214 resultados para Illinois Farm Development Authority.

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The U2 Tower competition entry involved the architectural design for a landmark office tower with associated head office for the world acclaimed rock band U2. The selected site for the office tower was located on the banks of the river Liffey, Dublin. The tower design was intended as a signifier or gateway to the docklands and the city itself. The proposed design incorporated a podium level for music retail and a media centre, a concourse level including cafeteria and outdoor areas as well as a commercial tower.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

What role can climatically appropriate subdivision design play in decreasing the use of energy required to cool premises by maximising access to natural ventilation? How can this design be achieved? The subdivision design stage is critical to urban and suburban sustainability outcomes, as significant changes after development are constrained by the configuration of the subdivision, and then by the construction of the dwellings. Existing Australian lot rating methodologies for energy efficiency, such as that by the Sustainable Energy Development Authority (SEDA), focus on reducing heating needs by increasing solar access, a key need in Australia’s temperate zone. A recent CRC CI project, Sustainable Subdivisions: Energy (Miller and Ambrose 2005) examined these guidelines to see if they could be adapted for use in subtropical South East Queensland (SEQ). Correlating the lot ratings with dwelling ratings, the project found that the SEDA guidelines would need to be modified for use to make allowance for natural ventilation. In SEQ, solar access for heating is less important than access to natural ventilation, and there is a need to reduce energy used to cool dwellings. In Queensland, the incidence of residential air-conditioning was predicted to reach 50 per cent by the end of 2005 (Mickel 2004). The CRC-CI, Sustainable Subdivisions: Ventilation Project (CRC-CI, in progress), aims to verify and quantify the role natural ventilation has in cooling residences in subtropical climates and develop a lot rating methodology for SEQ. This paper reviews results from an industry workshop that explored the current attitudes and methodologies used by a range of professionals involved in subdivision design and development in SEQ. Analysis of the workshop reveals that a key challenge for sustainability is that land development in subtropical SEQ is commonly a separate process from house design and siting. Finally, the paper highlights some of the issues that regulators and industry face in adopting a lot rating methodology for subdivisions offering improved ventilation access, including continuing disagreement between professionals over the desirability of rating tools.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In 2009, the Capital Markets Development Authority (CMDA) - Fiji’s capital market regulator - introduced the Code of Corporate Governance (the Code). The Code is ‘principle-based’ and requires companies listed on the South Pacific Stock Exchange (SPSE) and the financial intermediaries to disclose their compliance with the Code’s principles. While compliance with the Code is mandatory, the nature and extent of disclosure is at the discretion of the complying entities. Agency theory and signalling theory suggest that firms with higher expected levels of agency costs will provide greater levels of voluntary disclosures as signals of strong corporate governance. Thus, the study seeks to test these theories by examining the heterogeneity of corporate governance disclosures by firms listed on SPSE, and determining the characteristics of firms that provide similar levels of disclosures. We conducted a content analysis of corporate governance disclosures on the annual reports of firms from 2008-2012. The study finds that large, non-family owned firms with high levels of shareholder dispersion provide greater quantity and higher quality corporate governance disclosures. For firms that are relatively smaller, family owned and have low levels of shareholder dispersion, the quantity and quality of corporate governance disclosures are much lower. Some of these firms provide boilerplate disclosures with minimal changes in the following years. These findings support the propositions of agency and signalling theory, which suggest that firms with higher separation between agents and principals will provide more voluntary disclosures to reduce expected agency costs transfers. Semi-structured interviews conducted with key stakeholders further reinforce the findings. The interviews also reveal that complying entities positively perceive the introduction of the Code. Furthermore, while compliance with Code brought about additional costs, they believed that most of these costs were minimal and one-off, and the benefits of greater corporate disclosure to improve user decision making outweighed the costs. The study contributes to the literature as it provides insight into the experience of a small capital market with introducing a ‘principle-based’ Code that attempts to encourage corporate governance practices through enhanced disclosure. The study also assists policy makers better understand complying entities’ motivations for compliance and the extent of compliance.