74 resultados para Formal specification
em Queensland University of Technology - ePrints Archive
Resumo:
Reducing complexity in Information Systems is an important topic in both research and industry. One strategy to deal with complexity is separation of concerns, which results in less complex, easily maintainable and more reusable systems. Separation of concerns can be addressed through the Aspect Oriented paradigm. Although this paradigm has been well researched in programming, it is still at the preliminary stage in the area of Business Process Management. While some efforts have been made to extend business process modelling with aspect oriented capability, it has not yet been investigated how aspect oriented business process models should be executed at runtime. In this paper, we propose a generic solution to support execution of aspect oriented business process models based on the principle behind dynamic weaving of aspects. This solution is formally specified using Coloured Petri Nets. The resulting formal specification serves as the blueprint to the implementation of a service module in the framework of a state-of-the-art Business Process Management System. Using this developed artefact, a case study is performed in which two simplified processes from real business in the domain of banking are modelled and executed in an aspect oriented manner. Through this case study, we also demonstrate that adoption of aspect oriented modularization increases the reusability while reducing the complexity of business process models in practice.
Resumo:
Agent-oriented conceptual modelling (AoCM) approaches in Requirements Engineering (RE) have received considerable attention recently. Semi-formal modeling frameworks such as i* assist analysts in requirements elicitation and reasoning of early-phase RE. AgentSpeak(L) is a widely accepted agent programming language. The Strategic Rationale (SR) model of the i* framework naturally lends itself to AgentSpeak(L) programs. Furthermore, the Strategic Dependency (SD) component of the i* framework prescribes the interaction between the agents in a multi-agent environment. This paper proposes a formal methodology for transforming a SR model to an AgentS- peak(L) agent. The constructed AgentSpeak(L) agents will then form the essential components of a multi-agent system, MAS.
Resumo:
This paper provides a detailed description of the current Australian e-passport implementation and makes a formal verification using model checking tools CASPER/CSP/FDR. We highlight security issues present in the current e-passport implementation and identify new threats when an e-passport system is integrated with an automated processing systems like SmartGate. Because the current e-passport specification does not provide adequate security goals, to perform a rational security analysis we identify and describe a set of security goals for evaluation of e-passport protocols. Our analysis confirms existing security issues that were previously informally identified and presents weaknesses that exists in the current e-passport implementation.
Pregnancy Discrimination in Queensland: Internal Labour Market Issues and Progress to Formal Redress
Resumo:
Research has suggested that corporate venturing is crucial to strategic renewal and firm performance, yet scholars still debate the appropriate organizational configurations to facilitate the creation of new businesses in existing organizations. Our study investigates the effectiveness of combining structural differentiation with formal and informal organizational as well as top management team integration mechanisms in establishing an appropriate context for venturing activities. Our findings suggest that structural differentiation has a positive effect on corporate venturing. In addition, our study indicates that a shared vision has a positive effect on venturing in a structurally differentiated context. Socially integrated senior teams and cross-functional interfaces, however, are ineffective integration mechanisms for establishing linkages across differentiated units and for successfully pursuing corporate venturing.
Resumo:
Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.