745 resultados para Performance standards.
em Queensland University of Technology - ePrints Archive
Resumo:
Performance based planning is a form of planning regulation that is not well understood and the theoretical advantages of this type of planning are rarely achieved in practice. Normatively, this type of regulation relies on performance standards that are quantifiable and technically based which are designed to manage the effects of development, where performance standards provide certainty in respect of the level of performance and the means of achievement is flexible. Few empirical studies have attempted to examine how performance based planning has been conceptualised and implemented in practice. Existing literature is predominately anecdotal and consultant based (Baker et al. 2006) and has not sought to quantitatively examine how land use has been managed or determine how context influences implementation. The Integrated Planning Act 1997 (IPA) operated as Queensland’s principal planning legislation between March 1998 and December 2009. The IPA prevented Local Governments from prohibiting development or use and the term zone was absent from the legislation. While the IPA did not use the term performance based planning, the system is widely considered to be performance based in practice (e.g. Baker et al. 2006; Steele 2009a, 2009b). However, the degree to which the IPA and the planning system in Queensland is performance based is debated (e.g. Yearbury 1998; England 2004). Four research questions guided the research framework using Queensland as the case study. The questions sought to: determine if there is a common understanding of performance based planning; identify how performance based planning was expressed under the IPA; understand how performance based planning was implemented in plans; and explore the experiences of participants in the planning system. The research developed a performance adoption spectrum. The spectrum describes how performance based planning is implemented, ranging between pure and hybrid interpretations. An ex-post evaluation of seventeen IPA plans sought to determine plan performativity within the conceptual spectrum. Land use was examined from the procedural dimension of performance (Assessment Tables) and the substantive dimension of performance (Codes). A documentary analysis and forty one interviews supplemented the research. The analytical framework considered how context influenced performance based planning, including whether: the location of the local government affected land use management techniques; temporal variation in implementation exists; plan-making guidelines affected implementation; different perceptions of the concept exist; this type of planning applies to a range of spatial scales. Outcomes were viewed as the medium for determining the acceptability of development in Queensland, a significant departure from pure approaches found in the United States. Interviews highlighted the absence of plan-making direction in the IPA, which contributed to the confusion about the intended direction of the planning system and the myth that the IPA would guarantee a performance based system. A hybridised form of performance based planning evolved in Queensland which was dependent on prescriptive land use zones and specification of land use type, with some local governments going to extreme lengths to discourage certain activities in a predetermined manner. Context had varying degrees of influence on plan-making methods. Decision-making was found to be inconsistent and the system created a range of unforeseen consequences including difficulties associated with land valuation, increased development speculation, and the role of planners in court was found to be less critical than in the previous planning system.
Resumo:
The determination of performance standards and assessment practices in regard to student work placements is an essential and important task. Inappropriate, inadequate, or excessively complex assessment tasks can influence levels of student engagement and the quality of learning outcomes. Critical to determining appropriate standards and assessment tasks is an understanding and knowledge of key elements of the learning environment and the extent to which opportunities are provided for students to engage in critical reflection and judgement of their own performance in the contexts of the work environment. This paper focuses on the development of essential skills and knowledge (capabilities) that provide evidence of learning in work placements by describing an approach taken in the science and technology disciplines. Assessment matrices are presented to illustrate a method of assessment for use within the context of the learning environment centred on work placements in science and technology. This study contributes to the debate on the meaning of professional capability, performance standards and assessment practices in work placement programs by providing evidence of an approach that can be adapted by other programs to achieve similar benefits. The approach may also be valuable to other learning contexts where capability and performance are being judged in situations that are outside a controlled teaching and learning environment i.e. in other life-wide learning contexts.
Resumo:
Assurance of Learning is a focus for many Business Schools to meet AACSB requirements. Prior research has examined student self-assessment as a measure of learning in this context, but we propose instead that this is a useful ‘learning tool’ for students and instructors that can help improve student performance and curricula. We examined self-assessment in a third year undergraduate e-marketing course and found a positive, though weak relationship between student self-assessment and instructor ratings on intended learning goals and criteria for a written assignment. Students who self-assessed tended to perform better in the assessment item and course than those who did not self-assess. But less competent students were more inaccurate in their self-assessment, suggesting a need to enhance understanding of marking criteria and performance standards within this group. Implications for educators are discussed.