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A review of the literature related to issues involved in irrigation induced agricultural development (IIAD) reveals that: (1) the magnitude, sensitivity and distribution of social welfare of IIAD is not fully analysed; (2) the impacts of excessive pesticide use on farmers’ health are not adequately explained; (3) no analysis estimates the relationship between farm level efficiency and overuse of agro-chemical inputs under imperfect markets; and (4) the method of incorporating groundwater extraction costs is misleading. This PhD thesis investigates these issues by using primary data, along with secondary data from Sri Lanka. The overall findings of the thesis can be summarised as follows. First, the thesis demonstrates that Sri Lanka has gained a positive welfare change as a result of introducing new irrigation technology. The change in the consumer surplus is Rs.48,236 million, while the change in the producer surplus is Rs. 14,274 millions between 1970 and 2006. The results also show that the long run benefits and costs of IIAD depend critically on the magnitude of the expansion of the irrigated area, as well as the competition faced by traditional farmers (agricultural crowding out effects). The traditional sector’s ability to compete with the modern sector depends on productivity improvements, reducing production costs and future structural changes (spillover effects). Second, the thesis findings on pesticides used for agriculture show that, on average, a farmer incurs a cost of approximately Rs. 590 to 800 per month during a typical cultivation period due to exposure to pesticides. It is shown that the value of average loss in earnings per farmer for the ‘hospitalised’ sample is Rs. 475 per month, while it is approximately Rs. 345 per month for the ‘general’ farmers group during a typical cultivation season. However, the average willingness to pay (WTP) to avoid exposure to pesticides is approximately Rs. 950 and Rs. 620 for ‘hospitalised’ and ‘general’ farmers’ samples respectively. The estimated percentage contribution for WTP due to health costs, lost earnings, mitigating expenditure, and disutility are 29, 50, 5 and 16 per cent respectively for hospitalised farmers, while they are 32, 55, 8 and 5 per cent respectively for ‘general’ farmers. It is also shown that given market imperfections for most agricultural inputs, farmers are overusing pesticides with the expectation of higher future returns. This has led to an increase in inefficiency in farming practices which is not understood by the farmers. Third, it is found that various groundwater depletion studies in the economics literature have provided misleading optimal water extraction quantity levels. This is due to a failure to incorporate all production costs in the relevant models. It is only by incorporating quality changes to quantity deterioration, that it is possible to derive socially optimal levels. Empirical results clearly show that the benefits per hectare per month considering both the avoidance costs of deepening agro-wells by five feet from the existing average, as well as the avoidance costs of maintaining the water salinity level at 1.8 (mmhos/Cm), is approximately Rs. 4,350 for farmers in the Anuradhapura district and Rs. 5,600 for farmers in the Matale district.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Experience plays an important role in building management. “How often will this asset need repair?” or “How much time is this repair going to take?” are types of questions that project and facility managers face daily in planning activities. Failure or success in developing good schedules, budgets and other project management tasks depend on the project manager's ability to obtain reliable information to be able to answer these types of questions. Young practitioners tend to rely on information that is based on regional averages and provided by publishing companies. This is in contrast to experienced project managers who tend to rely heavily on personal experience. Another aspect of building management is that many practitioners are seeking to improve available scheduling algorithms, estimating spreadsheets and other project management tools. Such “micro-scale” levels of research are important in providing the required tools for the project manager's tasks. However, even with such tools, low quality input information will produce inaccurate schedules and budgets as output. Thus, it is also important to have a broad approach to research at a more “macro-scale.” Recent trends show that the Architectural, Engineering, Construction (AEC) industry is experiencing explosive growth in its capabilities to generate and collect data. There is a great deal of valuable knowledge that can be obtained from the appropriate use of this data and therefore the need has arisen to analyse this increasing amount of available data. Data Mining can be applied as a powerful tool to extract relevant and useful information from this sea of data. Knowledge Discovery in Databases (KDD) and Data Mining (DM) are tools that allow identification of valid, useful, and previously unknown patterns so large amounts of project data may be analysed. These technologies combine techniques from machine learning, artificial intelligence, pattern recognition, statistics, databases, and visualization to automatically extract concepts, interrelationships, and patterns of interest from large databases. The project involves the development of a prototype tool to support facility managers, building owners and designers. This final report presents the AIMMTM prototype system and documents how and what data mining techniques can be applied, the results of their application and the benefits gained from the system. The AIMMTM system is capable of searching for useful patterns of knowledge and correlations within the existing building maintenance data to support decision making about future maintenance operations. The application of the AIMMTM prototype system on building models and their maintenance data (supplied by industry partners) utilises various data mining algorithms and the maintenance data is analysed using interactive visual tools. The application of the AIMMTM prototype system to help in improving maintenance management and building life cycle includes: (i) data preparation and cleaning, (ii) integrating meaningful domain attributes, (iii) performing extensive data mining experiments in which visual analysis (using stacked histograms), classification and clustering techniques, associative rule mining algorithm such as “Apriori” and (iv) filtering and refining data mining results, including the potential implications of these results for improving maintenance management. Maintenance data of a variety of asset types were selected for demonstration with the aim of discovering meaningful patterns to assist facility managers in strategic planning and provide a knowledge base to help shape future requirements and design briefing. Utilising the prototype system developed here, positive and interesting results regarding patterns and structures of data have been obtained.