914 resultados para Inventory systems

em Queensland University of Technology - ePrints Archive


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The decentralisation reform in Indonesia has mandated the Central Government to transfer some functions and responsibilities to local governments including the transfer of human resources, assets and budgets. Local governments became giant asset holders almost overnight and most were ill prepared to handle these transformations. Assets were transferred without analysing local government need, ability or capability to manage the assets and no local government was provided with an asset management framework. Therefore, the aim of this research is to develop a Public Asset Management Framework for provincial governments in Indonesia, especially for infrastructure and real property assets. This framework will enable provincial governments to develop integrated asset management procedures throughout asset‘s lifecycle. Achieving the research aim means answering the following three research questions; 1) How do provincial governments in Indonesia currently manage their public assets? 2) What factors influence the provincial governments in managing these public assets? 3) How is a Public Asset Management Framework developed that is specific for the Indonesian provincial governments‘ situation? This research applied case studies approach after a literature review; document retrieval, interviews and observations were collated. Data was collected in June 2009 (preliminary data collection) and January to July 2010 in the major eastern Indonesian provinces. Once the public asset management framework was developed, a focus group was used to verify the framework. Results are threefold and indicate that Indonesian provincial governments need to improve the effectiveness and efficiency of current practice of public asset management in order to improve public service quality. The second result shows that the 5 major concerns that influence the local government public asset management processes are asset identification and inventory systems, public asset holding, asset guidance and legal arrangements, asset management efficiency and effectiveness, and, human resources and their organisational arrangements. The framework was then applied to assets already transferred to local governments and so included a system of asset identification and a needs analysis to classify the importance of these assets to local governments, their functions and responsibilities in delivering public services. Assets that support local government functions and responsibilities will then be managed using suitable asset lifecycle processes. Those categorised as surplus assets should be disposed. Additionally functions and responsibilities that do not need an asset solution should be performed directly by local governments. These processes must be measured using performance measurement indicators. All these stages should be guided and regulated with sufficient laws and regulations. Constant improvements to the quality and quantity of human resources hold an important role in successful public asset management processes. This research focuses on developing countries, and contributes toward the knowledge of a Public Asset Management Framework at local government level, particularly Indonesia. The framework provides local governments a foundation to improve their effectiveness and efficiency in managing public assets, which could lead to improved public service quality. This framework will ensure that the best decisions are made throughout asset decision ownership and provide a better asset life cycle process, leading to selection of the most appropriate asset, improve its acquisition and delivery process, optimise asset performance, and provide an appropriate disposal program.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Australia has no nationally accepted building products life cycle inventory (LCI) database for use in building Ecologically Sustainable Development (ESD) assessment (BEA) tools. More information about the sustainability of the supply chain is limited by industry’s lack of real capacity to deliver objective information on process and product environmental impact. Recognition of these deficits emerged during compilation of a National LCI database to inform LCADesign, a prototype 3 dimensional object oriented computer aided design (3-D CAD) commercial building design tool. Development of this Australian LCI represents 24 staff years of effort here since 1995. Further development of LCADesign extensions is proposed as being essential to support key applications demanded from a more holistic theoretical framework calling for modules of new building and construction industry tools. A proposed tool, conceptually called LCADetails, is to serve the building product industries own needs as well as that of commercial building design amongst other industries’ prospective needs. In this paper, a proposition is examined that the existing national LCI database should be further expanded to serve Australian building product industries’ needs as well as to provide details for its client-base from a web based portal containing a module of practical supply and procurement applications. Along with improved supply chain assessment services, this proposed portal is envisaged to facilitate industry environmental life cycle improvement assessment and support decision-making to provide accredited data for operational reporting capabilities, load-based reasoning as well as BEA applications. This paper provides an overview of developments to date, including a novel 3-D CAD information and communications technology (ICT) platform for more holistic integration of existing tools for true cost assessment. Further conceptualisation of future prospects, based on a new holistic life cycle assessment framework LCADevelop, considering stakeholder relationships and their need for a range of complementary tools leveraging automated function off such ICT platforms to inform dimensionally defined operations for such as automotive, civil, transport and industrial applications are also explored.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper discusses challenges to developers of a national Life Cycle Inventory (LCI) database on which to base assessment of building environmental impacts and a key to development of a fully integrated eco-design tool created for automated eco-efficiency assessment of commercial building design direct from 3D CAD. The scope of this database includes Australian and overseas processing burdens involved in acquiring, processing, transporting, fabricating, finishing and using metals, masonry, timber, glazing, ceramics, plastics, fittings, composites and coatings. Burdens are classified, calculated and reported for all flows of raw materials, fuels, energy and emissions to and from the air, soil and water associated with typical products and services in building construction, fitout and operation. The aggregated life cycle inventory data provides the capacity to generate environmental impact assessment reports based on accepted performance indicators. Practitioners can identify hot spots showing high environmental burdens of a proposed design and drill down to report on specific building components. They can compare assessments with case studies and operational estimates to assist in eco-efficient design of a building, fitout and operation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The serviceability and safety of bridges are crucial to people’s daily lives and to the national economy. Every effort should be taken to make sure that bridges function safely and properly as any