339 resultados para 010 Bibliografías

em Queensland University of Technology - ePrints Archive


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This series of research vignettes is aimed at sharing current and interesting research findings from our team and other international Entrepreneurship researchers. In this vignette, Professor Per Davidsson considers some of the dynamics associated with firm growth.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this work, ab initio density functional calculations were performed to explore the effect of surface lithium vacancies on the initial dehydrogenation kinetics of lithium borohydride. We found that some B−H bonds in neighboring BH4-1 complexes around the vacancy became elongated (weakened). The activation barriers for the recombination of H atoms to form H2 were decreased from 3.64 eV for the stoichiometrically complete LiBH4(010) surface to 1.53 and 0.23 eV in the presence of mono- and di-vacancies, respectively. Our results indicate that the creation of Li vacancies may play a critical role in accelerating the dehydrogenation kinetics of LiBH4.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Hand hygiene is critical in the healthcare setting and it is believed that methicillin-resistant Staphylococcus aureus (MRSA), for example, is transmitted from patient to patient largely via the hands of health professionals. A study has been carried out at a large teaching hospital to estimate how often the gloves of a healthcare worker are contaminated with MRSA after contact with a colonized patient. The effectiveness of handwashing procedures to decontaminate the health professionals' hands was also investigated, together with how well different healthcare professional groups complied with handwashing procedures. The study showed that about 17% (9–25%) of contacts between a healthcare worker and a MRSA-colonized patient results in transmission of MRSA from a patient to the gloves of a healthcare worker. Different health professional groups have different rates of compliance with infection control procedures. Non-contact staff (cleaners, food services) had the shortest handwashing times. In this study, glove use compliance rates were 75% or above in all healthcare worker groups except doctors whose compliance was only 27%.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The information on climate variations is essential for the research of many subjects, such as the performance of buildings and agricultural production. However, recorded meteorological data are often incomplete. There may be a limited number of locations recorded, while the number of recorded climatic variables and the time intervals can also be inadequate. Therefore, the hourly data of key weather parameters as required by many building simulation programmes are typically not readily available. To overcome this gap in measured information, several empirical methods and weather data generators have been developed. They generally employ statistical analysis techniques to model the variations of individual climatic variables, while the possible interactions between different weather parameters are largely ignored. Based on a statistical analysis of 10 years historical hourly climatic data over all capital cities in Australia, this paper reports on the finding of strong correlations between several specific weather variables. It is found that there are strong linear correlations between the hourly variations of global solar irradiation (GSI) and dry bulb temperature (DBT), and between the hourly variations of DBT and relative humidity (RH). With an increase in GSI, DBT would generally increase, while the RH tends to decrease. However, no such a clear correlation can be found between the DBT and atmospheric pressure (P), and between the DBT and wind speed. These findings will be useful for the research and practice in building performance simulation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We investigate the potential for the third-order aberrations coma and trefoil to provide a signed cue to accommodation. It is first demonstrated theoretically (with some assumptions) that the point spread function is insensitive to the sign of spherical defocus in the presence of odd-order aberrations. In an experimental investigation, the accommodation response to a sinusoidal change in vergence (1–3 D, 0.2 Hz) of a monochromatic stimulus was obtained with a dynamic infrared optometer. Measurements were obtained in 10 young visually normal individuals with and without custom contact lenses that induced low and high values of r.m.s. trefoil (0.25, 1.03 μm) and coma (0.34, 0.94 μm). Despite variation between subjects, we did not find any statistically significant increase or decrease in the accommodative gain for low levels of trefoil and coma, although effects approached or reached significance for the high levels of trefoil and coma. Theoretical and experimental results indicate that the presence of Zernike third-order aberrations on the eye does not seem to play a crucial role in the dynamics of the accommodation response.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This document provides a review of international and national practices in investment decision support tools in road asset management. Efforts were concentrated on identifying analytic frameworks, evaluation methodologies and criteria adopted by current tools. Emphasis was also given to how current approaches support Triple Bottom Line decision-making. Benefit Cost Analysis and Multiple Criteria Analysis are principle methodologies in supporting decision-making in Road Asset Management. The complexity of the applications shows significant differences in international practices. There is continuing discussion amongst practitioners and researchers regarding to which one is more appropriate in supporting decision-making. It is suggested that the two approaches should be regarded as complementary instead of competitive means. Multiple Criteria Analysis may be particularly helpful in early stages of project development, say strategic planning. Benefit Cost Analysis is used most widely for project prioritisation and selecting the final project from amongst a set of alternatives. Benefit Cost Analysis approach is useful tool for investment decision-making from an economic perspective. An extension of the approach, which includes social and environmental externalities, is currently used in supporting Triple Bottom Line decision-making in the road sector. However, efforts