242 resultados para musculoskeletal risks
Resumo:
A plethora of methods for procuring building projects are available to meet the needs of clients. Deciding what method to use for a given project is a difficult and challenging task as a client’s objectives and priorities need to marry with the selected method so as to improve the likelihood of the project being procured successfully. The decision as to what procurement system to use should be made as early as possible and underpinned by the client’s business case for the project. The risks and how they can potentially affect the client’s business should also be considered. In this report, the need for client’s to develop a procurement strategy, which outlines the key means by which the objectives of the project are to be achieved is emphasised. Once a client has established a business case for a project, appointed a principal advisor, determined their requirements and brief, then consideration as to which procurement method to be adopted should be made. An understanding of the characteristics of various procurement options is required before a recommendation can be made to a client. Procurement systems can be categorised as traditional, design and construct, management and collaborative. The characteristics of these systems along with the procurement methods commonly used are described. The main advantages and disadvantages, and circumstances under which a system could be considered applicable for a given project are also identified.
Resumo:
Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.
Resumo:
Digital forensics relates to the investigation of a crime or other suspect behaviour using digital evidence. Previous work has dealt with the forensic reconstruction of computer-based activity on single hosts, but with the additional complexity involved with a distributed environment, a Web services-centric approach is required. A framework for this type of forensic examination needs to allow for the reconstruction of transactions spanning multiple hosts, platforms and applications. A tool implementing such an approach could be used by an investigator to identify scenarios of Web services being misused, exploited, or otherwise compromised. This information could be used to redesign Web services in order to mitigate identified risks. This paper explores the requirements of a framework for performing effective forensic examinations in a Web services environment. This framework will be necessary in order to develop forensic tools and techniques for use in service oriented architectures.
Resumo:
Road safety education is not just about safe driving. Best practice road safety education seeks to improve knowledge and change attitudes relating to being safe, and making sure others are safe on the road. Typical topics might include: • Strengthening attitudes toward safe road use behaviours and avoiding risks • Supporting behaviours to ensure others are safe • Promoting knowledge of traffic rules.
Resumo:
Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.
Resumo:
Background: Although low back pain (LBP) is an important issue for the health profession, few studies have examined LBP among occupational therapy students. Purpose. To investigate the prevalence and distribution of LBP, its adverse sequelae; and to identify potential risk factors.----------- Methods: In 2005, a self-reported questionnaire was administered to occupational therapy students in Northern Queensland.----------- Findings: The 12-month period-prevalence of LBP was 64.6%. Nearly half (46.9%) had experienced pain for over 2 days, 38.8% suffered LBP that affected their daily lives, and 24.5% had sought medical treatment. The prevalence of LBP ranged from 45.5 to 77.1% (p=0.004), while the prevalence of LBP symptoms persisting longer than two days was 34.1 to 62.5% (p=0.020). Logistic regression analysis indicated that year of study and weekly computer usage were statistically-significant LBP risk factors.----------- Implications: The occupational therapy profession will need to further investigate the high prevalence of student LBP identified in this study.
Resumo:
Purpose – The purpose of this paper is to provide a practicable systems-based approach to knowledge management (KM) in a project environment, to encourage organisations to unlock the value in their review processes. It relies on knowledge capture and storage at decision review points, to enrich individual, team and organisational learning during the project life cycle. The project's phases are typically represented horizontally with deliverables (objectives) or project "promises" as the desirable outcomes. The purpose of this paper is to give expression through introducing a vertical dimension to facilitate the KM process. A model is proposed that conceptualises project-specific knowledge drawing on and feeding into the organisation's knowledge management system (KMS) at tactical and strategic levels. Design/methodology/approach – This conceptual paper links concepts from systems theory with KM, to produce a model to identify, collate, and optimise project-based knowledge and integrate it into the management process. Findings – The application of the system theory approach enriches the knowledge generated by a project, and feeds it into the next phase of that project. At the same time, it contributes to the individual's and project team's KM, specifies possible courses of action, together with risks, costs and benefits and thus it expands the organisation's higher level KMS. Research limitations/implications – The concept suggests that the knowledge capture, storage and sharing process may best be undertaken holistically, in view of the systems relationships between the tasks. Systems theory structures this process. Research opportunities include studying the interfaces between levels of KM, in relation to the project's progress. Practical implications – Reconceptualisation of the project as a knowledge creation process may improve the project's progress as well as add to the individual's, project team's, and wider organisation's knowledge base. An example is given. Originality/value – This paper illuminates the broader potential of under-utilised opportunities in well-known management approaches to add dimension to the business project, of knowledge creation, storage and sharing.
Resumo:
A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.
Resumo:
LCADesign software package is a real-time environmental impact calculator for commercial property that works directly from the building designer's model. It enables developers, building designers, architects, engineers, builders, manufacturers and government bodies to optimise the eco-impact of a building as the design model evolves instead of waiting months for expert analysis. By integrating with the Building Information Models (BIMs) generated by 3D computer-aided drafting, LCADesign builds eco-efficiency into the design stage and measures the environmental values and risks of materials in commercial buildings
Resumo:
The over represented number of novice drivers involved in crashes is alarming. Driver training is one of the interventions aimed at mitigating the number of crashes that involve young drivers. To our knowledge, Advanced Driver Assistance Systems (ADAS) have never been comprehensively used in designing an intelligent driver training system. Currently, there is a need to develop and evaluate ADAS that could assess driving competencies. The aim is to develop an unsupervised system called Intelligent Driver Training System (IDTS) that analyzes crash risks in a given driving situation. In order to design a comprehensive IDTS, data is collected from the Driver, Vehicle and Environment (DVE), synchronized and analyzed. The first implementation phase of this intelligent driver training system deals with synchronizing multiple variables acquired from DVE. RTMaps is used to collect and synchronize data like GPS, vehicle dynamics and driver head movement. After the data synchronization, maneuvers are segmented out as right turn, left turn and overtake. Each maneuver is composed of several individual tasks that are necessary to be performed in a sequential manner. This paper focuses on turn maneuvers. Some of the tasks required in the analysis of ‘turn’ maneuver are: detect the start and end of the turn, detect the indicator status change, check if the indicator was turned on within a safe distance and check the lane keeping during the turn maneuver. This paper proposes a fusion and analysis of heterogeneous data, mainly involved in driving, to determine the risk factor of particular maneuvers within the drive. It also explains the segmentation and risk analysis of the turn maneuver in a drive.
