355 resultados para Large modeling projects

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research aims to explore and identify political risks on a large infrastructure project in an exaggerated environment to ascertain whether sufficient objective information can be gathered by project managers to utilise risk modelling techniques. During the study, the author proposes a new definition of political risk; performs a detailed project study of the Neelum Jhelum Hydroelectric Project in Pakistan; implements a probabilistic model using the principle of decomposition and Bayes probabilistic theorem and answers the question: was it possible for project managers to obtain all the relevant objective data to implement a probabilistic model?

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Organizational and technological systems analysis and design practices such as process modeling have received much attention in recent years. However, while knowledge about related artifacts such as models, tools, or grammars has substantially matured, little is known about the actual tasks and interaction activities that are conducted as part of analysis and design acts. In particular, key role of the facilitator has not been researched extensively to date. In this paper, we propose a new conceptual framework that can be used to examine facilitation behaviors in process modeling projects. The framework distinguishes four behavioral styles in facilitation (the driving engineer, the driving artist, the catalyzing engineer, and the catalyzing artist) that a facilitator can adopt. To distinguish between the four styles, we provide a set of ten behavioral anchors that underpin facilitation behaviors. We also report on a preliminary empirical exploration of our framework through interviews with experienced analysts in six modeling cases. Our research provides a conceptual foundation for an emerging theory for describing and explaining different behaviors associated with process modeling facilitation, provides first preliminary empirical results about facilitation in modeling projects, and provides a fertile basis for examining facilitation in other conceptual modeling activities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As process management projects have increased in size due to globalised and company-wide initiatives, a corresponding growth in the size of process modeling projects can be observed. Despite advances in languages, tools and methodologies, several aspects of these projects have been largely ignored by the academic community. This paper makes a first contribution to a potential research agenda in this field by defining the characteristics of large-scale process modeling projects and proposing a framework of related issues. These issues are derived from a semi -structured interview and six focus groups conducted in Australia, Germany and the USA with enterprise and modeling software vendors and customers. The focus groups confirm the existence of unresolved problems in business process modeling projects. The outcomes provide a research agenda which directs researchers into further studies in global process management, process model decomposition and the overall governance of process modeling projects. It is expected that this research agenda will provide guidance to researchers and practitioners by focusing on areas of high theoretical and practical relevance.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper draws on a study of government initiat ives aimed at facilitating economic development, specifically the Multifunction Polis Feasibility Study involving the governments and business enterprises of Australia and Japan (1987-1991). Large scale projects that involve collaboration between gove rnment and business (termed: large scale collaborative venture LSCV)are identified as one aspect of competing in the new economy . The study pursued the research propos ition that a LSCV can be effectively facilitated by following a theory based process similar to those in corporate practice. An approach to managing such ventures is outlined, based on strategic marketing theory that may enhance their success and thereby help countries part icipate more successfully in global competition through such ventures.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper relates to government initiatives which aim at advancing their country’s economic development and investor attractiveness. It identifies large scale projects that involve collaboration between government and business (termed: large scale collaborative venture – LSCV) as one aspect of competing in the new economy. The study pursued the research proposition that a LSCV can be effectively facilitated by following a theory based process similar to what is used in corporate practice. An approach to managing such ventures is outlined, based on strategic marketing theory applied to a major project, the Multifunction Polis. It is proposed that such an approach may enhance the success of a collaborative venture and thereby help countries participate more successfully in global competition through such ventures.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Process models provide visual support for analyzing and improving complex organizational processes. In this paper, we discuss differences of process modeling languages using cognitive effectiveness considerations, to make statements about the ease of use and quality of user experience. Aspects of cognitive effectiveness are of importance for learning a modeling language, creating models, and understanding models. We identify the criteria representational clarity, perceptual discriminability, perceptual immediacy, visual expressiveness, and graphic parsimony to compare and assess the cognitive effectiveness of different modeling languages. We apply these criteria in an analysis of the routing elements of UML Activity Diagrams, YAWL, BPMN, and EPCs, to uncover their relative strengths and weaknesses from a quality of user experience perspective. We draw conclusions that are relevant to the usability of these languages in business process modeling projects.