101 resultados para Project 2004-011-B : Code Checking – Phase 2
em Queensland University of Technology - ePrints Archive
Resumo:
Most buildings constructed in Australia must comply with the Building Code of Australia (BCA). Checking for compliance against the BCA is a major task for both designers and building surveyors. This project carries out a prototype research using the EDM Model Checker and the SMC Model Checker for automated design checking against the Building Codes of Australia for use in professional practice. In this project, we develop a means of encoding design requirements and domain specific knowledge for building codes and investigate the flexibility of building models to contain design information. After assessing two implementations of EDM and SMC that check compliance against deemed-to-satisfy provision of building codes relevant to access by people with disabilities, an approach to automated code checking using a shared object-oriented database is established. This project can be applied in other potential areas – including checking a building design for non-compliance of many types of design requirements. Recommendations for future development and use in other potential areas in construction industries are discussed
Resumo:
Most buildings constructed in Australia must comply with the Building Code of Australia (BCA). Checking for compliance against the BCA is a major task for both designers and building surveyors. This project carries out a prototype research using the EDM Model Checker and the SMC Model Checker for automated design checking against the Building Codes of Australia for use in professional practice. In this project, we develop a means of encoding design requirements and domain specific knowledge for building codes and investigate the flexibility of building models to contain design information. After assessing two implementations of EDM and SMC that check compliance against deemed-to-satisfy provision of building codes relevant to access by people with disabilities, an approach to automated code checking using a shared object-oriented database is established. This project can be applied in other potential areas – including checking a building design for non-compliance of many types of design requirements. Recommendations for future development and use in other potential areas in construction industries are discussed.
Resumo:
The National Energy Efficient Building Project (NEEBP) Phase One report, published in December 2014, investigated “process issues and systemic failures” in the administration of the energy performance requirements in the National Construction Code. It found that most stakeholders believed that under-compliance with these requirements is widespread across Australia, with similar issues being reported in all states and territories. The report found that many different factors were contributing to this outcome and, as a result, many recommendations were offered that together would be expected to remedy the systemic issues reported. To follow up on this Phase 1 report, three additional projects were commissioned as part of Phase 2 of the overall NEEBP project. This Report deals with the development and piloting of an Electronic Building Passport (EBP) tool – a project undertaken jointly by pitt&sherry and a team at the Queensland University of Technology (QUT) led by Dr Wendy Miller. The other Phase 2 projects cover audits of Class 1 buildings and issues relating to building alterations and additions. The passport concept aims to provide all stakeholders with (controlled) access to the key documentation and information that they need to verify the energy performance of buildings. This trial project deals with residential buildings but in principle could apply to any building type. Nine councils were recruited to help develop and test a pilot electronic building passport tool. The participation of these councils – across all states – enabled an assessment of the extent to which these councils are currently utilising documentation; to track the compliance of residential buildings with the energy performance requirements in the National Construction Code (NCC). Overall we found that none of the participating councils are currently compiling all of the energy performance-related documentation that would demonstrate code compliance. The key reasons for this include: a major lack of clarity on precisely what documentation should be collected; cost and budget pressures; low public/stakeholder demand for the documentation; and a pragmatic judgement that non-compliance with any regulated documentation requirements represents a relatively low risk for them. Some councils reported producing documentation, such as certificates of final completion, only on demand, for example. Only three of the nine council participants reported regularly conducting compliance assessments or audits utilising this documentation and/or inspections. Overall we formed the view that documentation and information tracking processes operating within the building standards and compliance system are not working to assure compliance with the Code’s energy performance requirements. In other words the Code, and its implementation under state and territory regulatory processes, is falling short as a ‘quality assurance’ system for consumers. As a result it is likely that the new housing stock is under-performing relative to policy expectations, consuming unnecessary amounts of energy, imposing unnecessarily high energy bills on occupants, and generating unnecessary greenhouse gas emissions. At the same time, Councils noted that the demand for documentation relating to building energy performance was low. All the participant councils in the EBP pilot agreed that documentation and information processes need to work more effectively if the potential regulatory and market drivers towards energy efficient homes are to be harnessed. These findings are fully consistent with the Phase 1 NEEBP report. It was also agreed that an EBP system could potentially play an important role in improving documentation and information processes. However, only one of the participant councils indicated that they might adopt such a system on a voluntary basis. The majority felt that such a system would only be taken up if it were: - A nationally agreed system, imposed as a mandatory requirement under state or national regulation; - Capable of being used by multiple parties including councils, private certifiers, building regulators, builders and energy assessors in particular; and - Fully integrated into their existing document management systems, or at least seamlessly compatible rather than a separate, unlinked tool. Further, we note that the value of an EBP in capturing statistical information relating to the energy performance of buildings would be much greater if an EBP were adopted on a nationally consistent basis. Councils were clear that a key impediment to the take up of an EBP system is that they are facing very considerable budget and staffing challenges. They report that they are often unable to meet all community demands from the resources available to them. Therefore they are unlikely to provide resources to support the roll out of an EBP system on a voluntary basis. Overall, we conclude from this pilot that the public good would be well served if the Australian, state and territory governments continued to develop and implement an Electronic Building Passport system in a cost-efficient and effective manner. This development should occur with detailed input from building regulators, the Australian Building Codes Board (ABCB), councils and private certifiers in the first instance. This report provides a suite of recommendations (Section 7.2) designed to advance the development and guide the implementation of a national EBP system.
