5 resultados para Biofilter

em Queensland University of Technology - ePrints Archive


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Despite recent developments in fixed-film combined biological nutrients removal (BNR) technology; fixed-film systems (i.e., biofilters), are still at the early stages of development and their application has been limited to a few laboratory-scale experiments. Achieving enhanced biological phosphorus removal in fixed-film systems requires exposing the micro-organisms and the waste stream to alternating anaerobic/aerobic or anaerobic/anoxic conditions in cycles. The concept of cycle duration (CD) as a process control parameter is unique to fixed-film BNR systems, has not been previously investigated, and can be used to optimise the performance of such systems. The CD refers to the elapsed time before the biomass is re-exposed to the same environmental conditions in cycles. Fixed-film systems offer many advantages over suspended growth systems such as reduced operating costs, simplicity of operation, absence of sludge recycling problems, and compactness. The control of nutrient discharges to water bodies, improves water quality, fish production, and allow water reuse. The main objective of this study was to develop a fundamental understanding of the effect of CD on the transformations of nutrients in fixed-film biofilter systems subjected to alternating aeration I no-aeration cycles A fixed-film biofilter system consisting of three up-flow biofilters connected in series was developed and tested. The first and third biofilters were operated in a cyclic mode in which the biomass was subjected to aeration/no-aeration cycles. The influent wastewater was simulated aquaculture whose composition was based on actual water quality parameters of aquacuture wastewater from a prawn grow-out facility. The influent contained 8.5 - 9:3 mg!L a111monia-N, 8.5- 8.7 mg/L phosphate-P, and 45- 50 mg!L acetate. Two independent studies were conducted at two biofiltration rates to evaluate and confirm the effect of CD on nutrient transformations in the biofilter system for application in aquaculture: A third study was conducted to enhance denitrification in the system using an external carbon- source at a rate varying from 0-24 ml/min. The CD was varied in the range of0.25- 120 hours for the first two studies and fixed at 12 hours for the third study. This study identified the CD as an important process control parameter that can be used to optimise the performance of full-scale fixed-film systems for BNR which represents a novel contribution in this field of research. The CD resulted in environmental conditions that inhibited or enhanced nutrient transformations. The effect of CD on BNR in fixed-film systems in terms of phosphorus biomass saturation and depletion has been established. Short CDs did not permit the establishment of anaerobic activity in the un-aerated biofilter and, thus, inhibited phosphorus release. Long CDs resulted in extended anaerobic activity and, thus, resulted in active phosphorus release. Long CDs, however, resulted in depleting the biomass phosphorus reservoir in the releasing biofilter and saturating the biomass phosphorus reservoir in the up-taking biofilter in the cycle. This phosphorus biomass saturation/depletion phenomenon imposes a practical limit on how short or long the CD can be. The length of the CD should be somewhere just before saturation or depletion occur and for the system tested, the optimal CD was 12 hours for the biofiltration rates tested. The system achieved limited net phosphorus removal due to the limited sludge wasting and lack of external carbon supply during phosphorus uptake. The phosphorus saturation and depletion reflected the need to extract phosphorus from the phosphorus-rich micro-organisms, for example, through back-washing. The major challenges of achieving phosphorus removal in the system included: (I) overcoming the deterioration in the performance of the system during the transition period following the start of each new cycle; and (2) wasting excess phosphorus-saturated biomass following the aeration cycle. Denitrification occurred in poorly aerated sections of the third biofilter and generally declined as the CD increased and as the time progressed in the individual cycle. Denitrification and phosphorus uptake were supplied by an internal organic carbon source, and the addition of an external carbon source (acetate) to the third biofilter resulted in improved denitrification efficiency in the system from 18.4 without supplemental carbon to 88.7% when the carbon dose reached 24 mL/min The removal of TOC and nitrification improved as the CD increased, as a result of the reduction in the frequency of transition periods between the cycles. A conceptual design of an effective fixed-film BNR biofilter system for the treatment of the influent simulated aquaculture wastewater was proposed based on the findings of the study.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Bargara Pasturage Reserve: Future Visions This exhibition showcases the work of Postgraduate Landscape Architecture and final year Undergraduate Civil and Environmental Engineering students in response to issues of sustainability in a coastal wetland known as the Bargara Pasturage Reserve; an exemplar of the many issues facing sensitive coastal places in Queensland today. The 312ha Pasturage Reserve at Bargara is the only biofilter between the pressures of Bargara’s urban and tourism expansion, surrounding sugarcane farming, and the Great Sandy Marine Park, including the largest concentration of nesting marine turtles on the eastern Australian mainland. This ephemeral wetland, while struggling to fulfil its coastal biofiltration function, is also in high demand for passive recreation, and the project partners’ priorities were to meet both of these challenges. The students were required to plan and design for the best balance possible amongst, but not limited to: wetland and coastal ecological health, enhancement of cultural heritage and values, sustainable urban development, and local economic health. To understand these challenges, QUT staff and students met with partners, visited and analysed the Pasturage Reserve, spent time in and around Bargara talking to locals and inviting dialogue with Indigenous representatives and the South Sea Islander community. We then went home to Brisbane to undertake theoretical and technical research, and then worked to produce 11 Strategic Plans, 2 Environmental Management Plans and 33 Detailed Designs. One group of students analysed the Bargara coastal landscape as an historical and ongoing series of