16 resultados para Aranda

em Queensland University of Technology - ePrints Archive


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The adoption of e-business by the Australian construction industry lags other service and product industries. It is assumed that slow adoption rate does not reflect the maturity of the technology but is due to adoption impediments peculiar to the nature of construction. This chapter examines impediments to the uptake of e-business nationally and internationally. A systematic and extensive literature search of impediments (also referred to as obstacles, impediments or hindrances) to adoption has been undertaken and the findings discussed in this chapter. This review included more that 200 documents and these have been published in a searchable database as part of a larger research initiative funded by the Cooperative Research Centre for Construction Innovation. The influence of levels of e-business maturity seen in other sectors such as retail, tourism and manufacturing was also captured and a number of major impediments were identified some including: privacy, trust, uncertainty of financial returns, lack of reliable measurement, fraud, lack of support and system maintenance. A total of 23 impediments were assessed in terms of impact to organisational type and size across reviewed documents. With this information it was possible to develop a reference framework for measuring maturity levels and readiness to uptake e-business in construction. Results have also shown that impediments to e-business adoption work differently according to organisational type and culture. Areas of training and people development need to be addressed. This would include a more sensitive approach to the nature of construction organisations, especially to those small and medium enterprises. Raising levels of awareness and creating trust for on-line collaboration are other aspects that need attention, which current studies confirm as lacking. An empirical study within construction, to validate these findings, forms the subsequent phase of this research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Designing and estimating civil concrete structures is a complex process which to many practitioners is tied to manual or semi-manual processes of 2D design and cannot be further improved by automated, interacting design-estimating processes. This paper presents a feasibility study for the development an automated estimator for concrete bridge design. The study offers a value proposition: an efficient automated model-based estimator can add value to the whole bridge design-estimating process, i.e., reducing estimation errors, shortening the duration of success estimates, and increasing the benefit of doing cost estimation when compared with the current practice. This is then followed by a description of what is in an efficient automated model-based estimator and how it should be used. Finally the process of model-based estimating is compared with the current practice to highlight the values embedded in the automated processes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The adoption of e-business by Small and Medium Enterprises (SMEs) in construction lags from other service and product businesses within the building sector. This paper develops a model to facilitate the uptake of electronic business, especially in relation to SMEs within the Australian construction sector. Ebusiness is defined here as “the undertaking of business-related transactions, communications and information exchanges utilising electronic medium and environment”, the elicited model highlights significant changes needed including skills development, social, economic and cultural issues. The model highlights barriers for SMEs to migrate towards e-transactions, e-bidding, e-tendering and ecollaboration and provides learning and skills development components. The model is derived from case study fieldwork and is to inform diffusion and awareness models for best practice. Empirical techniques included ‘focus group’ interviews and one to one ‘interviews’. Data was transcribed and analysed using cluster analyses. Preliminary results reveal that current models for e-business adoption are not effective within the construction context as they have emerged from other service and product industries - such as retail or tourism. These generic models have largely ignored the nature of the construction industry, and some modifications appears to be required. This paper proposes an alternative adoption model which is more sensitive to the nature of the industry – particularly for e-business uptake in building SME’s.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The adoption of e-business by the Australian construction industry lags other service and product industries. It is assumed that slow adoption rate does not reflect the maturity of the technology but is due to adoption barriers peculiar to the nature of construction. This paper examines impediments to the uptake of e-business nationally and internationally. A systematic and extensive literature search of barriers (also referred to as obstacles, impediments or hindrances) to adoption has been undertaken and the findings discussed in this paper. This review included more that 200 documents and these have been published in a searchable database as part of a larger research initiative funded by the Cooperative Research Centre for Construction Innovation. The influence of levels of e-business maturity seen in other sectors such as retail, tourism and manufacturing was also captured and a number of major barriers were identified some including: privacy, trust, uncertainty of financial returns, lack of reliable measurement, fraud, lack of support and system maintenance. A total of 23 barriers were assessed in terms of impact to organisational type and size across reviewed documents. With this information it was possible to develop a reference framework for measuring maturity levels and readiness to uptake e-business in construction. Results have also shown that barriers to e-business adoption work differently according to organisational type and culture. Areas of training and people development need to be addressed. This would include a