255 resultados para Government contracts

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

All Australian governments are significantly increasing the use of contracted community service provision through not for profit (NFP) organisations. These transactions occur through grant arrangements which take the form of standard contracts or deeds rather than drawing on statutory authority. Government inquiries bodies have consistently reported and raised concerns about the fairness of such standard grant contract terms, but failed to provide any mechanism whereby fairness can be assured. The Productivity Commission has suggested that the resulting poor relationship results in inappropriate risk transfer, micro-management, disincentives to innovate and poor service provision. This paper develops and tests a fairness measure based on the principles of the Australian Consumer Law which legislates fairness protections for standard consumer contracts.  

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Government contracts for services typically include terms requiring contractors to comply with minimum labour standards laws. Procurement contract clauses specify reporting procedures and sanctions for non-compliance, implying that government contracting agencies will monitor and enforce minimum labour standards within contract performance management. In this article, the case of school cleaners employed under New South Wales government contracts between 2010 and 2011 is the vehicle for exploring the effectiveness of these protective clauses. We find that the inclusion of these protective clauses in procurement contracts is unnecessary in the Australian context, and any expectations that government contracting agencies will monitor and enforce labour standards are misleading. At best, the clauses are rhetoric, and at worst, they are a distraction for parties with enforcement powers.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The construction industry plays a substantial role in a country’s national economy, irrespective of the country’s levels of economic development. The Malaysian Government has given a much needed boost to the country’s construction projects under the 9th Malaysian Plan where a total of 880 projects worth RM15billion (US$48billion) is to be tendered (The Star, 2006). However, Malaysia has not escaped the problems of project failure. In 2005, 17.3% of 417 Malaysian government contracts projects were considered “sick”. Project procurement is one of the most important stages of project delivery. Even though ethics in project procurement has been identified as one of the contributors to project failure, it has not been systematically studied before from the perspective of client in Malaysia. The aim of this paper is to present an exploration to the ethical issues in project procurement in Malaysian public sector projects. By exploring ethical issues from client perspective, this could provide an ethical standpoint for the project life cycle and could maintain a good affiliation between the clients and the customers. It is expected that findings from this review will be somewhat representative of other developing countries.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The use of grant contracts to deliver community services is now a significant feature of all Australian government administrations. These contracts are the primary instrument governing the provision of such services to citizens and are largely outside the usual parliamentary review mechanisms and constraints. This article examines the extent of the erosion of fundamental constitutional principles facilitated by the use of private contracts, by applying the principles used in scrutiny of delegated legislation to standard form federal and State community service contracts. It reveals extensive executive power which, if the relationship were founded in legislative instruments rather than in private contract, would have to be justified to Parliament at least and possibly not tolerated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper explores the likely efficacy of government agencies using their contracting relationships with private firms to affect training outcomes in the construction industry. Specifically, it reports on the results of a study of two training policies of theWestern Australian government. Empirical data is drawn from the government’s Tender Registration System between 1997 and 2006. The main finding of the quantitative analysis is that in the absence of strong industry commitment to policy objectives, the contracting approach is likely to result in high levels of avoidance activity and generate very few benefits. The results of a qualitative investigation also support these findings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Land Sales Act 1984 regulates “off the plan” sales in Queensland in conjunction with several provisions in the Body Corporate and Community Management Act 1997. Together the Acts regulate sales in both unit developments and housing estates. From 2010 to 2013 the Queensland Government undertook a comprehensive review of the Land Sales Act 1984 to identify opportunities to modernise and improve the legislation. Significant changes were recommended by the Review to align the Land Sales Act 1984 (LSA) with current surveying and conveyancing practice and to overcome a number of practical issues faced by developers under the current legislation. A significant outcome of the review is the removal of provisions related to off the plan community title sales from the LSA to the Body Corporate and Community Management Act 1997 (BCCMA) and the Building Units and Group Titles Act 1980 (BUGTA). This article examines the Land Sales and Other Legislation Amendment Act 2014 due to commence in November 2014.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

