81 resultados para House painting

em Queensland University of Technology - ePrints Archive


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Raman spectroscopic analyses of fragmented wall-painting specimens from a Romano-British villa dating from ca. 200 AD are reported. The predominant pigment is red haematite, to which carbon, chalk and sand have been added to produce colour variations, applied to a typical Roman limewash putty composition. Other pigment colours are identified as white chalk, yellow (goethite), grey (soot/chalk mixture) and violet. The latter pigment is ascribed to caput mortuum, a rare form of haematite, to which kaolinite (possibly from Cornwall) has been added, presumably in an effort to increase the adhesive properties of the pigment to the substratum. This is the first time that kaolinite has been reported in this context and could indicate the successful application of an ancient technology discovered by the Romano-British artists. Supporting evidence for the Raman data is provided by X-ray diffraction and SEM-EDAX analyses of the purple pigment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Knowmore (House of Commons) is a large scale generative interactive installation that incorporates embodied interaction, dynamic image creation, new furniture forms, touch sensitivity, innovative collaborative processes and multichannel generative sound creation. A large circular table spun by hand and a computer-controlled video projection falls on its top, creating an uncanny blend of physical object and virtual media. Participants’ presence around the table and how they touch it is registered, allowing up to five people to collaboratively ‘play’ this deeply immersive audiovisual work. Set within an ecological context, the work subtly asks what kind of resources and knowledges might be necessary to move us past simply knowing what needs to be changed to instead actually embodying that change, whilst hinting at other deeply relational ways of understanding and knowing the world. The work has successfully operated in two high traffic public environments, generating a subtle form of interactivity that allows different people to interact at different paces and speeds and with differing intentions, each contributing towards dramatic public outcomes. The research field involved developing new interaction and engagement strategies for eco-political media arts practice. The context was the creation of improved embodied, performative and improvisational experiences for participants; further informed by ‘Sustainment’ theory. The central question was, what ontological shifts may be necessary to better envision and align our everyday life choices in ways that respect that which is shared by all - 'The Commons'. The methodology was primarily practice-led and in concert with underlying theories. The work’s knowledge contribution was to question how new media interactive experience and embodied interaction might prompt participants to reflect upon the kind of resources and knowledges required to move past simply knowing what needs to be changed to instead actually embodying that change. This was achieved through focusing on the power of embodied learning implied by the works' strongly physical interface (i.e. the spinning of a full size table) in concert with the complex field of layered imagery and sound. The work was commissioned by the State Library of Queensland and Queensland Artworkers Alliance and significantly funded by The Australia Council for the Arts, Arts Queensland, QUT, RMIT Centre for Animation and Interactive Media and industry partners E2E Visuals. After premiering for 3 months at the State Library of Queensland it was curated into the significant ‘Mediations Biennial of Modern Art’ in Poznan, Poland. The work formed the basis of two papers, was reviewed in Realtime (90), was overviewed at Subtle Technologies (2010) in Toronto and shortlisted for ISEA 2011 Istanbul and included in the edited book/catalogue ‘Art in Spite of Economics’, a collaboration between Leonardo/ISAST (MIT Press); Goldsmiths, University of London; ISEA International; and Sabanci University, Istanbul.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The picturesque aesthetic in the work of Sir John Soane, architect and collector, resonates in the major work of his very personal practice – the development of his house museum, now the Soane Museum in Lincoln’s Inn Fields in London. Soane was actively involved with the debates, practices and proponents of picturesque and classical practices in architecture and landscape and his lectures reveal these influences in the making of The Soane, which was built to contain and present diverse collections of classical and contemporary art and architecture alongside scavenged curiosities. The Soane Museum has been described as a picturesque landscape, where a pictorial style, together with a carefully defined itinerary, has resulted in the ‘apotheosis of the Picturesque interior’. Soane also experimented with making mock ruinscapes within gardens, which led him to construct faux architectures alluding to archaeological practices based upon the ruin and the fragment. These ideas framed the making of interior landscapes expressed through spatial juxtapositions of room and corridor furnished with the collected object that characterise The Soane Museum. This paper is a personal journey through the Museum which describes and then reviews aspects of Soane’s work in the context of contemporary theories on ‘new’ museology. It describes the underpinning picturesque practices that Soane employed to exceed the boundaries between interior and exterior landscapes and the collection. It then applies particular picturesque principles drawn from visiting The Soane to a speculative project for a house/landscape museum for the Oratunga historic property in outback South Australia, where the often, normalising effects of conservation practices are reviewed using minimal architectural intervention through a celebration of ruinous states.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Sydney Opera House Facilities Management Exemplar Project (SOH FM Exemplar Project) aims to develop innovative research on facility management (FM) with the focus on asset maintenance. The project utilises the Sydney Opera House (SOH), one of most unique buildings in Australia, to research and create innovative FM strategies and models that will have a direct beneficial role for the Australian facilities management industry as well as the economy as a whole. The procurement, benchmarking and digitisation are crucial in improving the performance of FM. The procurement develops strategic plan and deployment framework enabling products, services, etc. meet objectives of performance, economic, environment, etc. Benchmarking is a technology used to compare practice and assess performance against the competitors recognised as industry leaders who achieve most successful activities in the field. Digitisation develops digitized FM modelling that facilitates the integration and automation of facility management. The project carries out the research on all the three areas as well as the relationship between them. It aims to develop an integrated approach for the improvement of FM performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

“SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM)”. The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: • The re-usability of building information for FM purposes • BIM as an Integrated information model for facility management • Extendibility of the BIM to cope with business specific requirements • Commercial facility management software using standardised building information models • The ability to add (organisation specific) intelligence to the model • A roadmap for SOH to adopt BIM for FM The project has established that BIM – building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC – open building exchange standard – specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user “lock in” to proprietary solutions, third party software can be the “best of breed” to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users’ information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the House’s existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House – FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data – provided by several of SOH’s current consultants – show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper presents an interim summary of research and case studies being undertaken in the Sydney Opera House FM Exemplar Project covering procurement, benchmarking and building information models. The final outcomes of the FM Exemplar Project will be presented through various forums open to all FM practitioners and published in Australia and elsewhere through relevant journals. Sydney Opera House is an Australian icon, attracting some 4.5 million visitors per year who admire its built form and enjoy an evening of theatre. The building is the attraction, part of the experience. Therefore, facilities management is critical to the success of the Sydney Opera House enterprise and an ideal subject for the study of facilities management. Significantly the three research themes are heavily intertwined – effective risk sharing in procurement requires historic information and benchmarks for future performance, benchmarking gathers vast quantities of data that can only be exploited if properly related to one another and a building information model provides the means to manage such data. The case studies are emerging as real-life examples of how one organisation is addressing FM issues common to many, and will provide useful lessons for practitioners pursing similar strategies in their own organisations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Cooperative Research Centre for Construction Innovation1 (hereafter called Construction Innovation) supports the notion of the establishment of a Sustainability Charter for Australia and is interested in working collaboratively to achieve this outcome. A number of challenges need to be addressed to develop this Charter. This submission outlines these challenges and possible responses to them by a Sustainability Commission.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The challenges of maintaining a building such as the Sydney Opera House are immense and are dependent upon a vast array of information. The value of information can be enhanced by its currency, accessibility and the ability to correlate data sets (integration of information sources). A building information model correlated to various information sources related to the facility is used as definition for a digital facility model. Such a digital facility model would give transparent and an integrated access to an array of datasets and obviously would support Facility Management processes. In order to construct such a digital facility model, two state-of-the-art Information and Communication technologies are considered: an internationally standardized building information model called the Industry Foundation Classes (IFC) and a variety of advanced communication and integration technologies often referred to as the Semantic Web such as the Resource Description Framework (RDF) and the Web Ontology Language (OWL). This paper reports on some technical aspects for developing a digital facility model focusing on Sydney Opera House. The proposed digital facility model enables IFC data to participate in an ontology driven, service-oriented software environment. A proof-of-concept prototype has been developed demonstrating the usability of IFC information to collaborate with Sydney Opera House’s specific data sources using semantic web ontologies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The digital modelling research stream of the Sydney Opera House FM Exemplar Project has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House did not have digital models of its structure, there was an opportunity to investigate the application of digital modelling using standardised Building Information Models (BIM) to support facilities management (FM).The focus of this investigation was on the following areas:the re-usability of standardised BIM for FM purposesthe potential of BIM as an information framework acting as integrator for various FM data sources the extendibility and flexibility of the BIM to cope with business-specific data and requirements commercial FM software using standardised BIMthe ability to add (organisation-specific) intelligence to the modela roadmap for Sydney Opera House to adopt BIM for FM.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Set atop a magnificent site on the Bellarine Peninsula, Contour House anchors itself into the landscape with a 5.5 meter-high folding concrete wall. This gesture is both protective and revealing, simultaneously creating an internal courtyard, while extending the spectacular 270- degree views into the living areas. This residence extends our interest in 'the journey' and ideas of place-making, particularly the manner in which it might challenge preconceived ways of living.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Large cities provide a broad range of residential property types, as well as a range of socio-economic locations. This results in a significant variation in residential property prices across both the city itself and the individual suburbs. The only constant across such a diverse range of residential property is the need for the majority of residential property owners to employ the services of a real estate agent to sell their property or to purchase a residential property. This paper will analyse the Sydney residential property market over the period 1994 to 2002 to determine the change in real estate offices numbers over the period, the profitability of real estate agency offices based on the residential house price performance of houses and units in these specific locations and the extent of changing residential house prices on agency profitability. Suburbs have been selected to provide a full range of housing types, socio-economic areas, older established and developing residential suburbs and location from the

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Howard East rural area has experienced a rapid growth of small block subdivisions and horticulture over the last 40 years, which has been based on groundwater supply. Early bores in the area provide part of the water supply for Darwin City and are maintained and monitored by NT Power & Water Corporation. The Territory government (NRETAS) has established a monitoring network, and now 48 bores are monitored. However, in the area there are over 2700 private bores that are unregulated.Although NRETAS has both FDM and FEM simulations for the region, community support for potential regulation is sought. To improve stakeholder understanding of the resource QUT was retained by the TRaCKconsortium to develop a 3D visualisation of the groundwater system.