should be given to several issues in the applications. First of all, there is a need to reach a degree of commonality on considering social and environmental externalities, which may be achieved by aggregating the best practices. At different decision-making level, the detail of consideration of the externalities should be different. It is intended to develop a generic framework to coordinate the range of existing practices. The standard framework will also be helpful in reducing double counting, which appears in some current practices. Cautions should also be given to the methods of determining the value of social and environmental externalities. A number of methods, such as market price, resource costs and Willingness to Pay, are found in the review. The use of unreasonable monetisation methods in some cases has discredited Benefit Cost Analysis in the eyes of decision makers and the public. Some social externalities, such as employment and regional economic impacts, are generally omitted in current practices. This is due to the lack of information and credible models. It may be appropriate to consider these externalities in qualitative forms in a Multiple Criteria Analysis. Consensus has been reached in considering noise and air pollution in international practices. However, Australia practices generally omitted these externalities. Equity is an important consideration in Road Asset Management. The considerations are either between regions, or social groups, such as income, age, gender, disable, etc. In current practice, there is not a well developed quantitative measure for equity issues. More research is needed to target this issue. Although Multiple Criteria Analysis has been used for decades, there is not a generally accepted framework in the choice of modelling methods and various externalities. The result is that different analysts are unlikely to reach consistent conclusions about a policy measure. In current practices, some favour using methods which are able to prioritise alternatives, such as Goal Programming, Goal Achievement Matrix, Analytic Hierarchy Process. The others just present various impacts to decision-makers to characterise the projects. Weighting and scoring system are critical in most Multiple Criteria Analysis. However, the processes of assessing weights and scores were criticised as highly arbitrary and subjective. It is essential that the process should be as transparent as possible. Obtaining weights and scores by consulting local communities is a common practice, but is likely to result in bias towards local interests. Interactive approach has the advantage in helping decision-makers elaborating their preferences. However, computation burden may result in lose of interests of decision-makers during the solution process of a large-scale problem, say a large state road network. Current practices tend to use cardinal or ordinal scales in measure in non-monetised externalities. Distorted valuations can occur where variables measured in physical units, are converted to scales. For example, decibels of noise converts to a scale of -4 to +4 with a linear transformation, the difference between 3 and 4 represents a far greater increase in discomfort to people than the increase from 0 to 1. It is suggested to assign different weights to individual score. Due to overlapped goals, the problem of double counting also appears in some of Multiple Criteria Analysis. The situation can be improved by carefully selecting and defining investment goals and criteria. Other issues, such as the treatment of time effect, incorporating risk and uncertainty, have been given scant attention in current practices. This report suggested establishing a common analytic framework to deal with these issues.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The aim of this project is to develop a systematic investment decision-making framework for infrastructure asset management by incorporation economic justification, social and environmental consideration in the decision-making process. This project assesses the factors that are expected to provide significant impacts on the variability of expenditures. A procedure for assessing risk and reliability for project investment appraisals will be developed. The project investigates public perception, social and environmental impacts on road infrastructure investment. This research will contribute to the debate about how important social and environmental issues should be incorporated into the investment decision-making process for infrastructure asset management.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This document provides the findings of an international review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different countries and international organisations. Road assets are powerful drivers of economic development and social equity. They also have significant impacts on the natural and man-made environment. The traditional definition of asset management is “A systematic process of maintaining, upgrading and operating physical assets cost effectively. It combines engineering principles with sound business practices and economic theory and it provides tools to facilitate a more organised, logical approach to decision-making” (US Dept. of Transportation, 1999). In recent years, the concept has been broadened to cover the complexity of decision making, based on a wider variety of policy considerations as well as social and environmental issues rather than is covered by Benefit-Cost analysis and pure technical considerations. Current international practices are summarised in table 2. It was evident that Engineering-economic analysis methods are well advanced to support decision-making. A range of tools available supports performance predicting of road assets and associated cost/benefit in technical context. The need for considering triple plus one bottom line of social, environmental and economic as well as political factors in decision-making is well understood by road agencies around the world. The techniques used to incorporate these however, are limited. Most countries adopt a scoring method, a goal achievement matrix or information collected from surveys. The greater uncertainty associated with these non-quantitative factors has generally not been taken into consideration. There is a gap between the capacities of the decision-making support systems and the requirements from decision-makers to make more rational and transparent decisions. The challenges faced in developing