damage or fault during the service life can lead to transport paralysis, catastrophic loss of property or even casualties. Nonetheless, aggressive environmental conditions, ever-increasing and changing traffic loads and aging can all contribute to bridge deterioration. With often constrained budget, it is of significance to identify bridges and bridge elements that should be given higher priority for maintenance, rehabilitation or replacement, and to select optimal strategy. Bridge health prediction is an essential underpinning science to bridge maintenance optimization, since the effectiveness of optimal maintenance decision is largely dependent on the forecasting accuracy of bridge health performance. The current approaches for bridge health prediction can be categorised into two groups: condition ratings based and structural reliability based. A comprehensive literature review has revealed the following limitations of the current modelling approaches: (1) it is not evident in literature to date that any integrated approaches exist for modelling both serviceability and safety aspects so that both performance criteria can be evaluated coherently; (2) complex system modelling approaches have not been successfully applied to bridge deterioration modelling though a bridge is a complex system composed of many inter-related bridge elements; (3) multiple bridge deterioration factors, such as deterioration dependencies among different bridge elements, observed information, maintenance actions and environmental effects have not been considered jointly; (4) the existing approaches are lacking in Bayesian updating ability to incorporate a variety of event information; (5) the assumption of series and/or parallel relationship for bridge level reliability is always held in all structural reliability estimation of bridge systems. To address the deficiencies listed above, this research proposes three novel models based on the Dynamic Object Oriented Bayesian Networks (DOOBNs) approach. Model I aims to address bridge deterioration in serviceability using condition ratings as the health index. The bridge deterioration is represented in a hierarchical relationship, in accordance with the physical structure, so that the contribution of each bridge element to bridge deterioration can be tracked. A discrete-time Markov process is employed to model deterioration of bridge elements over time. In Model II, bridge deterioration in terms of safety is addressed. The structural reliability of bridge systems is estimated from bridge elements to the entire bridge. By means of conditional probability tables (CPTs), not only series-parallel relationship but also complex probabilistic relationship in bridge systems can be effectively modelled. The structural reliability of each bridge element is evaluated from its limit state functions, considering the probability distributions of resistance and applied load. Both Models I and II are designed in three steps: modelling consideration, DOOBN development and parameters estimation. Model III integrates Models I and II to address bridge health performance in both serviceability and safety aspects jointly. The modelling of bridge ratings is modified so that every basic modelling unit denotes one physical bridge element. According to the specific materials used, the integration of condition ratings and structural reliability is implemented through critical failure modes. Three case studies have been conducted to validate the proposed models, respectively. Carefully selected data and knowledge from bridge experts, the National Bridge Inventory (NBI) and existing literature were utilised for model validation. In addition, event information was generated using simulation to demonstrate the Bayesian updating ability of the proposed models. The prediction results of condition ratings and structural reliability were presented and interpreted for basic bridge elements and the whole bridge system. The results obtained from Model II were compared with the ones obtained from traditional structural reliability methods. Overall, the prediction results demonstrate the feasibility of the proposed modelling approach for bridge health prediction and underpin the assertion that the three models can be used separately or integrated and are more effective than the current bridge deterioration modelling approaches. The primary contribution of this work is to enhance the knowledge in the field of bridge health prediction, where more comprehensive health performance in both serviceability and safety aspects are addressed jointly. The proposed models, characterised by probabilistic representation of bridge deterioration in hierarchical ways, demonstrated the effectiveness and pledge of DOOBNs approach to bridge health management. Additionally, the proposed models have significant potential for bridge maintenance optimization. Working together with advanced monitoring and inspection techniques, and a comprehensive bridge inventory, the proposed models can be used by bridge practitioners to achieve increased serviceability and safety as well as maintenance cost effectiveness.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A multicausal model of adolescent homelessness is proposed, based upon the notion that homeless youth suffer from emotional, social, and cultural deprivation. The model was tested in a sample of homeless adolescents (n = 54) and a similar, but not homeless, control group (n = 58). Emotional deprivation was assessed on the Parental Bonding Inventory (Parker, Tupling,&Brown, 1979), whereas social and cultural deprivation were assessed on the Family Environment Scale (Moos&Moos, 1981). The homeless adolescents were found to be significantly more deprived emotionally, socially, and culturally than the controls. The results indicate support for a deprivation model of adolescent homelessness with implications for public policy and intervention planning.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With a focus to optimising the life cycle performance of Australian Railway bridges, new bridge classification and environmental classification systems are proposed. The new bridge classification system is mainly to facilitate the implementation of novel Bridge Management System (BMS) which optimise the life cycle cost both at project level and network level while environment classification is mainly to improve accuracy of Remaining Service Potential (RSP) module of the proposed BMS. In fact, limited capacity of the existing BMS to trigger the maintenance intervention point is an indirect result of inadequacies of the existing bridge and environmental classification systems. The proposed bridge classification system permits to identify the intervention points based on percentage deterioration of individual elements and maintenance cost, while allowing performance based rating technique to implement for maintenance optimisation and prioritisation. Simultaneously, the proposed environment classification system will enhance the accuracy of prediction of deterioration of steel components.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A planar polynomial differential system has a finite number of limit cycles. However, finding the upper bound of the number of limit cycles is an open problem for the general nonlinear dynamical systems. In this paper, we investigated a class of Liénard systems of the form x'=y, y'=f(x)+y g(x) with deg f=5 and deg g=4. We proved that the related elliptic integrals of the Liénard systems have at most three zeros including multiple zeros, which implies that the number of limit cycles bifurcated from the periodic orbits of the unperturbed system is less than or equal to 3.