342 resultados para Management model
em Queensland University of Technology - ePrints Archive
Resumo:
With the increasing growth of cultural events both in Australia and internationally, there has also been an increase in event management studies; in theory and in practice. Although a series of related knowledge and skills required specifically by event managers has already been identified by many researchers (Perry et al., 1996; Getz, 2002 & Silvers et al., 2006) and generic event management models proposed, including ‘project management’ strategies in an event context (Getz, 2007), knowledge gaps still exist in relation to identifying specific types of events, especially for not-for-profit arts events. For events of a largely voluntary nature, insufficient resources are recognised as the most challenging; including finance, human resources and infrastructure. Therefore, the concepts and principles which are adopted by large scale commercial events may not be suitable for not-for-profit arts events aiming at providing professional network opportunities for artists. Building partnerships are identified as a key strategy in developing an effective event management model for this type of event. Using the 2008 World Dance Alliance Global Summit (WDAGS) in Brisbane 13-18 July, as a case study, the level, nature and relationship of key partners are investigated. Data is triangulated from interviews with organisers of the 2008 WDAGS, on-line and email surveys of delegates, participant observation and analysis of formal and informal documents, to produce a management model suited to this kind of event.
Resumo:
Ecologically sustainable development has become a major feature of legal systems at the international, national and local levels throughout the world. In Australia, governments have responded to environmental crises by enacting legislation imposing obligations and restrictions over privately-owned land. Whilst these obligations and restrictions may well be necessary to achieve sustainability, the approach to management of information concerning these instruments is problematic. For example, management of information concerning obligations and restrictions in Queensland is fragmented, with some instruments registered or recorded on the land title register, some on external registers, and some information only available in the legislation itself. This approach is used in most Australian jurisdictions. This fragmented approach has led to two separate but interconnected problems. First, the Torrens system is no longer meeting its goal of providing a complete and accurate picture of title. Second, this uncoordinated approach to the management of land titles, and obligations and restrictions on land use, has created a barrier to sustainable management of natural resources. This is because compliance with environmental laws is impaired in the absence of easily accessible and accurate information. These problems demonstrate a clear need for reform in this area. To determine how information concerning these obligations and restrictions may be most effectively managed, this thesis will apply a comparative methodology and consider three case studies, which each utilise different models for management of this information. These jurisdictions will be assessed according to a set of guidelines for comparison to identify which features of their systems provide for effective management of information concerning obligations and restrictions on title and use. Based on this comparison, this thesis will devise a series of recommendations for an effective system for the management of information concerning obligations and restrictions on land title and use, taking into account any potential legal issues and barriers to implementation. This series of recommendations for reform will be supplemented by suggested draft legislative provisions.
Resumo:
The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks simultaneously. However, this model considers those failure risks that occur only over the design and construction phases of a project’s life cycle. While it can be sufficient for some projects for which the required cost during the operating life is much less than the budget required over the construction period, it should be modified in relation to infrastructure projects because the associated costs during the operating life cycle are significant. In this paper, a modified APRAM is proposed, which can consider potential risks that might occur over the entire life cycle of the project, including technical and managerial failure risks. Therefore, the modified model can be used as an efficient decision-support tool for construction managers in the housing industry in which various alternatives might be technically available. The modified method is demonstrated by using a real building project, and this demonstration shows that it can be employed efficiently by construction managers. The Delphi method was applied in order to figure out the failure events and their associated probabilities. The results show that although the initial cost of a cold-formed steel structural system is higher than a conventional construction system, the former’s failure cost is much lower than the latter’s
Resumo:
It is argued that the smart cities model promise solutions to fuel sustainable development and a high quality of life with a wise management of natural resources, through participatory action and engagement. The paper provides a critical review of this model and application attempts of smart urban technologies in contemporary cities by particularly looking into emerging practices of ubiquitous eco-cities as exemplar smart cities initiatives. Through a thorough review of literature and best practices on the smart cities model, this paper attempts to address the research question of whether smart cities model is just another fashionable city brand or an effective urban development and management model to solve the problems of our cities. The findings shed light on urban planning and development considerations for the integration of smart urban technologies and their possible implications in shaping up of the built environment to produce prosperous and sustainable urban futures.