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Experience plays an important role in building management. “How often will this asset need repair?” or “How much time is this repair going to take?” are types of questions that project and facility managers face daily in planning activities. Failure or success in developing good schedules, budgets and other project management tasks depend on the project manager's ability to obtain reliable information to be able to answer these types of questions. Young practitioners tend to rely on information that is based on regional averages and provided by publishing companies. This is in contrast to experienced project managers who tend to rely heavily on personal experience. Another aspect of building management is that many practitioners are seeking to improve available scheduling algorithms, estimating spreadsheets and other project management tools. Such “micro-scale” levels of research are important in providing the required tools for the project manager's tasks. However, even with such tools, low quality input information will produce inaccurate schedules and budgets as output. Thus, it is also important to have a broad approach to research at a more “macro-scale.” Recent trends show that the Architectural, Engineering, Construction (AEC) industry is experiencing explosive growth in its capabilities to generate and collect data. There is a great deal of valuable knowledge that can be obtained from the appropriate use of this data and therefore the need has arisen to analyse this increasing amount of available data. Data Mining can be applied as a powerful tool to extract relevant and useful information from this sea of data. Knowledge Discovery in Databases (KDD) and Data Mining (DM) are tools that allow identification of valid, useful, and previously unknown patterns so large amounts of project data may be analysed. These technologies combine techniques from machine learning, artificial intelligence, pattern recognition, statistics, databases, and visualization to automatically extract concepts, interrelationships, and patterns of interest from large databases. The project involves the development of a prototype tool to support facility managers, building owners and designers. This Industry focused report presents the AIMMTM prototype system and documents how and what data mining techniques can be applied, the results of their application and the benefits gained from the system. The AIMMTM system is capable of searching for useful patterns of knowledge and correlations within the existing building maintenance data to support decision making about future maintenance operations. The application of the AIMMTM prototype system on building models and their maintenance data (supplied by industry partners) utilises various data mining algorithms and the maintenance data is analysed using interactive visual tools. The application of the AIMMTM prototype system to help in improving maintenance management and building life cycle includes: (i) data preparation and cleaning, (ii) integrating meaningful domain attributes, (iii) performing extensive data mining experiments in which visual analysis (using stacked histograms), classification and clustering techniques, associative rule mining algorithm such as “Apriori” and (iv) filtering and refining data mining results, including the potential implications of these results for improving maintenance management. Maintenance data of a variety of asset types were selected for demonstration with the aim of discovering meaningful patterns to assist facility managers in strategic planning and provide a knowledge base to help shape future requirements and design briefing. Utilising the prototype system developed here, positive and interesting results regarding patterns and structures of data have been obtained.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Co-operative Research Centre for Construction Innovation (CRC-CI) is funding a project known as Value Alignment Process for Project Delivery. The project consists of a study of best practice project delivery and the development of a suite of products, resources and services to guide project teams towards the best procurement approach for a specific project or group of projects. These resources will be focused on promoting the principles that underlie best practice project delivery rather than simply identifying an off-the-shelf procurement system. This project builds on earlier work by Sidwell, Kennedy and Chan (2002), on re-engineering the construction delivery process, which developed a procurement framework in the form of a Decision Matrix

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this project is to develop a systematic investment decision-making framework for infrastructure asset management by incorporation economic justification, social and environmental consideration in the decision-making process. This project assesses the factors that are expected to provide significant impacts on the variability of expenditures. A procedure for assessing risk and reliability for project investment appraisals will be developed. The project investigates public perception, social and environmental impacts on road infrastructure investment. This research will contribute to the debate about how important social and environmental issues should be incorporated into the investment decision-making process for infrastructure asset management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The supply chain in the construction industry is less well developed than in manufacturing. This project proposes