Resumo:
Performance based planning (PBP) is purported to be a viable alternative to traditional zoning. The implementation of PBP ranges between pure approaches that rely on predetermined quantifiable performance standards to determine land use suitability, and hybrid approaches that rely on a mix of activity based zones in addition to prescriptive and subjective standards. Jurisdictions in the USA, Australia and New Zealand have attempted this type of land use regulation with varying degrees of success. Despite the adoption of PBP legislation in these jurisdictions, this paper argues that a lack of extensive evaluation means that PBP is not well understood and the purported advantages of this type of planning are rarely achieved in practice. Few empirical studies have attempted to examine how PBP has been implemented in practice. In Queensland, Australia, the Integrated Planning Act 1997 (IPA) operated as Queensland's principal planning legislation between March 1998 and December 2009. While the IPA did not explicitly use the term performance based planning, the Queensland's planning system is widely considered to be performance based in practice. Significantly, the IPA prevented Local Government from prohibiting development or use and the term zone was absent from the legislation. How plan-making would be advanced under the new planning regime was not clear, and as a consequence local governments produced a variety of different plan-making approaches to comply with the new legislative regime. In order to analyse this variation the research has developed a performance adoption spectrum to classify plans ranging between pure and hybrid perspectives of PBP. The spectrum compares how land use was regulated in seventeen IPA plans across Queensland. The research found that hybrid plans predominated, and that over time a greater reliance on risk adverse drafting approaches created a quasi-prohibition plan, the exact opposite of what was intended by the IPA. This paper concludes that the drafting of the IPA and absence of plan-making guidance contributed to lack of shared understanding about the intended direction of the new planning system and resulted in many administrative interpretations of the legislation. It was a planning direction that tried too hard to be different, and as a result created a perception of land use risk and uncertainty that caused a return to more prescriptive and inflexible plan-making methods.
Resumo:
Client-side project managers face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation under a successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest that motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisations throughout a project to continuously encourage motivation under changing project conditions.
Resumo:
This thesis is the result of an investigation of a Queensland example of curriculum reform based on outcomes, a type of reform common to many parts of the world during the last decade. The purpose of the investigation was to determine the impact of outcomes on teacher perspectives of professional practice. The focus was chosen to permit investigation not only of changes in behaviour resulting from the reform but also of teachers' attitudes and beliefs developed during implementation. The study is based on qualitative methodology, chosen because of its suitability for the investigation of attitudes and perspectives. The study exploits the researcher's opportunities for prolonged, direct contact with groups of teachers through the selection of an over-arching ethnography approach, an approach designed to capture the holistic nature of the reform and to contextualise the data within a broad perspective. The selection of grounded theory as a basis for data analysis reflects the open nature of this inquiry and demonstrates the study's constructivist assumptions about the production of knowledge. The study also constitutes a multi-site case study by virtue of the choice of three individual school sites as objects to be studied and to form the basis of the report. Three primary school sites administered by Brisbane Catholic Education were chosen as the focus of data collection. Data were collected from three school sites as teachers engaged in the first year of implementation of Student Performance Standards, the Queensland version of English outcomes based on the current English syllabus. Teachers' experience of outcomes-driven curriculum reform was studied by means of group interviews conducted at individual school sites over a period of fourteen months, researcher observations and the collection of artefacts such as report cards. Analysis of data followed grounded theory guidelines based on a system of coding. Though classification systems were not generated prior to data analysis, the labelling of categories called on standard, non-idiosyncratic terminology and analytic frames and concepts from existing literature wherever practicable in order to permit possible comparisons with other related research. Data from school sites were examined individually and then combined to determine teacher understandings of the reform, changes that have been made to practice and teacher responses to these changes in terms of their perspectives of professionalism. Teachers in the study understood the reform as primarily an accountability mechanism. Though teachers demonstrated some acceptance of the intentions of the reform, their responses to its conceptualisation, supporting documentation and implications for changing work practices were generally characterised by reduced confidence, anger and frustration. Though the impact of outcomes-based curriculum reform must be interpreted through the inter-relationships of a broad range of elements which comprise teachers' work and their attitudes towards their work, it is proposed that the substantive findings of the study can be understood in terms of four broad themes. First, when the conceptual design of outcomes did not serve teachers' accountability requirements and outcomes were perceived to be expressed in unfamiliar technical language, most teachers in the study lost faith in the value of the reform and lost confidence in their own abilities to understand or implement it. Second, this reduction of confidence was intensified when the scope of outcomes