923 resultados para recommendation system


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report presents the demonstration of software agents prototype system for improving maintenance management [AIMM] including: • Developing and implementing a user focused approach for mining the maintenance data of buildings. This report presents the demonstration of software agents prototype system for improving maintenance management [AIMM] including: • Developing and implementing a user focused approach for mining the maintenance data of buildings. • Refining the development of a multi agent system for data mining in virtual environments (Active Worlds) by developing and implementing a filtering agent on the results obtained from applying data mining techniques on the maintenance data. • Integrating the filtering agent within the multi agents system in an interactive networked multi-user 3D virtual environment. • Populating maintenance data and discovering new rules of knowledge.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports the initial steps of research on planning of rural networks for MV and LV. In this paper, two different cases are studied. In the first case, 100 loads are distributed uniformly on a 100 km transmission line in a distribution network and in the second case, the load structure become closer to the rural situation. In case 2, 21 loads are located in a distribution system so that their distance is increasing, distance between load 1 and 2 is 3 km, between 2 and 3 is 6 km, etc). These two models to some extent represent the distribution system in urban and rural areas, respectively. The objective function for the design of the optimal system consists of three main parts: cost of transformers, and MV and LV conductors. The bus voltage is expressed as a constraint and should be maintained within a standard level, rising or falling by no more than 5%.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An earlier CRC-CI project on ‘automatic estimating’ (AE) has shown the key benefit of model-based design methodologies in building design and construction to be the provision of timely quantitative cost evaluations. Furthermore, using AE during design improves design options, and results in improved design turn-around times, better design quality and/or lower costs. However, AEs for civil engineering structures do not exist; and research partners in the CRC-CI expressed interest in exploring the development of such a process. This document reports on these investigations. The central objective of the study was to evaluate the benefits and costs of developing an AE for concrete civil engineering works. By studying existing documents and through interviews with design engineers, contractors and estimators, we have established that current civil engineering practices (mainly roads/bridges) do not use model-based planning/design. Drawings are executed in 2D and only completed at the end of lengthy planning/design project management lifecycle stages. We have also determined that estimating plays two important, but different roles. The first is part of project management (which we have called macro level estimating). Estimating in this domain sets project budgets, controls quality delivery and contains costs. The second role is estimating during planning/design (micro level estimating). The difference between the two roles is that the former is performed at the end of various lifecycle stages, whereas the latter is performed at any suitable time during planning/design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A plethora of methods for procuring building projects are available to meet the needs of clients. Deciding what method to use for a given project is a difficult and challenging task as a client’s objectives and priorities need to marry with the selected method so as to improve the likelihood of the project being procured successfully. The decision as to what procurement system to use should be made as early as possible and underpinned by the client’s business case for the project. The risks and how they can potentially affect the client’s business should also be considered. In this report, the need for client’s to develop a procurement strategy, which outlines the key means by which the objectives of the project are to be achieved is emphasised. Once a client has established a business case for a project, appointed a principal advisor, determined their requirements and brief, then consideration as to which procurement method to be adopted should be made. An understanding of the characteristics of various procurement options is required before a recommendation can be made to a client. Procurement systems can be categorised as traditional, design and construct, management and collaborative. The characteristics of these systems along with the procurement methods commonly used are described. The main advantages and disadvantages, and circumstances under which a system could be considered applicable for a given project are also identified.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Deficiencies in the design and operation of office buildings can give rise to high social, environmental and economic (triple bottom line) costs. As a result, there are significant pressures and incentives to develop ‘smart building’ technologies that can facilitate improved indoor environment quality (IEQ), and more energy efficient operation of office buildings. IEQ indicators include lighting, ventilation, thermal comfort, indoor air quality and noise. In response to this, the CRC for Construction Innovation commissioned a six-month scoping study (Project no. 2002-043) to examine how different technologies could be used to improve the ‘triple bottom line’ for office buildings. The study was supported by three industry partners, Bovis Lend Lease, Arup, and The Queensland Department of Public Works. The objective of the study was to look at the history, trends, drivers, new technologies and potential application areas related to the operation of healthy and efficient office buildings. The key output from the study was a recommendation for a prototype system for intelligent monitoring and control of an office environment, based on identified market, technical and user requirements and constraints.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The project has further developed two programs for the industry partners related to service life prediction and salt deposition. The program for Queensland Department of Main Roads which predicts salt deposition on different bridge structures at any point in Queensland has been further refined by looking at more variables. It was found that the height of the bridge significantly affects the salt deposition levels only when very close to the coast. However the effect of natural cleaning of salt by rainfall was incorporated into the program. The user interface allows selection of a location in Queensland, followed by a bridge component. The program then predicts the annual salt deposition rate and rates the likely severity of the environment. The service life prediction program for the Queensland Department of Public Works has been expanded to include 10 common building components, in a variety of environments. Data mining procedures have been used to develop the program and increase the usefulness of the application. A Query Based Learning System (QBLS) has been developed which is based on a data-centric model with extensions to provide support for user interaction. The program is based on number of sources of information about the service life of building components. These include the Delphi survey, the CSIRO Holistic model and a school survey. During the project, the Holistic model was modified for each building component and databases generated for the locations of all Queensland schools. Experiments were carried out to verify and provide parameters for the modelling. These included instrumentation of a downpipe, measurements on pH and chloride levels in leaf litter, EIS measurements and chromate leaching from Colorbond materials and dose tests to measure corrosion rates of new materials. A further database was also generated for inclusion in the program through a large school survey. Over 30 schools in a range of environments from tropical coastal to temperate inland were visited and the condition of the building components rated on a scale of 0-5. The data was analysed and used to calculate an average service life for each component/material combination in the environments, where sufficient examples were available.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Introduction: Paramedics and other emergency health workers are exposed to infectious disease particularly when undertaking exposure-prone procedures as a component of their everyday practice. This study examined paramedic knowledge of infectious disease aetiology and transmission in the pre-hospital care environment.--------- Methods: A mail survey of paramedics from an Australian ambulance service (n=2274) was conducted.--------- Results: With a response rate of 55.3% (1258/2274), the study demonstrated that paramedic knowledge of infectious disease aetiology and modes of transmission was poor. Of the 25 infectious diseases included in the survey, only three aetiological agents were correctly identified by at least 80% of respondents. The most accurate responses for aetiology of individual infectious diseases were for HIV/AIDS (91.4%), influenza (87.4%), and hepatitis B (85.7%). Poorest results were observed for pertussis, infectious mononucleosis, leprosy, dengue fever, Japanese B encephalitis and vancomycin resistant enterococcus (VRE), all with less than half the sample providing a correct response. Modes of transmission of significant infectious diseases were also assessed. Most accurate responses were found for HIV/AIDS (85.8%), salmonella (81.9%) and influenza (80.1%). Poorest results were observed for infectious mononucleosis, diphtheria, shigella, Japanese B encephalitis, vancomycin resistant enterococcus, meningococcal meningitis, rubella and infectious mononucleosis, with less than a third of the sample providing a correct response.--------- Conclusions: Results suggest that knowledge of aetiology and transmission of infectious disease is generally poor amongst paramedics. A comprehensive in-service education infection control programs for paramedics with emphasis on infectious disease aetiology and transmission is recommended.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Real-World Data Mining Applications generally do not end up with the creation of the models. The use of the model is the final purpose especially in prediction tasks. The problem arises when the model is built based on much more information than that the user can provide in using the model. As a result, the performance of model reduces drastically due to many missing attributes values. This paper develops a new learning system framework, called as User Query Based Learning System (UQBLS), for building data mining models best suitable for users use. We demonstrate its deployment in a real-world application of the lifetime prediction of metallic components in buildings

