80 resultados para HIGHWAY SECTION
em Queensland University of Technology - ePrints Archive
Resumo:
International practice-led design research in landscape architecture has identified wetland sites as highly significant and potentially fragile environments in many countries. China has considerable wetland acreage that has been drained and transformed into farmland to address local poverty of farmers. An important gap in knowledge exists as to how to design Chinese public open spaces to reduce water contamination, flood severity and loss of farmland for local villagers as urban development expands. This project responded to the opportunity of introducing a new type of wetland design to Stage 3 of the Bailang River Redevelopment, Weifang City, Shandong Province. The work proposed a range of wetland design innovations for Chinese wetland environments to encourage on-site solutions to contamination and flooding problems.
Resumo:
This paper presents a road survey as part of a workshop conducted by the Texas Department of Transportation (TxDOT) to evaluate and improve the maintenance practices of the Texas highway system. Directors of maintenance from six peer states (California, Kansas, Georgia, Missouri, North Carolina, and Washington) were invited to this 3-day workshop. One of the important parts of this workshop was a Maintenance Test Section Survey (MTSS) to evaluate a number of pre-selected one-mile roadway sections. The workshop schedule allowed half a day to conduct the field survey and 34 sections were evaluated. Each of the evaluators was given a booklet and asked to rate the selected road sections. The goals of the MTSS were to: 1. Assess the threshold level at which maintenance activities are required as perceived by the evaluators from the peer states; 2. Assess the threshold level at which maintenance activities are required as perceived by evaluators from other TxDOT districts; and 3. Perform a pilot evaluation of the MTSS concept. This paper summarizes the information obtained from survey and discusses the major findings based on a statistical analysis of the data and comments from the survey participants.
Resumo:
A Maintenance Test Section Survey (MTSS) was conducted as part of a Peer State Review of the Texas Maintenance Program conducted October 5–7, 2010. The purpose of the MTSS was to conduct a field review of 34 highway test sections and obtain participants’ opinions about pavement, roadside, and maintenance conditions. The goal was to cross reference or benchmark TxDOT’s maintenance practices based on practices used by selected peer states. Representatives from six peer states (California, Georgia, Kansas, Missouri, North Carolina, and Washington) were invited to Austin to attend a 3-day Peer State Review of TxDOT Maintenance Practices Workshop and to participate in a field survey of a number of pre-selected one-mile roadway sections. It should be emphasized that the objective of the survey was not to evaluate and grade or score TxDOT’s road network but rather to determine whether the selected roadway sections met acceptable standards of service as perceived by Directors of Maintenance or senior maintenance managers from the peer states...
Resumo:
Commonwealth legislation covering insurance contracts contains numerous provisions designed to control the operation and effect of terms in life and general insurance contracts. For example, the Life Insurance Act 1995 (Cth) contains provisions regulating the consequences attendant upon incorrect statements in proposals [1] and non-payment of premiums, [2] provides that an insurer may only exclude liability in the case of suicide if it has made express provision for such contingency in its policy, [3] and severely restricts the efficacy of conditions as to war risks. [4] The Insurance Contracts Act 1984 (Cth) is even more intrusive and has a major impact upon contractual provisions in the general insurance field. It is beyond the scope of this note to explore all of these provisions in any detail but examples of controls and constraints imposed upon the operation and effect of contractual provisions include the following. A party is precluded from relying upon a provision in a contract of insurance if such reliance would amount to a failure to act with the utmost good faith. [5] Similarly, a policy provision which requires differences or disputes arising out of the insurance to be submitted to arbitration is void, [6] unless the insurance is a genuine cover for excess of loss over and above another specified insurance. [7] Similarly clause such as conciliation clauses, [8] average clauses, [9] and unusual terms [10] are given qualified operation. [11] However the provision in the Insurance Contracts Act that has the greatest impact upon, and application to, a wide range of insurance clauses and claims is s 54. This section has already generated a significant volume of case law and is the focus of this note. In particular this note examines two recent cases. The first, Johnson v Triple C Furniture and Electrical Pty Ltd [2012] 2 Qd R 337, (hereafter the Triple C case), is a decision of the Queensland Court of Appeal; and the second, Matthew Maxwell v Highway Hauliers Pty Ltd [2013] WASCA 115, (hereafter the Highway Hauliers case), is a decision of the Court of Appeal in Western Australia. This latter decision is on appeal to the High Court of Australia. The note considers too the decision of the New South Wales Court of Appeal in Prepaid Services Pty Ltd v Atradius Credit Insurance NV [2013] NSWCA 252 (hereafter the Prepaid Services case).These cases serve to highlight the complex nature of s 54 and its application, as well as the difficulty in achieving a balance between an insurer and an insured's reasonable expectations.