was outside the scope of the teachers' existing curriculum and assessment planning and teachers were confronted with the necessity to include aspects of syllabuses or school programs which they had previously omitted because of a lack of understanding or appreciation. The corollary was that outcomes promoted greater syllabus fidelity when frameworks were closely aligned. Third, other benefits the teachers associated with outcomes included the development of whole school curriculum resources and greater opportunity for teacher collaboration, particularly among schools. The teachers, however, considered a wide range of factors when determining the overall impact of the reform, and perceived a number of them in terms of the costs of implementation. These included the emergence of ethical dilemmas concerning relationships with students, colleagues and parents, reduced individual autonomy, particularly with regard to the selection of valued curriculum content and intensification of workload with the capacity to erode the relationships with students which teachers strongly associated with the rewards of their profession. Finally, in banding together at the school level to resist aspects of implementation, some teachers showed growing awareness of a collective authority capable of being exercised in response to top-down reform. These findings imply that Student Performance Standards require review and, additional implementation resourcing to support teachers through times of reduced confidence in their own abilities. Outcomes prove an effective means of high-fidelity syllabus implementation, and, provided they are expressed in an accessible way and aligned with syllabus frameworks and terminology, should be considered for inclusion in future syllabuses across a range of learning areas. The study also identifies a range of unintended consequences of outcomes-based curriculum and acknowledges the complexity of relationships among all the aspects of teachers' work. It also notes that the impact of reform on teacher perspectives of professional practice may alter teacher-teacher and school-system relationships in ways that have the potential to influence the effectiveness of future curriculum reform.
Resumo:
As the use of renewable energy sources (RESs) increases worldwide, there is a rising interest on their impacts on power system operation and control. An overview of the key issues and new challenges on frequency regulation concerning the integration of renewable energy units into the power systems is presented. Following a brief survey on the existing challenges and recent developments, the impact of power fluctuation produced by variable renewable sources (such as wind and solar units) on sysstem frequency performance is also presented. An updated LFC model is introduced, and power system frequency response in the presence of RESs and associated issues is analysed. The need for the revising of frequency performance standards is emphasised. Finally, non-linear time-domain simulations on the standard 39-bus and 24-bus test systems show that the simulated results agree with those predicted analytically.
Resumo:
Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.
Resumo:
Client-side project manager face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation undera successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest the motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisation throughout a project to continuously encourage motivation under changing project conditions.
Resumo:
This report investigates lessons learned by educators in the United States when providing a standards-based curriculum for all students including Students with Disabilities (SWD). Assumptions about implementation of these lessons are then made to the Queensland school system. Queensland mainstream schools currently provide a standards-based curriculum for over sixteen thousand-four hundred students with mild-moderate disabilities and appear to be challenged by this new educational reform and its implications to school and teacher practices, beliefs and attitudes. The analysis of US research, literature and educational policy for this report, has provided some implications for Queensland schools in the areas of student participation, achievement and curriculum planning to provide an “education for all”. The analysis and comparison of legislation and policy, which demonstrates some significant similarities, provides greater validity for the application of lessons learned in the United States to the Queensland context. The key findings about lessons learned provides Queensland schools with some assumptions as to why and how they need to refocus school leader and teachers’ practices, beliefs and attitudes to provide an “education for all”. These lessons infer that school leaders and teachers to explicitly focus on equity, expectation, accountability, performance, alignment and collaboration so that effective curriculum is provided for SWD, indeed all students, in the Queensland standards-based curriculum environment.
Standards, teacher judgement and moderation in contexts of national curriculum and assessment reform
Resumo:
This paper puts forward a proposal for reviewing the role and purpose of standards in the context of national curriculum and assessment reform more generally. It seeks to commence the much-needed conversation about standards in the work of teachers as distinct from large-scale testing companies and the policy personnel responsible for reporting. Four key conditions that relate to the effective use of standards to measure improvement and support learning are analysed: clarity about purpose and function; understanding of the representation of standards; moderation practice; and the assessment community. The Queensland experience of the use of standards, teacher judgement and moderation is offered to identify what is educationally preferable in terms of their use and their relationships to curriculum, improvement and accountability. The article illustrates how these practices have recently been challenged by emerging political constraints related to the Australian Government’s implementation of national testing and national partnership funding arrangements tied to the performance of students at or below minimum standards.
Resumo:
Many ageing road bridges, particularly timber bridges, require urgent improvement due to the demand imposed by the recent version of the Australian bridge loading code, AS 5100. As traffic volume plays a key role in the decision of budget allocations for bridge refurbishment/ replacement, many bridges in low volume traffic network remain in poor condition with axle load and/ or speed restrictions, thus disadvantaging many rural communities. This thesis examines an economical and environmentally sensible option of incorporating disused flat rail wagons (FRW) in the construction of bridges in low volume, high axle load road network. The constructability, economy and structural adequacy of the FRW road bridge is reported in the thesis with particular focus of a demonstration bridge commissioned in regional Queensland. The demonstration bridge comprises of a reinforced concrete slab (RCS) pavement resting on two FRWs with custom designed connection brackets at regular intervals along the span of the bridge. The FRW-RC bridge deck assembly is supported on elastomeric rubber pads resting on the abutment. As this type of bridge replacement technology is new and its structural design is not covered in the design standards, the in-service structural performance of the FRW bridge subjected to the high axle loadings prescribed in AS 5100 is examined through performance load testing. Both the static and the moving load tests are carried out using a fully laden commonly available three-axle tandem truck. The bridge deck is extensively strain gauged and displacement at several key locations is measured using linear variable displacement transducers (LVDTs). A high speed camera is used in the performance test and the digital image data are analysed using proprietary software to capture the locations of the wheel positions on the bridge span accurately. The wheel location is thus synchronised with the displacement and strain time series to infer the structural response of the FRW bridge. Field test data are used to calibrate a grillage model, developed for further analysis of the FRW bridge to various sets of high axle loads stipulated in the bridge design standard. Bridge behaviour predicted by the grillage model has exemplified that the live load stresses of the FRW bridge is significantly lower than the yield strength of steel and the deflections are well below the serviceability limit state set out in AS 5100. Based on the results reported in this thesis, it is concluded that the disused FRWs are competent to resist high axle loading prescribed in AS 5100 and are a viable alternative structural solution of bridge deck in the context of the low volume road networks.
Resumo:
The use of professional competency standards to assess postgraduate nursing student’s clinical performance has been in place since 2004, at the Queensland University of Technology, School of Nursing & Midwifery (SONAM) when the Graduate Certificate in Emergency Nursing degree commenced. Emergency nursing students were assessed in their workplace, using a Clinical Performance Appraisal Tool or CPAT which was based on the Australian College of Critical Care Nurses (ACCCN) Competency Standards. With the subsequent formation of a separate Emergency Nursing Course advisory group in 2007, there was a review of clinical assessment course component. The release of the 2008 CENA revised Practice Standards for the Emergency Nursing Specialist’s, led to the emergency nursing course advisory committee supporting the integration of the CENA practice standards for assessment of emergency nurses in preference to the less relevant ACCCN competency standards. The SONAM emergency nursing study area team commenced the phasing in and progression of the CENA practice standards across the two Graduate Certificate units, and Graduate Diploma and Master of Nursing (emergency) clinical major options in 2009. As some units undertaken in the degree are available to nurses in other disciplines a separate CPAT was devised for the clinical assessments according to speciality context. The team has had to carefully consider how the professional standards are integrated into the teaching and assessment of the unit and not just applied instead of the ACCCN competency standards. Professional standards for the emergency context has also helped tailor course content and learning outcomes to be relevant across a number of emergency nursing contexts in Australia. The assessment of the CPAT is undertaken at the workplace by QUT appointed clinical lecturers. Clinical lecturers need to apply and have suitable postgraduate qualification to undertake the position. The clinical lecturer support role is well established at QUT. The integration of the new CENA practice standards has necessitated a review of the postgraduate assessment of emergency nurses. A clinical lecturer workshop has been organised to review role, scope and how to utilise the new look CENA based CPAT, clinical assessment format.