New public management (NPFM), with its hands-on, private sector-style performance measurement, output control, parsimonious use of resources, disaggreation of public sector units and greater competition in the public sector, has significantly affected charitable and nonprofit organisations delivering community services (Hood, 1991; Dunleavy, 1994; George & Wilding, 2002). The literature indicates that nonprofit organisations under NPM believe they are doing more for less: while administration is increasing, core costs are not being met; their dependence on government funding comes at the expense of other funding strategies; and there are concerns about proportionality and power asymmetries in the relationship (Kerr & Savelsberg, 2001; Powell & Dalton, 2011; Smith, 2002, p. 175; Morris, 1999, 2000a). Government agencies are under increased pressure to do more with less, demonstrate value for money, measure social outcomes, not merely outputs and minimise political risk (Grant, 2008; McGreogor-Lowndes, 2008). Government-community service organisation relationships are often viewed as 'uneasy alliances' characterised by the pressures that come with the parties' differing roles and expectations and the pressures that come with the parties' differing roles and expectations and the pressurs of funding and security (Productivity Commission, 2010, p. 308; McGregor-Lowndes, 2008, p. 45; Morris, 200a). Significant community services are now delivered to citizens through such relationships, often to the most disadvantaged in the community, and it is important for this to be achieved with equity, efficiently and effectively. On one level, the welfare state was seen as a 'risk management system' for the poor, with the state mitigating the risks of sickness, job loss and old age (Giddens, 1999) with the subsequent neoliberalist outlook shifting this risk back to households (Hacker, 2006). At the core of this risk shift are written contracts. Vincent-Jones (1999,2006) has mapped how NPM is characterised by the use of written contracts for all manner of relations; e.g., relgulation of dealings between government agencies, between individual citizens and the state, and the creation of quais-markets of service providers and infrastructure partners. We take this lens of contracts to examine where risk falls in relation to the outsourcing of community services. First we examine the concept of risk. We consider how risk might be managed and apportioned between governments and community serivce organisations (CSOs) in grant agreements, which are quasiy-market transactions at best. This is informed by insights from the law and economics literature. Then, standard grant agreements covering several years in two jurisdictions - Australia and the United Kingdom - are analysed, to establish the risk allocation between government and CSOs. This is placed in the context of the reform agenda in both jurisdictions. In Australia this context is th enonprofit reforms built around the creation of a national charities regulator, and red tape reduction. In the United Kingdom, the backdrop is the THird Way agenda with its compacts, succeed by Big Society in a climate of austerity. These 'case studies' inform a discussion about who is best placed to bear and manage the risks of community service provision on behalf of government. We conclude by identifying the lessons to be learned from our analysis and possible pathways for further scholarship.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BIM as a suite of technologies has been enabled by the significant improvements in IT infrastructure, the capabilities of computer hardware and software, the increasing adoption of BIM, and the development of Industry Foundation Classes (IFC) which facilitate the sharing of information between firms. The report highlights the advantages of BIM, particularly the increased utility and speed, better data quality and enhanced fault finding in all construction phases. Additionally BIM promotes enhanced collaborations and visualisation of data mainly in the design and construction phase. There are a number of barriers to the effective implementation of BIM. These include, somewhat paradoxically, a single detailed model (which precludes scenarios and development of detailed alternative designs); the need for three different interoperability standards for effective implementation; added work for the designer which needs to be recognised and remunerated; the size and complexity of BIM, which requires significant investment in human capital to enable the realisation of its full potential. There are also a number of challenges to implementing BIM. The report has identified these as a range of issues concerning: IP, liability, risks and contracts, and the authenticity of users. Additionally, implementing BIM requires investment in new technology, skills training and development of news ways of collaboration. Finally, there are likely to be Trade Practices concerns as requiring certain technology owned by relatively few firms may limit

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The partnership form of privatisation is increasingly being used, in particular to carry out complex and evolving bundles of services. These have not previously been privatised because of incomplete contracts and contract management difficulties. Improved performance of the government entity as contract administrator and member of the partnership is crucial to modern service delivery expectations yet the privatisation literature has focused on other aspects of partnerships leaving the understanding of factors impacting the effectiveness of the government entity underdeveloped. This paper proposes the development of knowledge as to the range of factors which impact the effectiveness of the government entity. There is limited data available as to the operation of trust in the partnership relationship, and as to the capability of a range of privatisation forms to achieve stewardship of infrastructure. This research will utilise the findings from that research to build a tentative framework which will be utilised in staged research interrogating first the privatization literature and then the literature of other disciplines and sectors. The combined data will be analysed to provide government and practitioners such as government entity CEO’s with a complete listing of the operation of the factors which impact the effectiveness of the government entity in contributing to improved service delivery.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trialed. Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.