181 resultados para Maturity Levels

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Management of project knowledge is a critical factor for project success. Project Management Office (PMO) is a unit within organisations to centrally facilitate, manage and control organisational project for improving the rate of project success. Due to increasing interest of developing PMO, the Project Management Maturity Model (PMMM) has been proposed to develop PMOs gradually. The PMMM contributes to evolvement of PMO from immature to mature level through addressing appropriate PM practices. Despite the importance of project knowledge, it has not been extensively investigated in project environments. In addition, the existing PMMMs not only do not address management of project knowledge, but also they recommend little criteria to assess the maturity of PMO from KM point of view. The absence of KM discussion in current PMMMs was defined as the subject of a research project in order for addressing KM practices at various maturity levels of PMO. In order to address the mentioned gap, a framework has been developed based on the current discussions of both PM and KM. The proposed framework comprises three premises: KM processes and practices, PMMM, and KM Maturity Model (KMMM). The incorporation of KMMM practices at various maturity levels of PMO is one of the significance of this framework. It proposes numbers of KM strategies, processes, and practices to address project knowledge management at various levels PMO. This framework shall be useful guidance for developing PMOs from KM perspective. In other words, it contributes to management of project knowledge, as a key for project success. The proposed framework follows the process-based approach and it could be employed alongside the current PMMMs for PMO development. This paper presents the developed framework, theoretical background, premises, proposed KM practices, and processes to be employed in Project-based Organisations and PMOs. This framework has been examined at numbers of case studies with different maturity levels. The case studies outcomes, which will be subjects for future papers, have not shown any significant contradiction yet, however, more investigations are being conducted to validate the proposed framework.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis is an exploratory study to scrutinise Project Knowledge Management in Project-Based Organisations, specifically in the Project Management Office (PMO). It is the first attempt to investigate the maturity of Project Management, from a Knowledge Management perspective. The findings of this study address multiple Knowledge Management processes and practices to both assess the level of Knowledge Management Maturity in PMOs, and improve the capability of Project Knowledge Management in Project-based Organisations. This research significantly contributes to bridge the current gap in the existing Project Management Maturity Models.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The adoption of e-business by the Australian construction industry lags other service and product industries. It is assumed that slow adoption rate does not reflect the maturity of the technology but is due to adoption impediments peculiar to the nature of construction. This chapter examines impediments to the uptake of e-business nationally and internationally. A systematic and extensive literature search of impediments (also referred to as obstacles, impediments or hindrances) to adoption has been undertaken and the findings discussed in this chapter. This review included more that 200 documents and these have been published in a searchable database as part of a larger research initiative funded by the Cooperative Research Centre for Construction Innovation. The influence of levels of e-business maturity seen in other sectors such as retail, tourism and manufacturing was also captured and a number of major impediments were identified some including: privacy, trust, uncertainty of financial returns, lack of reliable measurement, fraud, lack of support and system maintenance. A total of 23 impediments were assessed in terms of impact to organisational type and size across reviewed documents. With this information it was possible to develop a reference framework for measuring maturity levels and readiness to uptake e-business in construction. Results have also shown that impediments to e-business adoption work differently according to organisational type and culture. Areas of training and people development need to be addressed. This would include a more sensitive approach to the nature of construction organisations, especially to those small and medium enterprises. Raising levels of awareness and creating trust for on-line collaboration are other aspects that need attention, which current studies confirm as lacking. An empirical study within construction, to validate these findings, forms the subsequent phase of this research.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The adoption of e-business by the Australian construction industry lags other service and product industries. It is assumed that slow adoption rate does not reflect the maturity of the technology but is due to adoption barriers peculiar to the nature of construction. This paper examines impediments to the uptake of e-business nationally and internationally. A systematic and extensive literature search of barriers (also referred to as obstacles, impediments or hindrances) to adoption has been undertaken and the findings discussed in this paper. This review included more that 200 documents and these have been published in a searchable database as part of a larger research initiative funded by the Cooperative Research Centre for Construction Innovation. The influence of levels of e-business maturity seen in other sectors such as retail, tourism and manufacturing was also captured and a number of major barriers were identified some including: privacy, trust, uncertainty of financial returns, lack of reliable measurement, fraud, lack of support and system maintenance. A total of 23 barriers were assessed in terms of impact to organisational type and size across reviewed documents. With this information it was possible to develop a reference framework for measuring maturity levels and readiness to uptake e-business in construction. Results have also shown that barriers to e-business adoption work differently according to organisational type and culture. Areas of training and people development need to be addressed. This would include a more sensitive approach to the nature of construction organisations, especially to those small and medium enterprises. Raising levels of awareness and creating trust for on-line collaboration are other aspects that need attention, which current studies confirm as lacking. An empirical study within construction, to validate these findings, forms the subsequent phase of this research.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

