352 resultados para Infrastructure and Construction Projects

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report examines the involvement of manufacturers in value-adding through service-enhancement of product offerings. This focus has been prompted by:  emphasis in the knowledge-economy literature on the increasing role played by services in economic growth; and  recent analysis which suggests that the most dynamic sector of many economies is an integrated manufacturing-services sector (see Part One of this report). The report initially describes the emergence of an integrated manufacturing-services sector in the context of increasingly knowledge-based economic systems. Part Two reports on the results of a survey of manufacturers in the building and construction product system, investigating their involvement in service provision. Parts Three and Four present two case studies of exemplary manufacturers involved in adding value to their manufacturing operations through services offered on building and construction projects. The report examines manufacturers of materials, products, equipment and machinery used on building and construction projects. The two case study sections of the report, in part, focus on a major project undertaken by each of the manufacturers. This project element of activity is focussed on (as opposed to wholesale or retail supply), because this area of activity involves a broader array of service-enhancement mechanisms and more complex bundling of products and services.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public engagement is an essential process for major municipal infrastructure and construction projects as it serves to identify the interests and concerns of citizens before the planning and design are finalised and thus ensures the schemes are beneficial to all sectors of the community. However, the success of public engagement depends on a number of factors, not least the suitability of the engagement methods used, representativeness and activeness of participants, time pressure, financial constraint and so on. In Hong Kong, the community has experienced discontent with several major projects recently, suggesting the need to examine the effectiveness of its current public engagement mechanism. This paper reports the results of a series of interviews with a variety of stakeholders – indicating the need for a carefully considered public engagement plan to be established at the beginning to drive the process and more experienced people to lead and facilitate the engagement process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Highway construction often requires a significant capital input; therefore it often causes serious financial implications for developers, owners and operators. The recent industry-wide focus on sustainability has added a new dimension to the evaluation of highway projects, particularly on the economical scale of ‘going green’. Comprehensive analysis of the whole-of-life highway development that responds to sustainability challenges is one of the primary concerns for stakeholders. Principles of engineering economics and life cycle costing have been used to determine the incremental capacity investments for highway projects. However, the consideration of costs and issues associated with sustainability is still very limited in current studies on highway projects. Previous studies have identified that highway project investments are primarily concerned with direct market costs that can be quantified through life cycle costing analysis (LCCA). But they tend to ignore costs that are difficult to calculate, as those related to environmental and social elements. On a more positive note, these studies proved that the inclusion of such costs is an essential part of the overall development investment and a primary concern for decision making by the stakeholders. This paper discusses a research attempt to identify and categorise sustainability cost elements for highway projects. Through questionnaire survey, a set of sustainability cost elements on highway projects has been proposed. These cost elements are incorporated into the extension of some of the existing Life Cycle Costing Analysis (LCCA) models in order to produce a holistic financial picture of the highway project. It is expected that a new LCCA model will be established to serve as a suitable tool for decision making for highway project stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction procurement organisations in the Australian framework provide broad guidelines on project management in setting benchmark performance measurements and processes for evaluating their projects. Despite this, little has been known in the project management practise in transport construction projects in Australia, in particular Queensland. Questionnaire data from 53 project management practitioners employed in State and City public sector organisations in Queensland,suggested that many practitioners in the public sector have little or a lack of understanding of government regulatory policies, which are used as economic evaluation tools for project options. Public sector project managers perceive socio-economic evaluation tools as inappropriate for public sector projects. The survey results also found conducting risk management analysis, developing a risk register and mitigation of risks were most effective way of managing risk. This study provides an opportunity for the public sector to review and provide training on project management practices and government regulatory policies governing public projects. This will improve project management practitioners’ understanding and interpretation of government regulatory policies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Value Management (VM) has been proven to provide a structured framework, together with other supporting tools and techniques, that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. One of the major success factors of VM in achieving better project objectives for clients is through the provision of beneficial input by multi-disciplinary team members being involved in critical decision-making discussions during the early stage of construction projects. This paper describes a doctoral research proposal based on the application of VM in design and build construction projects, especially focusing on the design stage. The research aims to study the effects of implementing VM in design and build construction projects, in particular how well the methodology addresses issues related to cost overruns resulting from poor coordination and overlooking of critical constructability issues amongst team members in construction projects in Malaysia. It is proposed that through contractors’ early involvement during the design stage, combined with the use of the VM methodology, particularly as a decision-making tool, better optimization of construction cost can be achieved, thus promoting more efficient and effective constructability. The main methods used in this research involve a thorough literature study, semi-structured interviews, and a survey of major stakeholders, a detailed case study and a VM workshop and focus group discussions involving construction professionals in order to explore and possibly develop a framework and a specific methodology for the facilitating successful application of VM within design and build construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Effective use of information and communication technologies (ICT) is necessary for delivering efficiency and improved project delivery in the construction industry. Convincing clients or contracting organisations to embrace ICT is a difficult task, there are few templates of an ICT business model for the industry to use. ICT application in the construction industry is relatively low compared to automotive and aerospace industries. The National Museum of Australia project provides a unique opportunity for investigating and reporting on this deficiency in publicly available knowledge. Concentrates on the business model content and objectives, briefly indicates the evaluation framework that was used to evaluate ICT effectiveness.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper we construct earthwork allocation plans for a linear infrastructure road project. Fuel consumption metrics and an innovative block partitioning and modelling approach are applied to reduce costs. 2D and 3D variants of the problem were compared to see what effect, if any, occurs on solution quality. 3D variants were also considered to see what additional complexities and difficulties occur. The numerical investigation shows a significant improvement and a reduction in fuel consumption as theorised. The proposed solutions differ considerably from plans that were constructed for a distance based metric as commonly used in other approaches. Under certain conditions, 3D problem instances can be solved optimally as 2D problems.