conversations between ecological systems, cultural heritage, community and stakeholders. Another group identified the landscape as neither ‘urban,’ ‘rural,’ nor ‘natural,’ instead identifying it metaphorically as a series of layered thematic ‘fields’ such as water, conservation, reconciliation, and educational fields. These landscape analyses became the organising mechanisms for strategic planning. An outstanding Strategic Plan was produced by Zhang, Lemberg and Jensen, entitled Metanoia, which means to ‘make a change as the result of reflection on values’. Three implementation phases of “flow”, “flux”, and “flex” span twenty-five years, and present a vision a coastal and marine research and conservation hub, with a focus on coastal wetland function, turtle habitat and coral reef conservation. An Environmental Management Plan by Brand and Stickland focuses on protecting and improving wetland biodiversity and habitat quality, and increasing hydrological and water quality function; vital in a coastal area of such high conservation value. After the planning phase, students individually developed detailed design proposals responsive to their plans. From Metanoia, Zhang concentrated on wetland access and interpretation, proposing four focal places to form the nucleus of a wider pattern of connectivity, and to encourage community engagement with coastal environmental management and education. Jensen tackled the thorny issue of coastal urban development, proposing a sensitive staged eco-village model which maintains both ecological and recreational connectivity between the wetland and the marine environment. This project offered QUT’s partners many innovative options to inform their future planning. BSC, BMRG and Oceanwatch Australia are currently engaged in the investigation of on-ground opportunities drawing on these options.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Nitrogen is an important nutrient that can impact the quality of aquatic environments when present in high concentration. Even though low concentration levels of ammonium-nitrogen have been observed in laboratory studies in bioretention basins, poor removal or even the production of nitrate-nitrogen within the filter is often recorded in such studies. Ten Perspex biofilter columns of 94 mm (internal diameter) were packed with a filter layer, transition layer and a gravel layer. While the filter layer was packed to a height of 800 mm, transition and gravel layers were packed to a composite height of 220 mm and operated with simulated stormwater in the laboratory. The filter layer contained 8% organic material by weight. A free board of 350 mm provided detention storage and head to facilitate infiltration. The columns were operated with different antecedent dry days (0 d to 21 d) and constant inflow concentration at a feed rate of 100 mL/min. Samples were collected from the outflow at different time intervals, between 2 min and 150 min from the start of outflow, and were tested for nitrate-nitrogen and total organic carbon. Washoff of organic carbon from the filter layer was observed to occur for 30 min of outflow. This indicated washoff of organic carbon from the filter itself. At the same time, a very low concentration of nitrate-nitrogen was recorded at the beginning of the outflow, indicating the effective removal of nitrate-nitrogen. We conclude that the removal of nitrate-nitrogen is insignificant during the wetting phase of a rainfall event and the process of denitrification is more pronounced during the drying phase of a rainfall event. Thus intermittent wetting and drying is crucial for the removal of nitrate-nitrogen in bioretention basins.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Ripening period refers to a phase of stabilization in sand filters in water treatment systems that follows a new installation or cleaning of the filter. Intermittent wetting and drying, a unique property of stormwater biofilters, would similarly be subjected to a phase of stabilization. Suspended solids, is an important parameter that is often used to monitor the stabilization of sand filters in water treatment systems. Stormwater biofilters however, contain organic material that is added to the filter layer to enhance nitrate removal, the dynamics of which is seldom analysed in stabilization of stormwater biofilters. Therefore, in this study of stormwater biofiltration in addition to suspended solids (Turbidity), organic matter (TOC, DOC, TN and TKN) was also monitored as a parameter for stabilization of the stormwater biofilter. One Perspex bioretention column (94 mm internal diameter) was fabricated with filter layer that contained 8% organic material and fed with tapwater with different antecedent dry days (0 – 40 day) at 100 mL/min. Samples were collected from the outflow at different time intervals between 2 – 150 minutes and were tested for Total Organic Carbon, Dissolved Organic Carbon, Total Nitrogen, Total Kjeldhal Nitrogen and Turbidity. The column was observed to experience two phases of stabilization, one at the beginning of each event that lasted for 30 minutes while the other phase was observed across subsequent events that related to the age of filter.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

High concentrations of nitrate-nitrogen degrade the quality of aquatic environments. The primary mechanism by which nitrate-nitrogen is removed (denitrification) requires anoxic conditions and electron donors. While removal of total and ammonium-nitrogen is often high in stormwater biofilters, poor removal or even the release of nitrate-nitrogen in the outflow has often been observed. Five Perspex biofilter columns (94 mm internal diameter) were fabricated with a filter layer that contained 8% organic material. Columns were operated at 875  mm/h 875  mm/h and fed with simulated stormwater with different antecedent dry days (ADDs) and concentrations of nitrate-nitrogen. Samples were collected from the outflow at different time intervals between 2 and 150 min and were tested for nitrate-nitrogen. The removal of nitrate-nitrogen varied during an event from a high removal percentage (60–90%) in the initial outflow that gradually decreased in the first 30 min and settled at 0–15% removal thereafter. This remained consistent during all simulated events independent of the number of ADDs or inflow concentrations. ADDs and previous event feed concentrations affected the outflow nitrate-nitrogen concentration in the first 30 min of the current event. Therefore, from this study it is concluded that denitrification within stormwater biofilters occurs mainly during drying periods rather than wetting periods.