831 resultados para Australian JGOFS Projects

em Queensland University of Technology - ePrints Archive


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The green building trend has increased rapidly worldwide in recent decades as a means of addressing growing concerns over climate change and global warming and to reduce the impact of the building industry on the environment. A significant contribution in Australia is the use of a series of rating tools by the Green Building Council Australia (GBCA) for the certification of various types of buildings. This paper reviews the use of the Green Star system in Australian building construction, and investigates the potential challenges involved in acquiring the certification of Australian buildings by critically analysing a database of most recently certified GBCA projects. The results show that management-related credits and innovation-related credits are the easiest and most difficult respectively to obtain. Additionally, 6-Star green buildings achieve significantly higher points than other certified buildings in the Energy category. In contrast, 4 Star green buildings achieve more points in the Material category than 5 and 6 Star buildings. The study offers a useful reference for both property developers and project teams to obtain a better understanding of the rating scheme and consequently the effective preparation of certification documentation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is increasing momentum within the construction industry to deploy distributed teams on projects, yet the major challenges that companies face for managing teams in distributed arrangements have yet to be explored in the construction context. Driven by such need, this study is intended to present an account of the major challenges encountered throughout the life cycle of offshore outsourcing arrangements within the South Australian construction industry. To this end, the study describes the observations made within the natural contexts of one construction project in terms of the challenges to the success of deploying distributed teams for outsourcing of works. Discussions remain in dialogue with relevant theories and the pertinent literature to explain the interpretations and lessons learned and to underpin the conclusions made. It is contended that this study contributes to the field by providing an illuminating insight into potential challenges facing distributed teams being implemented in outsourcing tasks in construction projects. Discussions also offer practical guidelines for construction project managers and assist them in dealing with potential challenges of offshore outsourcing through the lenses of distributed team working principles.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Product innovation is an important contributor to the performance of infrastructure projects in the construction industry. Maximizing the potential for innovative product adoption is a challenging task due to the complexities of the construction innovation system. A qualitative methodology involving interviews with major construction project stakeholders is employed to address the research question: ‘What are the main obstacles to the adoption of innovative products in the road industry?’ The characteristics of six key product innovation obstacles in Australian road projects are described. The six key obstacles are: project goal misalignment, client pressures, weak contractual relations, lack of product trialling, inflexible product specifications and product liability concerns. A snapshot of the dynamics underlying these obstacles is provided. There are few such assessments in the literature, despite the imperative to improve construction innovation rates globally in order to deliver road infrastructure projects of increasing size and complexity. Key obstacles are interpreted through an open innovation construct, providing direction for policy to enhance the uptake of innovation across the construction product supply network. Early evidence suggests the usefulness of an open innovation construct that integrates three conceptual lenses: network governance, absorptive capacity and knowledge intermediation, in order to interpret product adoption obstacles in the context of Australian road infrastructure projects. The paper also provides practical advice and direction for government and industry organizations that wish to promote the flow of innovative product knowledge across the construction supply network.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose: To provide recommendations for construction clients who design and implement financial incentive mechanisms (FIMs) on projects. ---------- Methodology: Four large Australian building projects commissioned by government clients under managing contractor contracts and completed between 2001 and 2005 were examined to explore the ‘drivers’ that promoted motivation toward financial incentive goals. The results were triangulated across data sources, projects and stakeholder types. ---------- Findings: FIM design should incorporate: 1. flexibility to modify goals and measurement procedures over time, 2. multiple goals covering different project areas, 3. distribution of rewards across all the key organizations contributing to team performance (e.g. potentially not just the contractor, but the subcontractors and consultants) and a reward amount sufficient to be valued by potential recipients. FIM benefits are maximized through the following complementary procurement initiatives: 4. equitable contract risk allocation, 5. early contractor involvement in design, 6. value-driven tender selection, 7. relationship workshops, and 8. future work opportunities.---------- Research Limitations: This paper provides practical recommendations to industry and hence does not emphasize theoretical aspects.---------- Practical Implications: The uptake of these recommendations is likely to increase the impact of FIMs on motivation and improve project and industry outcomes. Although the study focuses on government clients of building projects, all the recommendations would seem to apply equally to private-sector clients and to non-building projects.