Resumo:
This study examined the tone and content of 107 political, satirical cartoons images published in the popular culture forum of mainstream newspapers. The cartoons illustrated the reform of the industrial relations system in Australia in 2005 and 2006. The images were conveyed in a moderate tone. That is, they were more about poking fun at and questioning authority and power, rather than simply describing the issues on one hand, or demonstrating any revolutionary fervor on the other. The cartoons’ content represented many of the concerns and issues being voiced by employer groups, government, opposition, unions and the media at the time. Themes likely to evoke a strong response from the readership included the importance of a collective response in voicing opposition to the legislation and enacting change, the risks to fundamental working conditions, the stealth and dogma associated with the rollout of the changes and the increasing disparity in wealth and power between employers and workers. The images were an important part of the wider discourse and a mechanism which helped place industrial relations squarely in the minds of working Australians.
Resumo:
Background: Injury is the leading cause of mortality for young people in Australia (AIHW, 2008). Adolescent injury mortality is consistently associated with risk taking behaviour, including transport and interpersonal violence (AIHW, 2003), which often occurs in the context of alcohol and other substance use. A rapid increase in risk taking and injury through early to late adolescence highlights the need for effective school based interventions. Aim: The aim of the current research was to examine the relationship between school connectedness and adolescent risk and injury, in order to inform effective prevention approaches. School connectedness, or students’ feelings of belongingness to school, has been shown to be a critical protective factor in adolescence which can be targeted effectively through teacher interventions. Despite evidence linking low school connectedness with increased health risk behaviour, including substance use and violence, research has not yet addressed possible links between connectedness and a broader range of risk taking behaviours (e.g. transport risks) or injury. Method: This study involved background data collection to inform the development of an intervention. A total of 595 Year 9 students (aged 13-14 years) from 5 Southeast Queensland high schools completed questionnaires that included measures of school connectedness, risk taking behaviour, alcohol and other substance use, and injuries. Results: Increased school connectedness was found to be associated with fewer transport risk behaviours and with decreased alcohol and other substance use for both males and females. Similarly, increased school connectedness was associated with fewer passenger and motorcycle injuries for male participants. Both males and females with increased school connectedness reported fewer alcohol related injuries. Implications: These results indicate that school connectedness appears to have protective effects for early adolescence. These findings may also hold for older adolescents and indicate that it may be an important factor to target in school based risk and injury prevention programs. A school connectedness intervention is currently being designed, focusing on teacher professional development. The intervention will be implemented in conjunction with a curriculum based injury prevention program for Year 9 students and will be evaluated through a large scale cluster randomised trial involving 26 schools.
Resumo:
The climatic conditions of tropical and subtropical regions within Australia present, at times, extreme risk of physical activity induced heat illness. Many administrators and teachers in school settings are aware of the general risks of heat related illness. In the absence of reliable information applied at the local level, there is a risk that inappropriate decisions may be made concerning school events that incorporate opportunities to be physically active. Such events may be prematurely cancelled resulting in the loss of necessary time for physical activity. Under high or extremely high risk conditions however, the absence of appropriate modifications or continuation could place the health of students, staff and other parties at risk. School staff and other key stakeholders should understand the mechanisms of escalating risk and be supported to undertake action to reduce the level of risk through appropriate policies, procedures, resources and action plans.
Resumo:
The Body Mass Index (BMI) has been used worldwide as an indicator of fatness. However, the universal cut-off points by the World Health Organisation (WHO) classification may not be appropriate for every ethnic group when consider the relationship with their actual total body fatness(%BF). The application of population-specific classifications to assess BMI may be more relevant to public health. Ethnic differences in the BMI%BF relationship between 45 Japanese and 42 Australian-Caucasian males were assessed using whole body dual-energy X-ray absorptiometry (DXA) scan and anthropometry using a standard protocol. Japanese males had significantly (p<0.05) greater %BF at given BMI values than Australian males. When this is taken into account the newly proposed Asia-Pacific BMI classification of BMI 23 as overweight and 25 as obese may better assess the level of obesity that is associated increased health risks for this population. To clarify the current findings, further studies that compare the relationships across other Japanese populations are recommended.
Resumo:
Objective: The aim of this paper was to examine self-efficacy and perceived appropriateness among rural general practitioners (GPs) in regards to screening and intervention for physical, lifestyle and mental health issues. ----- Method: Fifty GPs from 25 practices in eight rural Queensland towns completed a written survey designed for the study. ----- Results: General practitioners rated opportunistic screening or assessment for smoking and for detection of relapse of mental disorders as the most appropriate, with even cardiovascular and diabetes risk falling behind these. Self-efficacy was highest for medical disorders for smoking assessment. It was significantly lower for alcohol, mental health issues, and addressing risks of physical disorder in people with mental disorders. ----- Conclusions: High appropriateness ratings suggest that current strategies to boost self-efficacy of GPs in addressing mental health issues are timely.