Resumo:
This paper introduces a model to facilitate delegation, including ad-hoc delegation, in cross security domain activities. Specifically, this paper proposes a novel delegation constraint management model to manage and track delegation constraints across security domains. An algorithm to trace the authority of delegation constraints is introduced as well as an algorithm to form a delegation constraint set and detect/prevent potential conflicts. The algorithms and the management model are built upon a set of formal definitions of delegation constraints.
Resumo:
The ineffectiveness of current design processes has been well studied and has resulted in widespread calls for the evolution and development of new management processes. Even following the advent of BIM, we continue to move from one stage to another without necessarily having resolved all the issues. CAD design technology, if well handled, could have significantly raised the level of quality and efficiency of current processes, but in practice this was not fully realized. Therefore, technology alone can´t solve all the problems and the advent of BIM could result in a similar bottleneck. For a precise definition of the problem to be solved we should start by understanding what are the main current bottlenecks that have yet to be overcome by either new technologies or management processes, and the impact of human behaviour-related issues which impact the adoption and utilization of new technologies. The fragmented and dispersed nature of the AEC sector, and the huge number of small organizations that comprise it, are a major limiting factor. Several authors have addressed this issue and more recently IDDS has been defined as the highest level of achievement. However, what is written on IDDS shows an extremely ideal situation on a state to be achieved; it shows a holistic utopian proposition with the intent to create the research agenda to move towards that state. Key to IDDS is the framing of a new management model which should address the problems associated with key aspects: technology, processes, policies and people. One of the primary areas to be further studied is the process of collaborative work and understanding, together with the development of proposals to overcome the many cultural barriers that currently exist and impede the advance of new management methods. The purpose of this paper is to define and delimit problems to be solved so that it is possible to implement a new management model for a collaborative design process.
Resumo:
Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
Sexual harassment can be conceptualized as a series of interactions between harassers and targets that either inhibit or increase outrage by third parties. The outrage management model predicts the kinds of actions likely to be used by perpetrators to minimize outrage, predicts the consequences of failing to use these tactics—namely backfire, and recommends countertactics to increase outrage. Using this framework, our archival study examined outrage-management tactics reported as evidence in 23 judicial decisions of sexual harassment cases in Australia. The decisions contained precise, detailed information about the circumstances leading to the claim; the events which transpired in the courtroom, including direct quotations; and the judges' interpretations and findings. We found evidence that harassers minimize outrage by covering up the actions, devaluing the target, reinterpreting the events, using official channels to give an appearance of justice, and intimidating or bribing people involved. Targets can respond using countertactics of exposure, validation, reframing, mobilization of support, and resistance. Although there are limitations to using judicial decisions as a source of information, our study points to the value of studying tactics and the importance to harassers of minimizing outrage from their actions. The findings also highlight that, given the limitations of statutory and organizational protections in reducing the incidence and severity of sexual harassment in the community, individual responses may be effective as part of a multilevel response in reducing the incidence and impact of workplace sexual harassment as a gendered harm.