an integrated decision making framework are both procedural and conceptual. In operational terms, the framework should be easy to be understood and employed. In philosophical terms, the framework should be able to deal with challenging issues, such as uncertainty, time frame, network effects, model changes, while integrating cost and non-cost values into the evaluation. The choice of evaluation techniques depends on the feature of the problem at hand, on the aims of the analysis, and on the underlying information base At different management levels, the complexity in considering social, environmental, economic and political factor in decision-making is different. At higher the strategic planning level, more non-cost factors are involved. The complexity also varies based on the scope of the investment proposals. Road agencies traditionally place less emphasis on evaluation of maintenance works. In some cases, social equity, safety, environmental issues have been used in maintenance project selection. However, there is not a common base for the applications.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Both in developed and developing economies, major public funding is invested in civil infrastructure assets. Efficiency and comfort level of expected and demanded living standards are largely dependant on the management strategies of these assets. Buildings are one of the major & vital assets, which need to be maintained primarily to ensure its functionality by effective & efficient delivery of services and to optimize economic benefits. Not withstanding, public building infrastructure is not considered in Infrastructure report card published by Australian Infrastructure Report Card Alliance Partners (2001). The reason appears to be not having enough data to rate public building infrastructure. American Infrastructure Report Card (2001) gave “School Buildings” ‘d-’ rating, which is below ‘poor’. For effective asset management of building infrastructure, a need emerged to optimise the budget for managing assets, to cope up with increased user expectations, to response effectively to possible asset failures, to deal with ageing of assets and aging populations and to treat other scenarios including technology advancement and non-asset solutions. John (Asset Management, 2001) suggests that in the area of asset management worldwide, UK, Australia and New Zealand are leading.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This document provides the findings of a national review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different sate road authorities. The investment objectives of Australian road authorities are based on triple-bottom line considerations (social, environmental, economic and political). In some cases, comparing with some social considerations, such as regional economic development, equity, and access to pubic service etc., Benefit-Cost Ratio has limited influence on the decision-making. Australian road authorities have developed various decision support tools. Although Multi-Criteria Analysis has been preliminarily used in case by case study, pavement management systems, which are primarily based on Benefit Cost Analysis, are still the main decision support tool. This situation is not compatible with the triple-bottom line objectives. There is need to fill the gap between decision support tools and decision-making itself. Different decision criteria should be adopted based on the contents of the work. Additional decision criteria, which are able to address social, environmental and political impacts, are needed to develop or identify. Environmental issue plays a more and more important role in decision-making. However, the criteria and respective weights in decision-making process are yet to be clearly identified. Social and political impacts resulted from road infrastructure investment can be identified through Community Perceptions Survey. With accumulative data, prediction models, which are similar as pavement performance models, can be established. Using these models, the decision-makers are able to foresee the social and political consequences of investment alternatives.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the final report of project 2002-010 Component Life – A Delphi Approach to Life Prediction of Building Material Components. A Delphi survey has been conducted to provide expert opinion on the life of components in buildings. Thirty different components were surveyed with a range of materials, coatings, environments and failure considered. These components were chosen to be representative of a wider range of components in the same building microclimate. The survey included both service life (with and without maintenance) and aesthetic life, and time to first maintenance. It included marine, industrial, and benign environments, and covered both commercial and residential buildings. In order to obtain answers to this wide range of question, but still have a survey that could be completed in a reasonable time, the survey was broken into five sections: 1 External metal components – residential buildings. 2. Internal metal components – residential buildings. 3. External metal components – commercial buildings. 4. Internal metal components – commercial buildings. 5. Metal connectors in buildings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Queensland Department of Main Roads, Australia, spends approximately A$ 1 billion annually for road infrastructure asset management. To effectively manage road infrastructure, firstly road agencies not only need to optimise the expenditure for data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. This paper presents the results of case studies in using the probability-based method for an integrated approach (i.e. assessing optimal costs of pavement strength data collection; calibrating deterioration prediction models that suit local condition and assessing risk-adjusted budget estimates for road maintenance and rehabilitation for assessing life-cycle budget estimates). The probability concept is opening the path to having the means to predict life-cycle maintenance and rehabilitation budget estimates that have a known probability of success (e.g. produce budget estimates for a project life-cycle cost with 5% probability of exceeding). The paper also presents a conceptual decision-making framework in the form of risk mapping in which the life-cycle budget/cost investment could be considered in conjunction with social, environmental and political issues.