Resumo:
This report provides an overview of findings of qualitative research comprising three case studies undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. These case studies (see Parts 2, 3 and 4 of this suite of reports) were undertaken to illustrate the nature of past R&D investments in Australia. This was done to complement: (i) the audit and analysis of past R&D investment undertaken by Thomas Barlow (2011); and (ii) the Construction 2030 roadmap being developed by Swinburne University of Technology and Professor Göran Roos from VTT Technical Research Centre of Finland. These documents will be the basis for the final phase of the present project - developing policy guidelines for future R&D investment in the Australian built environment. Refer also Parts 1, 2 and 3 for detail findings.
Resumo:
This report discusses findings of a case study into "CADD, BIM and IPD" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. This case study investigated the evolution that has taken place in the Queensland Department of Public Works Division of Project Services during the last 20 years from: the initial implementation of computer aided design and documentation(CADD); to the experimentation with building information modelling (BIM) from the mid 2000’s; embedding integrated practice (IP); to current steps towards integrated project delivery (IPD) with the integration of contractors in the design/delivery process. This case study should be read in conjunction with Part 1 of this suite of reports.
Resumo:
This report discusses findings of a case study into "Road Construction Safety" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. The Queensland Department of Transport and Main Roads (QTMR) has taken a leadership role in developing a safer working environment for road construction workers. In the past decades, a range of initiatives have been introduced to contribute to improved performance in this area. Several initiatives have been undertaken by QTMR as part of their overarching commitment to safety. Three such initiatives form the basis for this case study investigation, in order to better illustrate the nature of R&D investment and its impact on day-to-day operations and the supply chain. These are the development and implementation of: (i) the Mechanical Traffic Aid: (ii) the Thermal Imaging Camera; and (iii) the Trailer-based CCTV (camera). This case study should be read in conjunction with Part 1 of this suite of reports.
Resumo:
This report discusses findings of a case study into "Green Buildings" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. The Western Australian Government (WAG) has taken a leadership role for a number of decades in developing more environmentally responsive buildings. In the past decade, considerable initiatives have been introduced to contribute to: (i) greening the stock of government buildings; and (ii) providing leadership in the development of other non-residential buildings developed commercially. This role has been informed by global, national and internal initiatives and research in this area. This case study investigates: (i) the nature of this leadership; and (ii) the role of R&D policy development; and (iii) the dissemination and impact of outcomes in the broader industry. This case study should be read in conjunction with Part 1 of this suite of reports.
Resumo:
Objective Uterine Papillary Serous Carcinoma (UPSC) is uncommon and accounts for less than 5% of all uterine cancers. Therefore the majority of evidence about the benefits of adjuvant treatment comes from retrospective case series. We conducted a prospective multi-centre non-randomized phase 2 clinical trial using four cycles of adjuvant paclitaxel plus carboplatin chemotherapy followed by pelvic radiotherapy, in order to evaluate the tolerability and safety of this approach. Methods This trial enrolled patients with newly diagnosed, previously untreated patients with stage 1b-4 (FIGO-1988) UPSC with a papillary serous component of at least 30%. Paclitaxel (175 mg/m2) and carboplatin (AUC 6) were administered on day 1 of each 3-week cycle for 4 cycles. Chemotherapy was followed by external beam radiotherapy to the whole pelvis (50.4 Gy over 5.5 weeks). Completion and toxicity of treatment (Common Toxicity Criteria, CTC) and quality of life measures were the primary outcome indicators. Results Twenty-nine of 31 patients completed treatment as planned. Dose reduction was needed in 9 patients (29%), treatment delay in 7 (23%), and treatment cessation in 2 patients (6.5%). Hematologic toxicity, grade 3 or 4 occurred in 19% (6/31) of patients. Patients' self-reported quality of life remained stable throughout treatment. Thirteen of the 29 patients with stages 1–3 disease (44.8%) recurred (average follow up 28.1 months, range 8–60 months). Conclusion This multimodal treatment is feasible, safe and tolerated reasonably well and would be suitable for use in multi-institutional prospective randomized clinical trials incorporating novel therapies in patients with UPSC.
