13 resultados para Anacostia Park (Washington, D.C.)--Maps.
em Queensland University of Technology - ePrints Archive
Resumo:
Young novice drivers are at considerable risk of injury and fatality, particularly when they first drive independently. Graduated Driver Licensing (GDL) has been introduced in numerous jurisdictions to allow more driving experience in conditions of reduced risk and increasing driving privileges over a longer duration. Queensland, Australia, enhanced GDL July 2007. Learners must record 100 hours in a logbook (10 hours at night) over 1 year, no mobile handsfree/loudspeaker by driver or any passenger. Provisional 1 (P1) drivers must not carry 2 or more peer passengers 11pm - 5am, no mobile handsfree/loudspeaker by any passenger. Self-reported compliance with new GDL and general road rules has not been examined.
Resumo:
The Texas Department of Transportation (TxDOT) is concerned about the widening gap between preservation needs and available funding. Funding levels are not adequate to meet the preservation needs of the roadway network; therefore projects listed in the 4-Year Pavement Management Plan must be ranked to determine which projects should be funded now and which can be postponed until a later year. Currently, each district uses locally developed methods to prioritize projects. These ranking methods have relied on less formal qualitative assessments based on engineers’ subjective judgment. It is important for TxDOT to have a 4-Year Pavement Management Plan that uses a transparent, rational project ranking process. The objective of this study is to develop a conceptual framework that describes the development of the 4-Year Pavement Management Plan. It can be largely divided into three Steps; 1) Network-Level project screening process, 2) Project-Level project ranking process, and 3) Economic Analysis. A rational pavement management procedure and a project ranking method accepted by districts and the TxDOT administration will maximize efficiency in budget allocations and will potentially help improve pavement condition. As a part of the implementation of the 4-Year Pavement Management Plan, the Network-Level Project Screening (NLPS) tool including the candidate project identification algorithm and the preliminary project ranking matrix was developed. The NLPS has been used by the Austin District Pavement Engineer (DPE) to evaluate PMIS (Pavement Management Information System) data and to prepare a preliminary list of candidate projects for further evaluation.
Resumo:
The trucking industry has played a significant role in the economic growth in Texas by transporting and distributing commodities using commercial motor vehicles. The Texas Department of Transportation (TxDOT), however, has recognized that the large number of overweight trucks operating on the state highway system has resulted in the deterioration of pavement condition. In addition, the permit fee to carry higher loads above legal limits is much lower than the cost to treat the increase in pavement damage. The primary purpose of the research presented in this paper is to investigate current TxDOT overweight permit structures to support pavement management. The research team analyzed the TxDOT “1547” Over-axle Weight Tolerance Permit structure to support an increase in the fee structure, bringing it more in line with the actual pavement damage. The analysis showed that the revised overweight permit structure could provide an additional $9.3 million annually for pavement maintenance needs by increasing current permit fees. These results were supported by the 2030 Committee for recommendation to the Texas Transportation Commission and consideration by the State Legislature [1]. The research team recommends conducting further research to identify methods for working cooperatively with the trucking industry to develop improved methods for assessing weight damage relationships and developing more effective and accurate means for assessing overweight permit fees.
Resumo:
This paper presents a road survey as part of a workshop conducted by the Texas Department of Transportation (TxDOT) to evaluate and improve the maintenance practices of the Texas highway system. Directors of maintenance from six peer states (California, Kansas, Georgia, Missouri, North Carolina, and Washington) were invited to this 3-day workshop. One of the important parts of this workshop was a Maintenance Test Section Survey (MTSS) to evaluate a number of pre-selected one-mile roadway sections. The workshop schedule allowed half a day to conduct the field survey and 34 sections were evaluated. Each of the evaluators was given a booklet and asked to rate the selected road sections. The goals of the MTSS were to: 1. Assess the threshold level at which maintenance activities are required as perceived by the evaluators from the peer states; 2. Assess the threshold level at which maintenance activities are required as perceived by evaluators from other TxDOT districts; and 3. Perform a pilot evaluation of the MTSS concept. This paper summarizes the information obtained from survey and discusses the major findings based on a statistical analysis of the data and comments from the survey participants.