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose : The Hong Kong Special Administrative Region (referred to as Hong Kong from here onwards) is an international leading commercial hub particularly in Asia. In order to keep up its reputation a number of large public works projects have been considered. Public Private Partnership (PPP) has increasingly been suggested for these projects, but the suitability of using this procurement method in Hong Kong is yet to be studied empirically. The findings presented in this paper will specifically consider whether PPPs should be used to procure public works projects in Hong Kong by studying the attractive and negative factors for adopting PPP. Design/methodology/approach : As part of this study a questionnaire survey was conducted with industrial practitioners. The respondents were requested to rank the importance of fifteen attractive factors and thirteen negative factors for adopting PPP. Findings : The results found that in general the top attractive factors ranked by respondents from Hong Kong were efficiency related, these included (1) ‘Provide an integrated solution (for public infrastructure / services)’; (2) ‘Facilitate creative and innovative approaches’; and (3) ‘Solve the problem of public sector budget restraint’. It was found that Australian respondents also shared similar findings to those in Hong Kong, but the United Kingdom respondents showed a higher priority to those economic driven attractive factors. Also, the ranking of the attractive and negative factors for adopting PPP showed that on average the attractive factors were scored higher than the negative factors. Originality/value : The results of this research have enabled a comparison of the attractive and negative factors for adopting PPP between three administrative systems. These findings have confirmed that PPP is a suitable means to procure large public projects which are believed to be useful and interesting to PPP researchers and practitioners.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Large infrastructure projects are a major responsibility of urban and regional governments, who usually lack expertise to fully specify the demanded projects. Contractors, typically experts on such projects due to experience with similar projects elsewhere, advise of the needed design in their bids. Producing the right design is nevertheless costly. We model such infrastructure projects taking into account their credence goods feature and the costly design effort they require and examine the performance of commonly used contracting methods. We show that when building costs are homogeneous and public information, multi-stage competitive bidding involving shortlisting of two contractors and contingent compensation of both contractors on design efforts outperforms sequential search and the traditional Design-and-Build approach. If building costs are private information of the contractors and are revealed to them after design cost is sunk, sequential search may be superior to the other two methods.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The growing public concern about the complexity, cost and uncertain efficacy of the statuary environmental impact assessment process applying to large-scale projects in Queensland is reviewed. This is based on field data gathered over the past six years sat large-scale marina developments that access major environmental reserves along the coast. An ecological design proposal to broaden the process consisted with both government aspirations and regional ecological parameters - termed Regional Landscape Strategies - would allow the existing Environmental Impact Asessment to be modified alone potentially more practicable and effective lines.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Large infrastructure projects are a major responsibility of urban and regional governments, who usually lack expertise to fully specify the demanded projects. Contractors, typically experts on such projects due to experience with similar projects,advise of the needed design as well as the cost of construction in their bids. Producing the right design is costly. We model such infrastructure projects taking into account their credence goods feature and the costly design effort they require and examine the performance of commonly used contracting methods. We show that when building costs are homogeneous and public information, simultaneous bidding involving shortlisting of two contractors and contingent compensation of both contractors on design efforts outperforms sequential search. If building costs are private information of the contractors and are revealed to them after design cost is sunk,sequential search may be superior to simultaneous bidding.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Large design projects, such as those in the AEC domain, involve collaboration among a number of design disciplines, often in separate locations. With the increase in CAD usage in design offices, there has been an increase in the interest in collaboration using the electronic medium, both synchronously and asynchronously. The use of a single shared database representing a single model of a building has been widely put forward but this paper argues that this does not take into account the different representations required by each discipline. This paper puts forward an environment which provides real-time multi-user collaboration in a 3D virtual world for designers in different locations. Agent technology is used to manage the different views, creation and modifications of objects in the 3D virtual world and the necessary relationships with the database(s) belonging to each discipline.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

President’s Message Hello fellow AITPM members, Due to three colliding forces of nature I find myself writing this month’s message from home – today, I am still getting over a persistent virus that seemed to set in just after returning from Singapore a couple of weeks ago, which my diabetes won’t let me get away with too easily (no Kermit the Frog swine flu jokes please). Combine this with a very wet day in Brisbane – in fact the wettest for 20 years (how can we complain, except for flash flooding?). And in Queensland today is a state school teachers’ strike, so one half of our brood is over watching TV. Family snapshots aside, the biggest news for our industry of late is the $8.5 billion announced in the Federal Budget for transport infrastructure projects; many “shovel ready”, but some – and fortunate for our profession – desktop ready. This newsletter provides nationwide coverage on the transport infrastructure aspects of the Federal Budget. We’ll need a bit more time to carefully look at the ensuing State Budgets’ announcements. Regarding the federal budget announcements, I am pleased to see serious attention being paid