Resumo:
Aiming at the shortage of prevailing prediction methods about highway truck conveyance configuration in over-limit freight research that transferring the goods attributed to over-limit portion to another fully loaded truck of the same configuration and developing the truck traffic volume synchronously, a new way to get accumulated probability function of truck power tonnage in basal year by highway truck classified by wheel and axle type load mass spectrum investigation was presented. Logit models were used to forecast overall highway freight diversion and single cargo tonnage diversion when the weight rules and strict of enforcement intensity of overload were changed in scheme year. Assumption that the probability distribution of single truck loadage should be consistent with the probability distribution of single goods freighted, the model describes the truck conveyance configuration in the future under strict over-limit prohibition. The model was used and tested in Highway Over-limit Research Project in Anhui by World Bank.
Resumo:
The management of main material prices of provincial highway project quota has problems of lag and blindness. Framework of provincial highway project quota data MIS and main material price data warehouse were established based on WEB firstly. Then concrete processes of provincial highway project main material prices were brought forward based on BP neural network algorithmic. After that standard BP algorithmic, additional momentum modify BP network algorithmic, self-adaptive study speed improved BP network algorithmic were compared in predicting highway project main prices. The result indicated that it is feasible to predict highway main material prices using BP NN, and using self-adaptive study speed improved BP network algorithmic is the relatively best one.
Resumo:
The highway express freight transportation (HEFT) is a new transportation organization form separated from the common freight transportation with economic development and incessant adjustment of highway transportation structure in China. At present, the phenomenon of inadaptability still exists in the HEFT system of China, from foundation structure like highways, parking lots and stations to transportation equipments and transportation organizing. In order to develop the HEFT system more rationally and effectively, we should start with the structure of the system, conform the resources existing, and consummate the freight transport system. In due course, relevant policies and measures to supervise, lead and support are necessary and important. This paper analyzes the existing problems of HEFT system in our country, based on its characteristics, development situation and adaptability, and presents the policy and measures of promoting and leading the development of the HEFT system.
Resumo:
Some new types of mathematical model among four key techno - economic indexes of highway rapid passenger through transportation were established based on the principles of transportation economics. According to the research on the feasible solutions to the associated parameters which were then compared to the actual value, found some limitation in the existing transport organization method. In order to conquer that, two new types of transport organization method, namely CD (Collecting and Distributing) Method and Relay Method were brought forward. What’s more, a further research was down to estimate their characteristics, such as feasibilities, operation flows, applicability fields, etc. This analysis proves the two methods can offset the shortage of rapid passenger through transportation. To ensure highway rapid passenger transport develop harmoniously, a three-stage development targets was suggested to fuse different organization methods.
Resumo:
In 2004, with the increasing overloading restriction requirements of society in Anhui, a provincial comprehensive overloading transportation survey has been developed to take evaluations on overloading actuality and enforcement efficiency with the support of the World Bank. A total of six site surveys were conducted at Hefei, Fuyang, Luan, Wuhu, Huainan and Huangshan Areas with four main contents respectively: traffic volume, axle load, freight information and registration information. Via statistical analysis on the survey data, conclusions were gained that: vehicle overloading are very universal and serious problems at arterial highways in Anhui now. The traffic loads have far exceeded the designed endure capacity of highways and have caused prevalent premature pavement damage, especially for rigid pavement. The overloading trucks are unimpeded engaged in highway freight transportation actually due to the disordered overloading enforcement strategies and the deficient inspecting technologies.