to bring world class international business profile benchmarking to assist in the development of small and medium sized (SME) subcontractors. This approach has been widely used in Europe and has enabled significant sectoral supply chain development. The construction SME supply chain is a critical component in the delivery of all construction projects. Furthermore, it undermines the sustainability of the individual enterprise and puts construction projects and jobs at risk. Government procurement agencies view this as construction industry capacity building. In the developed and developing worlds, SME sector firms routinely make up over 95% of companies. The construction industry supply chain is dominated by such firms. Supply chain development and capacity building have been largely neglected in the construction sector, despite rhetoric about the importance of the SME sector to the economy This project seeks to investigate the potential to apply the International Business Profile Benchmarking instrument with the construction industry. The project recognises that there are many facets to the quest for continuous improvement in the construction industry and in wider workplace in general. This first interim report reviews the international literature relating to construction industry performance measurement and performance improvement. A summary of the findings follow. ‘Best value’ is dealt with in a separate interim report.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Australia, an average 49 building and construction workers have been killed at work each year since 1997-98. Building/construction workers are more than twice as likely to be killed at work, than the average worker in all Australian industries. The ‘Safer Construction’ project, funded by the CRC-Construction Innovation and led by a task force comprising representatives of construction clients, designers and constructors, developed a Guide to Best Practice for Safer Construction. The Guide, which was informed by research undertaken at RMIT University, Queensland University of Technology and Curtin University, establishes broad principles for the improvement of safety in the industry and provides a ‘roadmap’ for improvement based upon lifecycle stages of a building/construction project. Within each project stage, best practices for the management of safety are identified. Each best practice is defined in terms of the recommended action, its key benefits, desirable outcomes, performance measures and leadership. ‘Safer Construction’ practices are identified from the planning to commissioning stages of a project. The ‘Safer Construction’ project represents the first time that key stakeholder groups in the Australian building/construction industry have worked together to articulate best practice and establish an appropriate basis for allocating (and sharing) responsibility for project safety performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Australia, between 1994 and 2000, 50 construction workers were killed each year as a result of their work, the industry fatality rate, at 10.4 per 100,000 persons, is similar to the national road toll fatality rate and the rate of serious injury is 50% higher than the all industries average. This poor performance represents a significant threat to the industry’s social sustainability. Despite the best efforts of regulators and policy makers at both State and Federal levels, the incidence of death, injury and illness in the Australian construction industry has remained intransigently high, prompting an industry-led initiative to improve the occupational health and safety (OHS) performance of the Australian construction industry. The ‘Safer Construction’ project involves the development of an evidence-based Voluntary Code of Practice for OHS in the industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Capital works procurement and its regulatory policy environment within a country can be complex entities. For example, by virtue of Australia’s governmental division between the Commonwealth, states and local jurisdictions and the associated procurement networks and responsibilities at each level, the tendering process is often convoluted. There are four inter-related key themes identified in the literature in relation to procurement disharmony, including decentralisation, risk & risk mitigation, free trade & competition, and tendering costs. This paper defines and discusses these key areas of conflict that adversely impact upon the business environments of industry through a literature review, policy analysis and consultation with capital works procurement stakeholders. The aim of this national study is to identify policy differences between jurisdictions in Australia, and ascertain whether those differences are a barrier to productivity and innovation. This research forms an element of a broader investigation with an aim of developing efficient, effective and nationally harmonised procurement systems. Keywords: capital works, procurement policy reform Acknowledgement: The research described in this paper carried out by the Australian Cooperative Research Centre for Construction Innovation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As with any strategic planning process, evidence-based estimates are needed to plan effectively for the future. Comments below are based upon data drawn from the Brisbane Long Term Infrastructure Plan (Department of Local Government, Planning, Sport and Recreation, 2005) and the Brisbane Long Term Planning Economic Indicators (National Institute of Economic and Industry Research, 2005), as these are cited as the underpinning research for the economic plan. This submission focuses on one critical aspect of the strategic plan — the relationship between population growth, employment growth, and infrastructure provision. While the focus of the strategic plan is on the changes which would occur within Brisbane, it is important that consideration of predicted changes in surrounding local government areas be also carried out.