---------- Originality: In order to improve motivation and reward high performance, clients are increasingly using FIM in their construction contracts. Despite the rising use of financial incentives, there is a lack of comprehensive construction-specific knowledge available to help clients maximize outcomes. The study addresses this gap in the literature.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This project was a step forward in developing an extension of the concept of constructability to include the post-occupancy stages of operation and maintenance. This was through an in-depth study of Australian health projects and interviews with professionals in the field. The thesis investigated how the operation and maintenance stakeholders can enter the initial planning, design and construction phases resulting in more efficient and effective delivery of infrastructure projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIM-compatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIMcompatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Community engagement is increasingly being employed by Australian organizations as a key strategy to incorporate representative community opinions into decision-making. This trend is reflected by Australian local and state governments legislating for community consultation in major infrastructure projects and the increasing role of public relations practitioners to manage these programs. This study explores community engagement founded on relational theory and proposed a typology of engagement employing a relational framework. An exploratory study of 20 Australian infrastructure projects with a mandatory consultation component is analyzed applying this framework. Results indicate little discrimination between the terms engagement, consultation, and participation; however, a range of tactics supported both collaborative and advocacy approaches. The implications for adopting a relational framework for community engagement programs are discussed.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

With increasing pressure to deliver environmentally friendly and socially responsible highway infrastructure projects, stakeholders are also putting significant focus on the early identification of financial viability and outcomes for these projects. Infrastructure development typically requires major capital input, which may cause serious financial constraints for investors. The push for sustainability has added new dimensions to the evaluation of highway projects, particularly on the cost front. Comprehensive analysis of the cost implications of implementing place sustainable measures in highway infrastructure throughout its lifespan is highly desirable and will become an essential part of the highway development process and a primary concern for decision makers. This paper discusses an ongoing research which seeks to identify cost elements and issues related to sustainable measures for highway infrastructure projects. Through life-cycle costing analysis (LCCA), financial implications of pursuing sustainability, which are highly concerned by the construction stakeholders, have been assessed to aid the decision making when contemplating the design, development and operation of highway infrastructure. An extensive literature review and evaluation of project reports from previous Australian highway projects was first conducted to reveal all potential cost elements. This provided the foundation for a questionnaire survey, which helped identify those specific issues and related costs that project stakeholders consider to be most critical in the Australian industry context. Through the survey, three key stakeholders in highway infrastructure development, namely consultants, contractors and government agencies, provided their views on the specific selection and priority ranking of the various categories. Findings of the survey are being integrated into proven LCCA models for further enhancement. A new LCCA model will be developed to assist the stakeholders to evaluate costs and investment decisions and reach optimum balance between financial viability and sustainability deliverables.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The increasing stock of aging office buildings will see a significant growth in retrofitting projects in Australian capital cities. Stakeholders of refitting works will also need to take on the sustainability challenge and realize tangible outcomes through project delivery. Traditionally, decision making for aged buildings, when facing the alternatives, is typically economically driven and on ad hoc basis. This leads to the tendency to either delay refitting for as long as possible thus causing building conditions to deteriorate, or simply demolish and rebuild with unjust financial burden. The technologies involved are often limited to typical strip-clean and repartition with dry walls and office cubicles. Changing business operational patterns, the efficiency of office space, and the demand on improved workplace environment, will need more innovative and intelligent approaches to refurbishing office buildings. For example, such projects may need to respond to political, social, environmental and financial implications. There is a need for the total consideration of buildings structural assessment, modeling of operating and maintenance costs, new architectural and engineering designs that maximise the utility of the existing structure and resulting productivity improvement, specific construction management procedures including procurement methods, work flow and scheduling and occupational health and safety. Recycling potential and conformance to codes may be other major issues. This paper introduces examples of Australian research projects which provided a more holistic approach to the decision making of refurbishing office space, using appropriate building technologies and products, assessment of residual service life, floor space optimisation and project procurement in order to bring about sustainable outcomes. The paper also discusses a specific case study on critical factors that influence key building components for these projects and issues for integrated decision support when dealing with the refurbishment, and indeed the “re-life”, of office buildings.