4 resultados para Buildability
em Queensland University of Technology - ePrints Archive
Resumo:
The basic researches about constructability issue done in different countries demonstrate the potential power of this concept to affect the total goals of the construction projects which can lead to significant cost saving, time saving and better quality via considering the contractors’ construction experience in earlier construction project phases. The present research assesses the familiarity of Malaysian building contractors with constructability concept and activities; then it tests their general opinions on its implementation in different construction phases and projects. As the result, some descriptive studies are done on amount of contractors’ familiarity with this term among various kinds of contractors, projects and contracts which can illustrate constructability implementation level among Malaysian contractors. The results of this study show that Malaysian contractors are not all familiar enough with this term and there are still some barriers that prevent them from taking part in its activities completely. The differences in amount of familiarity with constructability matter and its terms of implementation are quite obvious among various types of participants.
Resumo:
After the primary researches on constructability issue which were implemented in United States, United Kingdom and Australia, more explorations were applied on that in order to assess this unique scientific fact in East Asian country of Malaysia. Based on the latest researches done on constructability concept in Malaysia, the most Critical Constructability Activities (CCAs) are defined according to amount of contractors’ participation in each activity and amount of gap between actual and potential effects of each of them on achieving the overall objectives of the construction projects with more cost and time savings and better quality which is the whole aim of a beneficial constructability activity. The present research aims to assess the current findings on CCAs in order to identify the types of contractors and projects which these CCAs are getting performed in and also the types of contracts is used in these CCAs. Finally it was found that there are some significant differences in amount of contractors’ involvement in CCAs among various considered independent variables. This study uses the former researches to help Malaysian construction stakeholders to find out the barriers of constructability implementation in building projects via giving more details on application of CCAs among different IVs.
Resumo:
Fundamental studies on constructability issue done in United States, United Kingdom and Australia illustrate capability of this concept to affect overall objectives of construction projects. It can result in significant cost and time savings and improved final quality by consideration of construction contractors experiences during conceptual planning and design phases. As intensive as these studies are, they do not attempt to investigate importance of these activities in order to find each of their specific barriers separately. This research explores Constructability Activities (CAs) in all project phases separately based on amount of contractors involvement in each activity and also amount of gap that exists between target and actual effects of each activity on achieving the final objectives of building projects in Malaysia. It ends to development of Critical Constructability Activities (CCAs). This research is crucial to gaining a better understanding of CCAs which are caused based on contractors higher participation percentage and larger gaps between their target and actual effects on achieving the final aims of the project. This research highlights the need to overcome barriers of CAs implementation in building projects. This study recommends construction stakeholders to concentrate more on CCAs in order to achieve the overall objectives of the project much faster and easier.
Resumo:
This project was a step forward in developing an extension of the concept of constructability to include the post-occupancy stages of operation and maintenance. This was through an in-depth study of Australian health projects and interviews with professionals in the field. The thesis investigated how the operation and maintenance stakeholders can enter the initial planning, design and construction phases resulting in more efficient and effective delivery of infrastructure projects.