Resumo:
To assess and improve their practices, and thus ensure the future excellence of the Texas highway system, the Texas Department of Transportation (TxDOT) sought a forum in which experts from other State Departments of Transportation could evaluate the TxDOT maintenance program and practices based on their expertise. To meet this need, a Peer State Review of TxDOT Maintenance Practices project was organized and conducted by the Center for Transportation Research (CTR) at The University of Texas at Austin. CTR researchers, along with TxDOT staff, conducted a workshop to present TxDOT’s maintenance practices to the visiting peer reviewers and invite their feedback. Directors of maintenance from six different states—California, Kansas, Georgia, Missouri, North Carolina, and Washington—participated in the workshop. CTR and TxDOT worked together to design a questionnaire with 15 key questions to capture the peers’ opinions on maintenance program and practices. This paper compiles and summarizes this information. The examination results suggested that TxDOT should use a more state-wide approach to funding and planning, in addition to funding and planning for each district separately. Additionally, the peers recommended that criteria such as condition and level of service of the roadways be given greater weight in the funding allocation than lane miles or vehicle miles traveled (VMT). The Peer Reviewers also determined that TxDOT maintenance employee experience and communications were strong assets. Additional strengths included the willingness of TxDOT to invite peer reviews of their practices and a willingness to consider opportunities for improvement.
Resumo:
The focus of governments on increasing active travel has motivated renewed interest in cycling safety. Bicyclists are up to 20 times more likely to be involved in serious injury crashes than drivers so understanding the relationship among factors in bicyclist crash risk is critically important for identifying effective policy tools, for informing bicycle infrastructure investments, and for identifying high risk bicycling contexts. This study aims to better understand the complex relationships between bicyclist self reported injuries resulting from crashes (e.g. hitting a car) and non-crashes (e.g. spraining an ankle) and perceived risk of cycling as a function of cyclist exposure, rider conspicuity, riding environment, rider risk aversion, and rider ability. Self reported data from 2,500 Queensland cyclists are used to estimate a series of seemingly unrelated regressions to examine the relationships among factors. The major findings suggest that perceived risk does not appear to influence injury rates, nor do injury rates influence perceived risks of cycling. Riders who perceive cycling as risky tend not to be commuters, do not engage in group riding, tend to always wear mandatory helmets and front lights, and lower their perception of risk by increasing days per week of riding and by increasing riding proportion on bicycle paths. Riders who always wear helmets have lower crash injury risk. Increasing the number of days per week riding tends to decrease both crash injury and non crash injury risk (e.g. a sprain). Further work is needed to replicate some of the findings in this study.
Resumo:
Potential to strengthen a commitment to intervene within a friendship group: – all knew the other passengers, – 3 in 4 discussed intervening with other passengers, – expectations of friends was a key predictive factor. - young women have potential and willingness to intervene in their friends’ drink driving behaviour - majority of campaigns and strategies to reduce alcohol related crashes target the driver however it is arguable that some strategies should target the young female passenger.
Resumo:
INTRODUCTION • Public bicycle share schemes have emerged as a method of increasing rates of bicycle riding. • The overwhelming majority of schemes have begun since 2005, taking advantage of various tracking and payment technologies making short term rental practical and affordable. • Very little research has been undertaken to determine their potentially broad impact on transport behaviour and consequently, it is difficult to understand the performance of these schemes in terms of reduced emissions and congestion, as well as possible increases in physical activity.
Resumo:
Deterministic transit capacity analysis applies to planning, design and operational management of urban transit systems. The Transit Capacity and Quality of Service Manual (1) and Vuchic (2, 3) enable transit performance to be quantified and assessed using transit capacity and productive capacity. This paper further defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures the transit task performed over distance. Passenger transmission (p-km/h) captures the passenger task delivered by service at speed. Transit productiveness (p-km/h) captures transit work performed over time. These measures are useful to operators in understanding their services’ or systems’ capabilities and passenger quality of service. This paper accounts for variability in utilized demand by passengers along a line and high passenger load conditions where passenger pass-up delay occurs. A hypothetical case study of an individual bus service’s operation demonstrates the usefulness of passenger transmission in comparing existing and growth scenarios. A hypothetical case study of a bus line’s operation during a peak hour window demonstrates the theory’s usefulness in examining the contribution of individual services to line productive performance. Scenarios may be assessed using this theory to benchmark or compare lines and segments, conditions, or consider improvements.