Resumo:
Infrastructure organisations are operating in an increasingly challenging business environment as a result of globalisation, privatisation and deregulation. Under such circumstances, asset managers need to manage their infrastructure assets effectively in order to contribute to the overall performance of their organisation. In an external business environment that is constantly changing, extant literature on strategic management advocates a resourced--�]based view (RBV) approach that focuses on factors internal to the organisation such as resources and capabilities to sustain organisation performance. The aim of this study is to explore the core capabilities needed in the management of infrastructure assets. Using a multiple case study research strategy focusing on transport infrastructure, this research firstly examines the goals of infrastructure asset management and their alignment with broader corporate goals of an infrastructure organisation. It then examines the strategic infrastructure asset management processes that are needed to achieve these goals. The core capabilities that can support the strategic infrastructure asset management processes are then identified. This research produced a number of findings. First, it provided empirical evidence that asset management goals are being pursued with the aim of supporting the broader business goals of infrastructure organisations. Second, through synthesising the key asset management processes deemed necessary to achieve the asset management goals, a strategic infrastructure asset management model is proposed. Third, it identified five core capabilities namely stakeholder connectivity, cross-functional, relational, technology absorptive and integrated information management capability as central to executing the strategic infrastructure asset management processes well. These findings culminate in the development of a capability model to improve the performance of infrastructure assets.
Resumo:
The paper addresses the issue of providing access control via delegation and constraint management across multiple security domains. Specifically, this paper proposes a novel Delegation Constraint Management model to manage and enforce delegation constraints across security domains. An algorithm to trace the authority of delegation constraints is introduced as well as an algorithm to form a delegation constraint set and detect/prevent potential conflicts. The algorithms and the management model are built upon a set of formal definitions of delegation constraints. In addition, a constraint profile based on XACML is proposed as a means to express the delegation constraint. The paper also includes a protocol to exchange delegation constraints (in the form of user commitments) between the involved entities in the delegation process.
Resumo:
The effect of resource management on the building design process directly influences the development cycle time and success of construction projects. This paper presents the information constraint net (ICN) to represent the complex information constraint relations among design activities involved in the building design process. An algorithm is developed to transform the information constraints throughout the ICN into a Petri net model. A resource management model is developed using the ICN to simulate and optimize resource allocation in the design process. An example is provided to justify the proposed model through a simulation analysis of the CPN Tools platform in the detailed structural design. The result demonstrates that the proposed approach can obtain the resource management and optimization needed for shortening the development cycle and optimal allocation of resources.
Resumo:
Although integrated marketing communication (IMC) has progressed towards midrange maturity level, its full-scale adoption has been impeded by a lack of consensus on its defining constructs. The purpose of this study is to move from abstraction to define the construct of strategic integration (SI) and develop this into a management tool, thus making an important contribution to both the theory and practice of IMC. Drawing from both IMC and strategic management literature, the construct of SI is operationalised into a number of key factors and a well-cited management model, Fuchs’ ‘integration valuator’ is explored as the starting point of a measurement tool for IMC. To do this, a Delphi study invites the scrutiny of an expert panel of world-leading IMC researchers and practitioners. The panel validated the model construction process,redefined overarching constructs and key factors with a high degree of consensus, supported a process measure, suggested a weighted evaluation measure and recognised the importance of developing such a measure. They delivered clear and consistent imperatives guiding model development. The result is a measure of SI that evaluates organisational proficiency and diagnoses the integration of IMC campaigns. It also advances theory by providing a better understanding of the construct of SI.
Resumo:
While the economic and environmental benefits of fisheries management are well accepted, the costs of effective management in low value fisheries, including the research necessary to underpin such management, may be considerable relative to the total economic benefits they may generate. Co-management is often seen as a panacea in low value fisheries. Increasing fisher participation increases legitimacy of management decision in the absence of detailed scientific input. However, where only a small number of operators exist, the potential benefits of co-management are negated by the high transaction cost to the individual fishers engaging in the management process. From an economic perspective, sole ownership has been identified as the management structure which can best achieve biological and economic sustainability. Moving low value fisheries with a small number of participants to a corporate-cooperative management model may come close to achieving these sole ownership benefits, with lower transaction costs. In this paper we look at the applicability of different management models with industry involvement to low value fisheries with a small number of participants. We provide an illustration as to how a fishery could be transitioned to a corporate-cooperative management model that captures the key benefits of sole management at a low cost and is consistent with societal objectives.