83 resultados para Partnership urban operation of the Port

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The flood flow in urbanised areas constitutes a major hazard to the population and infrastructure as seen during the summer 2010-2011 floods in Queensland (Australia). Flood flows in urban environments have been studied relatively recently, although no study considered the impact of turbulence in the flow. During the 12-13 January 2011 flood of the Brisbane River, some turbulence measurements were conducted in an inundated urban environment in Gardens Point Road next to Brisbane's central business district (CBD) at relatively high frequency (50 Hz). The properties of the sediment flood deposits were characterised and the acoustic Doppler velocimeter unit was calibrated to obtain both instantaneous velocity components and suspended sediment concentration in the same sampling volume with the same temporal resolution. While the flow motion in Gardens Point Road was subcritical, the water elevations and velocities fluctuated with a distinctive period between 50 and 80 s. The low frequency fluctuations were linked with some local topographic effects: i.e, some local choke induced by an upstream constriction between stairwells caused some slow oscillations with a period close to the natural sloshing period of the car park. The instantaneous velocity data were analysed using a triple decomposition, and the same triple decomposition was applied to the water depth, velocity flux, suspended sediment concentration and suspended sediment flux data. The velocity fluctuation data showed a large energy component in the slow fluctuation range. For the first two tests at z = 0.35 m, the turbulence data suggested some isotropy. At z = 0.083 m, on the other hand, the findings indicated some flow anisotropy. The suspended sediment concentration (SSC) data presented a general trend with increasing SSC for decreasing water depth. During a test (T4), some long -period oscillations were observed with a period about 18 minutes. The cause of these oscillations remains unknown to the authors. The last test (T5) took place in very shallow waters and high suspended sediment concentrations. It is suggested that the flow in the car park was disconnected from the main channel. Overall the flow conditions at the sampling sites corresponded to a specific momentum between 0.2 to 0.4 m2 which would be near the upper end of the scale for safe evacuation of individuals in flooded areas. But the authors do not believe the evacuation of individuals in Gardens Point Road would have been safe because of the intense water surges and flow turbulence. More generally any criterion for safe evacuation solely based upon the flow velocity, water depth or specific momentum cannot account for the hazards caused by the flow turbulence, water depth fluctuations and water surges.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The reliable operation of the electrical system at Callide Power Station is of extreme importance to the normal everyday running of the Station. This study applied the principles of reliability to do an analysis on the electrical system at Callide Power Station. It was found that the level of expected outage cost increased exponentially with a declining level of maintenance. Concluding that even in a harsh economic electricity market where CS Energy tries and push their plants to the limit, maintenance must not be neglected. A number of system configurations were found to increase the reliability of the system and reduce the expected outage costs. A number of other advantages were identified as a result of using reliability principles to do this study on the Callide electrical system configuration.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: The quality of stormwater runoff from ports is significant as it can be an important source of pollution to the marine environment. This is also a significant issue for the Port of Brisbane as it is located in an area of high environmental values. Therefore, it is imperative to develop an in-depth understanding of stormwater runoff quality to ensure that appropriate strategies are in place for quality improvement, where necessary. To this end, the Port of Brisbane Corporation aimed to develop a port specific stormwater model for the Fisherman Islands facility. The need has to be considered in the context of the proposed future developments of the Port area. ----------------- The Project: The research project is an outcome of the collaborative Partnership between the Port of Brisbane Corporation (POBC) and Queensland University of Technology (QUT). A key feature of this Partnership is that it seeks to undertake research to assist the Port in strengthening the environmental custodianship of the Port area through ‘cutting edge’ research and its translation into practical application. ------------------ The project was separated into two stages. The first stage developed a quantitative understanding of the generation potential of pollutant loads in the existing land uses. This knowledge was then used as input for the stormwater quality model developed in the subsequent stage. The aim is to expand this model across the yet to be developed port expansion area. This is in order to predict pollutant loads associated with stormwater flows from this area with the longer term objective of contributing to the development of ecological risk mitigation strategies for future expansion scenarios. ----------------- Study approach: Stage 1 of the overall study confirmed that Port land uses are unique in terms of the anthropogenic activities occurring on them. This uniqueness in land use results in distinctive stormwater quality characteristics different to other conventional urban land uses. Therefore, it was not scientifically valid to consider the Port as belonging to a single land use category or to consider as being similar to any typical urban land use. The approach adopted in this study was very different to conventional modelling studies where modelling parameters are developed using calibration. The field investigations undertaken in Stage 1 of the overall study helped to create fundamental knowledge on pollutant build-up and wash-off in different Port land uses. This knowledge was then used in computer modelling so that the specific characteristics of pollutant build-up and wash-off can be replicated. This meant that no calibration processes were involved due to the use of measured parameters for build-up and wash-off. ---------------- Conclusions: Stage 2 of the study was primarily undertaken using the SWMM stormwater quality model. It is a physically based model which replicates natural processes as closely as possible. The time step used and catchment variability considered was adequate to accommodate the temporal and spatial variability of input parameters and the parameters used in the modelling reflect the true nature of rainfall-runoff and pollutant processes to the best of currently available knowledge. In this study, the initial loss values adopted for the impervious surfaces are relatively high compared to values noted in research literature. However, given the scientifically valid