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Public-private partnerships (PPPs) are increasingly used to procure Australian infrastructure projects. As with all construction projects, the early briefing stages are often the most crucial in determining a successful outcome. There is, however, a lack of systematic research on the type and nature of the critical factors affecting the effectiveness and efficiency of PPP during this period. A literature review is presented of PPP usage in Australia, in which four main categories of factors (procurement, stakeholder, risk, and finance) are identified, each with several subfactors. A questionnaire survey involving state government stakeholders is also described, and a mathematical model that ranks the factors involved is developed. This is followed by an examination of the potential of the factors to help improve the PPP briefing stage for both public and private sectors.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A key challenge for the 21st Century is to make our cities more liveable and foster economically sustainable, environmentally responsible, and socially inclusive communities. Design thinking, particularly a human-centred approach, offers a way to tackle this challenge. Findings from two recent Australian research projects highlight how facilitating sustainable, liveable communities in a humid sub-tropical environment requires an in-depth understanding of people’s perspectives, experiences and practices. Project 1 (‘Research House’) documents the reflections of a family who lived in a ‘test’ sustainable house for two years, outlining their experience and evaluations of universal design and sustainable technologies. The study family was very impressed with the natural lighting, natural ventilation, spaciousness and ease of access, which contributed significantly to their comfort and the liveability of their home. Project 2 (‘Inner-Urban High Density Living’) explored Brisbane residents’ opinions about high-density living, through a survey (n=636), interviews (n=24), site observations (over 300 hours) and environmental monitoring, assessing opinions on the liveability of their individual dwelling, the multi-unit host building and the surrounding neighbourhood. Nine areas, categorised into three general domains, were identified as essential for enhancing high density liveability. In terms of the dwelling, thermal comfort/ventilation, natural light, noise mitigation were important; shared space, good neighbour protocols, and support for environmentally sustainable behaviour were desired in the building/complex; and accessible/sustainable transport, amenities and services, sense of community were considered important in the surrounding neighbourhood. Combined, these findings emphasise the importance and complexity associated with designing liveable building, cities and communities, illustrating how adopting a design thinking, human-centred approach will help create sustainable communities that will meet the needs of current and future generations.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

For the last decade, one question has haunted me: what helps people to cope with large-scale organisational change in their workplace? This study explores the construct of personal change resilience, and its potential for identifying solutions to the problems of change fatigue and change resistance. The thesis has emerged from the fields of change management, leadership, training, mentoring, evaluation, management and trust within the context of higher education in Australia at the beginning of the twenty-first century. In this thesis I present a theoretical model of the factors to consider in increasing peoples’ personal change resilience as they navigate large-scale organisational change at work, thereby closing a gap in the literature on the construct of change resilience. The model presented is based on both the literature in the realms of business and education, and on the findings of the research. In this thesis, an autoethnographic case study of two Australian university projects is presented as one narrative, resulting in a methodological step forward in the use of multiple research participants’ stories in the development of a single narrative. The findings describe the experiences of workers in higher education and emphasise the importance of considerate management in the achievement of positive experiences of organisational change. This research makes a significant contribution to new knowledge in three ways. First, it closes a gap in the literature in the realm of change management around personal change resilience as a solution to the problem of change fatigue by presenting models of both change failure and personal change resilience. Second, it is methodologically innovative in the use of personae to tell the stories of multiple participants in one coherent tale presented as a work of ethnographic fiction seen through an autoethnographic lens. By doing so, it develops a methodology for giving a voice to those to whom change is done in the workplace. Third, it provides a perspective on organisational change management from the view of the actual workers affected by change, thereby adding to the literature that currently exists, which is based on the views of those with responsibility for leading or managing change rather than those it affects. This thesis is intended as a practical starting point for conversations by actual change managers in higher education, and it is written in such a way as to help them see how theory can be applied in real life, and how empowering and enabling the actual working staff members, and engaging with them in a considerate way before, during and even after the change process, can help to make them resilient enough to cope with the change, rather than leaving them burned out or disengaged and no longer a well-functioning member of the institution. This thesis shows how considerately managed large-scale organisational change can result in positive outcomes for both the organisation and the individuals who work in it.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Queensland University of Technology, together with the Royal Melbourne Institute of Technology, the Alliancing Association of Australia, and the Australian Research Council, have recently commenced a 3 year research project which aims to explore the ways in which value for money can be optimised using collaborative contracting during delivery of Australian infrastructure projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.