IT Governance (ITG) adoption remains a relevant topic of study. While extensive research has been done looking into the drivers and critical success factors of ITG practice, there seems to be a lack of interest in identifying the barriers to its adoption. This study reports on a survey conducted to first: provide some primary data that suggest ITG adoption and maturity levels are still low, especially in a developing country like Malaysia; and second: to provide initial empirical support for model development. Results obtained supported our assumptions that: (1) ITG adoption and maturity levels are still relatively low in Malaysia, therefore justifying Malaysia as a suitable case; (2) organizational factors, environmental factors and characteristics of the innovation as identified from the literature may serve as possible barriers to adoption.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Asset service organisations often recognize asset management as a core competence to deliver benefits to their business. But how do organizations know whether their asset management processes are adequate? Asset management maturity models, which combine best practices and competencies, provide a useful approach to test the capacity of organisations to manage their assets. Asset management frameworks are required to meet the dynamic challenges of managing assets in contemporary society. Although existing models are subject to wide variations in their implementation and sophistication, they also display a distinct weakness in that they tend to focus primarily on the operational and technical level and neglect the levels of strategy, policy and governance as well as the social and human resources – the people elements. Moreover, asset management maturity models have to respond to the external environmental factors, including such as climate change and sustainability, stakeholders and community demand management. Drawing on five dimensions of effective asset management – spatial, temporal, organisational, statistical, and evaluation – as identified by Amadi Echendu et al. [1], this paper carries out a comprehensive comparative analysis of six existing maturity models to identify the gaps in key process areas. Results suggest incorporating these into an integrated approach to assess the maturity of asset-intensive organizations. It is contended that the adoption of an integrated asset management maturity model will enhance effective and efficient delivery of services.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Although they sit outside the formal education sector, libraries are intrinsically centres of learning where people can engage with knowledge and ideas and acquire the literacy skills that are essential for active participation in an increasingly digital society. In Australia, National and State Libraries Australasia (NSLA) has acknowledged the need to not only better understand the general concept of the library as a learning institution, but also to help the individual NSLA libraries specifically identify their capabilities in this arena. The NSLA Literacy and Learning project aimed to improve the members' organisational comprehension and practice as learning institutions and to help them conceptualise their ability to deliver literacy and learning programmes that will benefit their staff and their communities. The NSLA concept of learning institution encompassed two discrete lenses: the internal lens of the library's own organisational understanding and practice, and the external lens of the clients who engage in the literacy and learning programmes delivered by the library. The ultimate goal was to develop a matrix which could enable libraries to assess their perceived levels of maturity as learning institutions along a continuum of emerging to active capabilities. The matrix should also serve as a tool for shared understanding about the NSLA's own strategic directions in the literacy and learning space. This case study documents the evolving process of developing a learning institution maturity framework for libraries that considers individual, team and organisational learning, as well as clients' interactions with the organisation, with the goal of producing a framework that has the potential to measure the value of learning and growth in both the library's staff and the library's communities

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Air pollution levels were monitored continuously over a period of 4 weeks at four sampling sites along a busy urban corridor in Brisbane. The selected sites were representative of industrial and residential types of urban environment affected by vehicular traffic emissions. The concentration levels of submicrometer particle number, PM2.5, PM10, CO, and NOx were measured 5-10 meters from the road. Meteorological parameters and traffic flow rates were also monitored. The data were analysed in terms of the relationship between monitored pollutants and existing ambient air quality standards. The results indicate that the concentration levels of all pollutants exceeded the ambient air background levels, in certain cases by up to an order of magnitude. While the 24-hr average concentration levels did not exceed the standard, estimates for the annual averages were close to, or even higher than the annual standard levels.