approach used for the field investigations, it is appropriate to adopt the initial losses derived from this study for future modelling of Port land uses. The relatively high initial losses will reduce the runoff volume generated as well as the frequency of runoff events significantly. Apart from initial losses, most of the other parameters used in SWMM modelling are generic to most modelling studies. Development of parameters for MUSIC model source nodes was one of the primary objectives of this study. MUSIC, uses the mean and standard deviation of pollutant parameters based on a normal distribution. However, based on the values generated in this study, the variation of Event Mean Concentrations (EMCs) for Port land uses within the given investigation period does not fit a normal distribution. This is possibly due to the fact that only one specific location was considered, namely the Port of Brisbane unlike in the case of the MUSIC model where a range of areas with different geographic and climatic conditions were investigated. Consequently, the assumptions used in MUSIC are not totally applicable for the analysis of water quality in Port land uses. Therefore, in using the parameters included in this report for MUSIC modelling, it is important to note that it may result in under or over estimations of annual pollutant loads. It is recommended that the annual pollutant load values given in the report should be used as a guide to assess the accuracy of the modelling outcomes. A step by step guide for using the knowledge generated from this study for MUSIC modelling is given in Table 4.6. ------------------ Recommendations: The following recommendations are provided to further strengthen the cutting edge nature of the work undertaken: * It is important to further validate the approach recommended for stormwater quality modelling at the Port. Validation will require data collection in relation to rainfall, runoff and water quality from the selected Port land uses. Additionally, the recommended modelling approach could be applied to a soon-to-be-developed area to assess ‘before’ and ‘after’ scenarios. * In the modelling study, TSS was adopted as the surrogate parameter for other pollutants. This approach was based on other urban water quality research undertaken at QUT. The validity of this approach should be further assessed for Port land uses. * The adoption of TSS as a surrogate parameter for other pollutants and the confirmation that the <150 m particle size range was predominant in suspended solids for pollutant wash-off gives rise to a number of important considerations. The ability of the existing structural stormwater mitigation measures to remove the <150 m particle size range need to be assessed. The feasibility of introducing source control measures as opposed to end-of-pipe measures for stormwater quality improvement may also need to be considered.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes an autonomous docking system and web interface that allows long-term unaided use of a sophisticated robot by untrained web users. These systems have been applied to the biologically inspired RatSLAM system as a foundation for testing both its long-term stability and its practicality. While docking and web interface systems already exist, this system allows for a significantly larger margin of error in docking accuracy due to the mechanical design, thereby increasing robustness against navigational errors. Also a standard vision sensor is used for both long-range and short-range docking, compared to the many systems that require both omni-directional cameras and high resolution Laser range finders for navigation. The web interface has been designed to accommodate the significant delays experienced on the Internet, and to facilitate the non- Cartesian operation of the RatSLAM system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The study of urban morphology has become an expanding field of research within the architectural discipline, providing theories to be used as tools in the understanding and design of urban landscapes from the past, the present and into the future. Drawing upon contemporary architectural design theory, this investigation reveals what a sectional analysis of an urban landscape can add to the existing research methods within this field. This paper conducts an enquiry into the use of the section as a tool for urban morphological analysis. Following the methodology of the British school of urban morphology, sections through the urban fabric of the case study city of Brisbane are compared. The results are categorised to depict changes in scale, components and utilisation throughout various timeframes. The key findings illustrate how the section, when read in conjunction with the plan can be used to interpret changes to urban form and the relationship that this has to the quality of the urban environment in the contemporary city.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Traditional towns of the Kathmandu Valley boast a fine provision of public spaces in their neighbourhoods. Historically, a hierarchy of public space has been distributed over the entire town with each neighbourhood centered around more or less spacious public squares. However, rapid growth of these towns over the past decades has resulted in haphazard development of new urban areas with little provision of public space. Recent studies indicate that the loss of public space is a major consequence of the uncontrolled urban growth of the Kathmandu Valley and its new neighbourhoods. This paper reviews the current urban growth of the Kathmandu Valley and its impact on the development of public space in new neighbourhoods. The preliminary analysis of the case study of three new neighbourhoods shows that the formation and utilization of neighbourhood public space exhibit fundamental differences from those found in the traditional city cores. The following key issues are identified in this paper: a) Governance and regulations have been a challenge to regulate rapid urban growth; b) The current pattern of neighbourhood formation is found to be different from that of traditional neighbourhoods due to the changes with rapid urban development; c) Public spaces have been compromised in both planned and unplanned new neighbourhoods in terms of their quantity and quality; d) The changing provision of public space has contributed to its changing use and meaning; and e) The changing demographic composition, changing society and life style have had direct impact on the declining use of public space. Moreover, the management of public spaces remains a big challenge due to their changing nature and the changing governance. The current transformation public space does not appear to be conducive, and has led to adversely changing social environment of the new neighbourhoods.