to upgrading the M1 system – I hope to see a motorway standard facility connecting Adelaide to at least Rockhampton in my lifetime. But some other important roads are of course missing out in this particular budget. Various levels of commitment are being made to urban passenger rail – some project significant while others planning significant. Enhancement of suburban rail is important across the capitals and Australia’s medium sized cities such as the Gold Coast and Newcastle. Not much on road safety initiatives jumped out at me, but I believe it is implied in the large road projects and in some of the detail elsewhere. I do believe it’s about time a ‘Vision Zero’ style policy is adopted at the National level, since any death is unacceptable on the road, just as it is in any other workplace. So, overall some good news on building transport infrastructure to keep the economy purring during this recession, and strongly supporting it during future boom times. The other edge to the sword, of course, is that we tax payers will be paying a considerable amount for borrowings for these projects over a long period of time. I close again in reminding everyone again that AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, is being held in Adelaide from 5 to 7 August. www.aitpm.com has all of the details about how to register, sponsor a booth, session, etc. Best regards all, Jon Bunker

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The realities of new technological and social conditions since the 1990s demand a new approach to literacy teaching. Looking onward from the original statement of aims of the multiliteracies movement in 1996, this volume brings together top-quality scholarship and research that has embraced the notion and features new contributions by many of the originators of this approach to literacy. Drawing on large research projects and empirical evidence, the authors explore practical and educational issues that relate to multiliteracies, such as assessment, pedagogy and curriculum. The viewpoint taken is that multiliteracies is a complementary socio-cultural approach to the new literacies that includes pedagogy and learning. The differences are addressed from a multiliteracies perspective – one that does not discount or undermine the new literacies, but shows new ways in which they are complementary. Computers and the Internet are transforming the way we work and communicate and the very notion of literacy itself. This volume offers frontline information and a vital update for those wishing to understand the evolution of multiliteracies and the current state of literacy theory in relation to it.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Public awareness of large infrastructure projects, many of which are delivered through networked arrangements is high for several reasons. These projects often involve significant public investment; they may involve multiple and conflicting stakeholders and can potentially have significant environmental impacts (Lim and Yang, 2008). To produce positive outcomes from infrastructure delivery it is imperative that stakeholder “buy in” be obtained particularly about decisions relating to the scale and location of infrastructure. Given the likelihood that stakeholders will have different levels of interest and investment in project outcomes, failure to manage this dynamic could potentially jeopardise project delivery by delaying or halting the construction of essential infrastructure. Consequently, stakeholder engagement has come to constitute a critical activity in infrastructure development delivered through networks. This paper draws on stakeholder theory and governance network theory and provides insights into how three multi-level networks within the Roads Alliance in Queensland engage with stakeholders in the delivery of road infrastructure. New knowledge about stakeholders has been obtained by testing a model of Stakeholder Salience and Engagement which combines and extends the stakeholder identification and salience theory and the ladder of stakeholder management and engagement. By applying this model, the broad research question: “How do governance networks engage with stakeholders?” has been addressed. A multiple embedded case study design was selected as the overall approach to explore, describe, explain and evaluate how stakeholder engagement occurred in three governance networks delivering road infrastructure in Queensland. The outcomes of this research contribute to and extend stakeholder theory by showing how stakeholder salience impacts on decisions about the types of engagement processes implemented. Governance network theory is extended by showing how governance networks interact with stakeholders. From a practical perspective this research provides governance networks with an indication of how to more effectively undertake engagement with different types of stakeholders.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Design-Build (DB) system has been widely adopted overseas but it has not received the same popularity yet in the People’s Republic of China. The selection of design-build variant is regarded as one of the critical obstacles to the application of this alternative. This paper investigates categories of design-build variants in the construction market of China. The develop-and-construction, enhanced design-build, traditional-design-build and engineering procurement-construction (EPC) are the four current designbuild variants adopted by clients. Each of them is developed to meet a varying set of circumstances and has its own advantages and disadvantages. The develop-and-construction is mostly used in large, complex projects in housing industry and it will guarantee client’s great control over the project while still leave some design room for the contractor. The traditional-design-build and enhanced-design-build systems are mostly applied in projects that are comparatively simple, small-scale, and the DB contractors will have greater control of the projects. The EPC is the extension of pure design-build method and is widely adopted in the petrochemical, metallurgical and electronic fields because of the high-technique requirements and the necessity for one entity to control the design, construction, procurement and commissioning etc. Four corresponding design-build projects are also presented in this paper in order to better illustrate the operational process and provide the insight for understanding the design-build variants in Mainland China.