Resumo:
Over a seven-year period, Mark Radvan directed a suite of children’s theatre productions adapted from the original Tashi stories by Australian writers Anna and Barbara Fienberg. The Tashi Project’s repertoire of plays performed to over 40,000 children aged between 3 and 10 years old, and their carers, in seasons at the Out of the Box Festival, at Brisbane Powerhouse and in venues across Australia in two interstate tours in 2009 and 2010. The project investigated how best to combine an exploration of theatrical forms and conventions, with a performance style evolved in a specially developed training program and a deliberate positioning of young children as audiences capable of sophisticated readings of action, symbol, theme and character. The results of this project show that when brought into appropriate relationship with the theatre artists, young children aged 3-5 can engage with sophisticated narrative forms, and with the right contextual framing they enjoy heightened dramatic and emotional tension, bringing to the event sustained and highly engaged concentration. Older children aged 6-10 also bring sustained and heightened engagement to the same stories, providing that other more sophisticated dramatic elements are woven into the construction of the performances, such as character, theme and style.
Resumo:
Background We hypothesised that alternating inhibitors of the vascular endothelial growth factor receptor (VEGFR) and mammalian target of rapamycin pathways would delay the development of resistance in advanced renal cell carcinoma (aRCC). Patients and methods A single-arm, two-stage, multicentre, phase 2 trial to determine the activity, feasibility, and safety of 12-week cycles of sunitinib 50 mg daily 4 weeks on / 2 weeks off, alternating with everolimus 10 mg daily for 5 weeks on / 1 week off, until disease progression or prohibitive toxicity in favourable or intermediate-risk aRCC. The primary end point was proportion alive and progression-free at 6 months (PFS6m). The secondary end points were feasibility, tumour response, overall survival (OS), and adverse events (AEs). The correlative objective was to assess biomarkers and correlate with clinical outcome. Results We recruited 55 eligible participants from September 2010 to August 2012. Demographics: mean age 61, 71% male, favourable risk 16%, intermediate risk 84%. Cycle 2 commenced within 14 weeks for 80% of participants; 64% received ≥22 weeks of alternating therapy; 78% received ≥22 weeks of any treatment. PFS6m was 29/55 (53%; 95% confidence interval [CI] 40% to 66%). Tumour response rate was 7/55 (13%; 95% CI 4% to 22%, all partial responses). After median follow-up of 20 months, 47 of 55 (86%) had progressed with a median progression-free survival of 8 months (95% CI 5–10), and 30 of 55 (55%) had died with a median OS of 17 months (95% CI 12–undefined). AEs were consistent with those expected for each single agent. No convincing prognostic biomarkers were identified. Conclusions The EVERSUN regimen was feasible and safe, but its activity did not meet pre-specified values to warrant further research. This supports the current approach of continuing anti-VEGF therapy until progression or prohibitive toxicity before changing treatment.
Resumo:
The indoor air quality (IAQ) in buildings is currently assessed by measurement of pollutants during building operation for comparison with air quality standards. Current practice at the design stage tries to minimise potential indoor air quality impacts of new building materials and contents by selecting low-emission materials. However low-emission materials are not always available, and even when used the aggregated pollutant concentrations from such materials are generally overlooked. This paper presents an innovative tool for estimating indoor air pollutant concentrations at the design stage, based on emissions over time from large area building materials, furniture and office equipment. The estimator considers volatile organic compounds, formaldehyde and airborne particles from indoor materials and office equipment and the contribution of outdoor urban air pollutants affected by urban location and ventilation system filtration. The estimated pollutants are for a single, fully mixed and ventilated zone in an office building with acceptable levels derived from Australian and international health-based standards. The model acquires its dimensional data for the indoor spaces from a 3D CAD model via IFC files and the emission data from a building products/contents emissions database. This paper describes the underlying approach to estimating indoor air quality and discusses the benefits of such an approach for designers and the occupants of buildings.
Resumo:
This report is the culmination of a two-stage research project to inform the Australian property and construction industry generally, in addition to providing the Australian Building Codes Board (ABCB) with information to allow it to determine whether or not sustainability requirements are necessary in the Future Building Code of Australia (BCA21). The Australian Building Codes Board is a joint initiative of all levels of government in Australia. The Board’s mission is to provide for efficiency and cost effectiveness in meeting community expectations for health, safety and amenity in the design, construction and use of buildings through the creation of nationally consistent building codes, standards, regulatory requirements and regulatory systems. The Stage 1 (literature review) and Stage 2 (workshops) reports are intended to be read in conjunction with one another. These reports and the Database are provided as appendices. The Conclusions of this, the final report, are the result of the overall program of work.