Resumo:
Transit Capacity Analysis critical to urban system Planning Design, Operation Productive Performance Analysis not so well detailed This study extends TRB’s & Vuchic’s work in this area
Resumo:
Road trauma is a leading cause of child injury worldwide and in highly motorised countries, injury as a passenger represents a major proportion of all child road deaths and hospitalisations. Australia is no exception, particularly since motorised transport to school is at high levels in most Australian states. Recently the legislation governing the type of car restraints required for children aged under 7 years has changed in most Australian states aligning requirements better with accepted best practice. However, it is unclear what effect these changes have had on children’s seating positions or the types of restraints used. A mixed methods evaluation of the impact of the new legislation on compliance was conducted at three times: baseline (Time 1); after announcement that changes were going to be implemented but before enforcement began (Time 2); and after enforcement commenced (Time 3). Measures of compliance were obtained using two methods: road-side observations of vehicles with child passengers; and parental self-report (intercept interviews conducted at Time 2 and Time 3 only). Results from the observations suggested an overall positive effect. Proportions of children occupying front seats decreased overall and use of dedicated child seas increased to almost 40% of the observed children by Time 3. However, almost a quarter of the children observed were still occupying the front seat. These results were very different from those of the interview study where almost no children were reported as usually travelling in the front seat, and the reported use of dedicated restraints with children was almost 90%, more than twice that in the observations.
Resumo:
While the philosophical motivation behind Civil Infrastructure Management Systems is to achieve optimal level of service at a minimum cost, the allocation of scarce resources among competing alternatives is still a matter of debate. It appears to be widely accepted that results from tradeoff analysis can be measured by the degree of accomplishment of the objectives. Road management systems not only deal with different asset types but also with conflicting objectives. This paper presents a case study of lifecycle optimization with tradeoff analysis for a road corridor in New Brunswick. Objectives of the study included condition of bridge and roads and road safety. A road safety index was created based on potential for improvement. Road condition was based on roughness, rutting and cracking. Initial results show lack of sustainability in bridge performance. Therefore, bridges where broken by components: deck, superstructure and substructure. Visual inspections, in addition to construction age of each bridge, were combined to generate a surrogate apparent age. Two life cycle analysis were conducted; one aimed to minimize overall cost while achieving sustainable results and another one purely for optimization. -used to identify required levels of budget. Such analyses were used to identify the minimum required budget and to demonstrate that with the same amount of money it was possible to achieve better levels of performance. Dominance and performance driven criteria were combined to identify and select an optimal result. It was found that achievement of optimally sustained results is conditioned by the availability of treatments for all asset classes at across their life spans. For the case study a disaggregated bridge condition index was introduced to the original algorithm to attempt to achieve sustainability in all bridges components, however lack of early stage treatments for substructures produce declining trends for such a component.
Resumo:
This paper describes a thorough thermal study on a fleet of DC traction motors which were found to suffer from overheating after 3 years of full operation. Overheating of these traction motors is attributed partly because of the higher than expected number of starts and stops between train terminals. Another probable cause of overheating is the design of the traction motor and/or its control strategy. According to the motor manufacturer, a current shunt is permanently connected across the motor field winding. Hence, some of the armature current is bypassed into the current shunt. The motor then runs above its rated speed in the field weakening mode. In this study, a finite difference model has been developed to simulate the temperature profile at different parts inside the traction motor. In order to validate the simulation result, an empty vehicle loaded with drums of water was also used to simulate the full pay-load of a light rail vehicle experimentally. The authors report that the simulation results agree reasonably well with experimental data, and it is likely that the armature of the traction motor will run cooler if its field shunt is disconnected at low speeds