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Critical to the research of urban morphologists is the availability of historical records that document the urban transformation of the study area. However, thus far little work has been done towards an empirical approach to the validation of archival data in this field. Outlined in this paper, therefore, is a new methodology for validating the accuracy of archival records and mapping data, accrued through the process of urban morphological research, so as to establish a reliable platform from which analysis can proceed. The paper particularly addresses the problems of inaccuracies in existing curated historical information, as well as errors in archival research by student assistants, which together give rise to unacceptable levels of uncertainty in the documentation. The paper discusses the problems relating to the reliability of historical information, demonstrates the importance of data verification in urban morphological research, and proposes a rigorous method for objective testing of collected archival data through the use of qualitative data analysis software.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Co-operative Research Centre for Construction Innovation (CRC-CI) is funding a project known as Value Alignment Process for Project Delivery. The project consists of a study of best practice project delivery and the development of a suite of products, resources and services to guide project teams towards the best procurement approach for a specific project or group of projects. These resources will be focused on promoting the principles that underlie best practice project delivery rather than simply identifying an off-the-shelf procurement system. This project builds on earlier work by Sidwell, Kennedy and Chan (2002), on re-engineering the construction delivery process, which developed a procurement framework in the form of a Decision Matrix

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Partnering has been defined in many ways. It can be considered as an individual project mechanism or can be considered as a long term strategy. Alliancing is normally assumed to be a long term business strategy linking together client, contractor and supply chain. Relational contracting goes further than this and brings in the whole philosophy of the value chain and the linking of the interdependent parts within the construction project as a key business objective. This document aims to review existing definitions of these three concepts and present and overview of the current state of-the-art in terms of their use and implementation. The document should be useful for all of those project team members looking to sharpen their understanding of the various concepts and will also provide a platform for debating the current state of the definitions and implementations being used in Main Roads and Public Works Departments.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Section 35 of the Insurance Contracts Act 1984 requires insurers offering insurance policies in six prescribed areas "to clearly inform" prospective insureds of any departure their policies may constitute from the standard covers established by the Act and its accompanying Regulations. This prescribed insurance contracts regime was designed to remedy comprehension problems generated by the length and complexity of insurance documents and to alleviate misunderstanding over the terms and conditions of individual policies. This article examines the rationale underpinning s 35 and the prescribed insurance contracts regime and looks at the operation of the legislation with particular reference to home contents insurance in Australia. It is argued that the means whereby disclosure of derogation from standard cover may be effected largely negates the thrust of the prescribed insurance contract reform. Recommendations to address these operational deficiencies are made.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article continues the critical analysis of ‘meaningful relationships’ in the context of the operation of the ‘twin pillars’ which underpin the parenting provisions. It will be argued that the attitude of judicial officers to three key questions influence how they interpret this concept and consequently apply the best interest considerations. Relevant to this discussion is an examination of the Full Court’s approach to the key parenting sections, particularly the interaction of the primary and additional considerations. Against this backdrop, a current proposal to amend the ‘twin pillars’ will be examined.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pilot Youth Courts were introduced at Hamilton Sheriff Court in June 2003 and at Airdrie Sheriff Court in June 2004. Although introduced as one of a number of measures aimed at responding more effectively to youth crime (including young people dealt with through the Children’s Hearings System), the Youth Courts were intended for young people who would otherwise have been dealt with in the adult Sheriff Summary Court. The objectives of the pilot Youth Courts were to: • reduce the frequency and seriousness of re-offending by 16 and 17 year old offenders, particularly persistent offenders (and some 15 year olds who are referred to the court); • promote the social inclusion, citizenship and personal responsibility of these young offenders while maximising their potential; • establish fast track procedures for those young persons appearing before the Youth Court; • enhance community safety, by reducing the harm caused to individual victims of crime and providing respite to those communities which are experiencing high levels of crime; and • test the viability and usefulness of a Youth Court using existing legislation and to demonstrate whether legislative and practical improvements might be appropriate. Evaluation of the Hamilton and Airdrie Sheriff Youth Court pilots suggested that they had been successful in meeting the objectives set for them by the Youth Court Feasibility Group. Both were tightly run courts that dealt with a heavy volume of business. The particular strengths of the Youth Court model over previous arrangements included the fast-tracking of young people to and through the court, the reduction in trials, the availability of a wider range of resources and services for young people and ongoing judicial review. The successful operation of the pilot Youth Courts was dependent upon effective teamwork among the relevant agencies and professionals concerned. Good information sharing, liaison and communication appeared to exist across agencies and the procedures that were in place to facilitate the sharing of information seemed to be working well. This was also facilitated by the presence of dedicated staff within agencies, resulting in clear channels of communication, and in the opportunity provided by the multi-agency Implementation Groups to identify and address operational issues on an ongoing basis. However, whether Youth Courts are required in Scotland or whether procedural improvement were possible in the absence of dedicated resources and personnel was more difficult to assess. Two issues in particular required further attention. First, consideration needed to be given to whether the Youth Courts should be more explicitly youth focused and what this might entail. Second, greater clarity was required regarding for whom the Youth Courts were intended. This suggested the need for further discussion of Youth Court targeting and its potential consequences among the various agencies concerned.