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper deals with the problem of using the data mining models in a real-world situation where the user can not provide all the inputs with which the predictive model is built. A learning system framework, Query Based Learning System (QBLS), is developed for improving the performance of the predictive models in practice where not all inputs are available for querying to the system. The automatic feature selection algorithm called Query Based Feature Selection (QBFS) is developed for selecting features to obtain a balance between the relative minimum subset of features and the relative maximum classification accuracy. Performance of the QBLS system and the QBFS algorithm is successfully demonstrated with a real-world application

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is evidence that many heating, ventilating & air conditioning (HVAC) systems, installed in larger buildings, have more capacity than is ever required to keep the occupants comfortable. This paper explores the reasons why this can occur, by examining a typical brief/design/documentation process. Over-sized HVAC systems cost more to install and operate and may not be able to control thermal comfort as well as a “right-sized” system. These impacts are evaluated, where data exists. Finally, some suggestions are developed to minimise both the extent of, and the negative impacts of, HVAC system over-sizing, for example: • Challenge “rules of thumb” and/or brief requirements which may be out of date. • Conduct an accurate load estimate, using AIRAH design data, specific to project location, and then resist the temptation to apply “safety factors • Use a load estimation program that accounts for thermal storage and diversification of peak loads for each zone and air handling system. • Select chiller sizes and staged or variable speed pumps and fans to ensure good part load performance. • Allow for unknown future tenancies by designing flexibility into the system, not by over-sizing. For example, generous sizing of distribution pipework and ductwork will allow available capacity to be redistributed. • Provide an auxiliary tenant condenser water loop to handle high load areas. • Consider using an Integrated Design Process, build an integrated load and energy use simulation model and test different operational scenarios • Use comprehensive Life Cycle Cost analysis for selection of the most optimal design solutions. This paper is an interim report on the findings of CRC-CI project 2002-051-B, Right-Sizing HVAC Systems, which is due for completion in January 2006.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports on a study to measure the effectiveness of an integrated learning system (ILS) in improving mathematics achievement for low achieving Year 5 to 9 students. The study found that statistically significant gains on the integrated learning system were not supported by scores on standardised mathematics achievement tests. It also found that although student attitudes to computers decreased (significantly for some items), the students still liked the integrated learning system and felt that it had helped them to learn.