more sensitive approach to the nature of construction organisations, especially to those small and medium enterprises. Raising levels of awareness and creating trust for on-line collaboration are other aspects that need attention, which current studies confirm as lacking. An empirical study within construction, to validate these findings, forms the subsequent phase of this research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIM-compatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIMcompatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background Despite evidence that up to 35% of patients with cancer experience significant distress, access to effective psychosocial care is limited by lack of systematic approaches to assessment, a paucity of psychosocial services, and patient reluctance to accept treatment either because of perceived stigma or difficulties with access to specialist psycho-oncology services due to isolation or disease burden. This paper presents an overview of a randomised study to evaluate the effectiveness of a brief tailored psychosocial Intervention delivered by health professionals in cancer care who undergo focused training and participate in clinical supervision. Methods/design Health professionals from the disciplines of nursing, occupational therapy, speech pathology, dietetics, physiotherapy or radiation therapy will participate in training to deliver the psychosocial Intervention focusing on core concepts of supportive-expressive, cognitive and dignity-conserving care. Health professional training will consist of completion of a self-directed manual and participation in a skills development session. Participating health professionals will be supported through structured clinical supervision whilst delivering the Intervention. In the stepped wedge design each of the 5 participating clinical sites will be allocated in random order from Control condition to Training then delivery of the Intervention. A total of 600 patients will be recruited across all sites. Based on level of distress or risk factors eligible patients will receive up to 4 sessions, each of up to 30 minutes in length, delivered face-to-face or by telephone. Participants will be assessed at baseline and 10-week follow-up. Patient outcome measures include anxiety and depression, quality of life, unmet psychological and supportive care needs. Health professional measures include psychological morbidity, stress and burnout. Process evaluation will be conducted to assess perceptions of participation in the study and the factors that may promote translation of learning into practice. Discussion This study will provide important information about the effectiveness of a brief tailored psychological Intervention for patients with cancer and the potential to prevent development of significant distress in patients considered at risk. It will yield data about the feasibility of this model of care in routine clinical practice and identify enablers and barriers to its systematic implementation in cancer settings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background: High levels of distress and need for self-care information by patients commencing chemotherapy suggest that current prechemotherapy education is suboptimal. We conducted a randomised, controlled trial of a prechemotherapy education intervention (ChemoEd) to assess impact on patient distress, treatment-related concerns, and the prevalence and severity of and bother caused by six chemotherapy side-effects. Patients and methods: One hundred and ninety-two breast, gastrointestinal, and haematologic cancer patients were recruited before the trial closing prematurely (original target 352). ChemoEd patients received a DVD, question-prompt list, self-care information, an education consultation ≥24 h before first treatment (intervention 1), telephone follow-up 48 h after first treatment (intervention 2), and a face-to-face review immediately before second treatment (intervention 3). Patient outcomes were measured at baseline (T1: pre-education) and immediately preceding treatment cycles 1 (T2) and 3 (T3). Results: ChemoEd did not significantly reduce patient distress. However, a significant decrease in sensory/psychological (P = 0.027) and procedural (P = 0.03) concerns, as well as prevalence and severity of and bother due to vomiting (all P = 0.001), were observed at T3. In addition, subgroup analysis of patients with elevated distress at T1 indicated a significant decrease (P = 0.035) at T2 but not at T3 (P = 0.055) in ChemoEd patients. Conclusions: ChemoEd holds promise to improve patient treatment-related concerns and some physical/psychological outcomes; however, further research is required on more diverse patient populations to ensure generalisability.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Over the past 40 years, the nature and scope of cancer nursing practice has been shaped to a large extent by scientific and medical advances, as well as by social, economic and political factors. Nurses’ role in cancer care has evolved from being predominantly functional and dependent in its approach to being a specialty with clearly defined standards of practice underpinned by a growing evidence base and an agreed set of professional performance capabilities. The unique contribution that nurses make to minimising the effects of cancer on a person’s life and improving the patient experience is now well established and Australian cancer nurses are recognised as leaders in the field internationally. Nurses have achieved improved outcomes for people affected by cancer as part of a multidisciplinary team. By being active participants in the Clinical Oncological Society of Australia for at least 30 of the organisation’s 40 year history, Australian cancer nurses have been provided unique opportunities for professional development and inter-professional collaboration. To meet future challenges in delivering quality cancer care, cancer nurses will need to be full partners with consumers and with other health professionals in redesigning health care systems that are more responsive to changes in social, demographic, scientific and technological contexts.

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador: