219 resultados para OPM3 (Organizational Project Management Model Maturity)
Resumo:
A considerable amount of research has confirmed the relationship between organizational culture and knowledge sharing behaviours. However, less research has been conducted on the impact of project sub-cultures in relation to the sharing of knowledge between projects, particularly in project based organizations (PBOs). The unique structures and contexts characterized by PBOs indicate the need to investigate further the impact of cultures present within PBOs and their effect on knowledge sharing. We report on a rich case study of four large Australian-based PBOs whereby the cultural values of these large organizations were seen to impact significantly on whether project teams were more or less likely to improve inter-project knowledge sharing. Furthermore, this research demonstrates the utility of using Cameron and Quinn's (2005) Competing Values Framework to evaluate culture in the context of PBOs
Resumo:
There is a worldwide demand for an increasingly sustainable built environment. This has resulted in the need for a more accurate evaluation of the level of sustainability of construction projects. To do this it involves the development of better measurement and benchmarking methods. One approach is to use a theoretical model to assess construction projects in terms of their sustainable development value (SDV) and sustainable development ability (SDA) for implementation in the project life cycle, where SDA measures the contribution of a project to development sustainability and as a major criterion for assessing its feasibility. This paper develops an improved SDA prototype model that incorporates the effects of dynamical factors on project sustainability. This involves the introduction of two major factors concerning technological advancement and changes in people's perceptions. A case study is used to demonstrate the procedures involved in simulation and modeling, one outcome of which is to demonstrate the greater influence of technological advancement on project sustainability than changes in perception.
Resumo:
Previous research on construction innovation has commonly recognized the importance of the organizational climate and key individuals, often called “champions,” for the success of innovation. However, it rarely focuses on the role of participants at the project level and addresses the dynamics of construction innovation. This paper therefore presents a dynamic innovation model that has been developed using the concept of system dynamics. The model incorporates the influence of several individual and situational factors and highlights two critical elements that drive construction innovations: (1) normative pressure created by project managers through their championing behavior, and (2) instrumental motivation of team members facilitated by a supportive organizational climate. The model is qualified empirically, using the results of a survey of project managers and their project team members working for general contractors in Singapore, by assessing casual relationships for key model variables. Finally, the paper discusses the implications of the model structure for fostering construction innovations.
Resumo:
Participant performance is critical to the success of projects. At the same time, enhancing the satisfaction of participants not only helps in problem solving but also improves their motivation and cooperation. However, previous research related to participant satisfaction is primarily concerned with clients and customers and relatively little attention has been paid to contractors. This paper investigates how the performance of project participants affects contractor project satisfaction in terms of the client's clarity of objectives (OC) and promptness of payments (PP), designer carefulness (DC), construction risk management (RM), the effectiveness their contribution (EW) and mutual respect and trust (RT). With 125 valid responses from contractors in Malaysia, a contractor satisfaction model is developed based on structural equation modelling. The results demonstrate the necessity for dividing abstract satisfaction into two dimensions, comprising economic-related satisfaction (ES) and production-related satisfaction (PS), with DC, OC, PP and RM having significant effects on ES, while DC, OC, EW and RM influence PS. In addition, the model tests the indirect effects of these performance variables on ES and PS. In particular, OC indirectly affects ES and PS through mediation of RM and DC respectively. The results also provide opportunities for improving contractor satisfaction and supplementing the contractor selection criteria for clients.
Resumo:
While entrepreneurship research has taken firm formation to be the predominant mode of opportunity exploitation, entrepreneurship can take place through many other types of organizational arrangements. In the present article, we consider one such alternative arrangement, namely the formation of inter-organizational projects (IOPs). We propose a multi-level contingency model that suggests that uncertainty both at the level of the firm and at the level of the environment makes the exploitation of opportunities through IOPs more likely. The model is tested by telephone survey data collected amongst a panel of 1725 SMEs and longitudinal industry data. Our findings provide strong support for the industry-level part of the model, but interestingly, only partial support for the firm level part of the model. This indicates that the effects of uncertainty need to be dissected into different levels of analysis to understand the conditions under which alternative modes of opportunity exploitation can be a prominent entrepreneurial alternative to new firm formation.
Resumo:
This paper conceptualizes knowledge governance (KG) in project-based organizations (PBOs) and its methodological approaches for empirical investigation. Three key contributions towards a multi-faceted view of KG and an understanding of KG in PBOs are advanced. These contributions include a definition of KG in PBOs, a conceptual framework to investigate KG and a methodological framework for empirical inquiry into KG in PBO settings. Our definition highlights the contingent nature of KG processes in relation to their organizational context. The conceptual framework addresses macro- and micro-level elements of KG and their interaction. The methodological framework proposes five different research approaches, structured by differentiation and integration of various ontological and epistemological stances. Together these contributions provide a novel platform for understanding KG in PBOs and developing new insights into the design and execution of research on KG within PBOs.
Rating defence major project success : the role of personal attributes and stakeholder relationships
Resumo:
In this paper we develop and test a model of the associations between major project managers' personal attributes and project success in the context of the Australian Defence industry. In our model, emotional intelligence, cognitive flexibility and systemic thinking were hypothesised to relate to project success, mediated by internal and external stakeholder relationships. The model was tested in an online survey with 373 major project managers. Emotional intelligence and cognitive flexibility were found to be related to the development, quality and effectiveness of major project managers' relationships with both internal and external stakeholders; and these in turn were associated with their ratings of project success. Systemic thinking, however, had no relationship with either stakeholder relationships or project success. Additional research is needed to examine the contribution of a wider range of personal attributes to stakeholder relationships and project success, and to assess whether this model is applicable in other industries and types of projects.
Resumo:
This paper conceptualizes and defines knowledge governance (KG) in project-based organizations (PBOs). Two key contributions towards a multi-faceted view of KG and an understanding of KG in PBOs are advanced, as distinguished from knowledge management and organizational learning concepts. The conceptual framework addresses macro- and micro-level elements of KG and their interaction. Our definition of KG in PBOs highlights the contingent nature of KG processes in relation to their organizational context. These contributions provide a novel platform for understanding KG in PBOs.
Resumo:
Many activities, from disaster response to project management, require cooperation among people from multiple organizations who initially lack interpersonal relationships and trust. Upon entering inter-organizational settings, pre-existing identities and expectations, along with emergent social roles and structures, may all influence trust between colleagues. To sort out these effects, we collected time-lagged data from three cohorts of military MBA students, representing 2,224 directed dyads, shortly after they entered graduate school. Dyads that shared organizational identity, boundary-spanning roles, and similar network positions (structural equivalence) were likely to have stronger professional ties and greater trust.
Resumo:
This thesis identifies attributes, skills and behaviours that major project managers require for stakeholder relationships competence and project success within a major project environment. It develops valid and reliable measures of internal and external stakeholder relationships competence, tests a complex conceptual model and explores the effectiveness of the QUT Executive Masters of Complex Project Management and Strategic Procurement in developing major project managers' stakeholder relationships competence. Implications of this thesis are for government and industry in identifying factors associated with major project success, as this will lead to better major project outcomes potentially resulting in time and monetary savings of years and billions of dollars.
Resumo:
The ineffectiveness of current design processes has been well studied and has resulted in widespread calls for the evolution and development of new management processes. Even following the advent of BIM, we continue to move from one stage to another without necessarily having resolved all the issues. CAD design technology, if well handled, could have significantly raised the level of quality and efficiency of current processes, but in practice this was not fully realized. Therefore, technology alone can´t solve all the problems and the advent of BIM could result in a similar bottleneck. For a precise definition of the problem to be solved we should start by understanding what are the main current bottlenecks that have yet to be overcome by either new technologies or management processes, and the impact of human behaviour-related issues which impact the adoption and utilization of new technologies. The fragmented and dispersed nature of the AEC sector, and the huge number of small organizations that comprise it, are a major limiting factor. Several authors have addressed this issue and more recently IDDS has been defined as the highest level of achievement. However, what is written on IDDS shows an extremely ideal situation on a state to be achieved; it shows a holistic utopian proposition with the intent to create the research agenda to move towards that state. Key to IDDS is the framing of a new management model which should address the problems associated with key aspects: technology, processes, policies and people. One of the primary areas to be further studied is the process of collaborative work and understanding, together with the development of proposals to overcome the many cultural barriers that currently exist and impede the advance of new management methods. The purpose of this paper is to define and delimit problems to be solved so that it is possible to implement a new management model for a collaborative design process.
Resumo:
Although integrated marketing communication (IMC) has progressed towards midrange maturity level, its full-scale adoption has been impeded by a lack of consensus on its defining constructs. The purpose of this study is to move from abstraction to define the construct of strategic integration (SI) and develop this into a management tool, thus making an important contribution to both the theory and practice of IMC. Drawing from both IMC and strategic management literature, the construct of SI is operationalised into a number of key factors and a well-cited management model, Fuchs’ ‘integration valuator’ is explored as the starting point of a measurement tool for IMC. To do this, a Delphi study invites the scrutiny of an expert panel of world-leading IMC researchers and practitioners. The panel validated the model construction process,redefined overarching constructs and key factors with a high degree of consensus, supported a process measure, suggested a weighted evaluation measure and recognised the importance of developing such a measure. They delivered clear and consistent imperatives guiding model development. The result is a measure of SI that evaluates organisational proficiency and diagnoses the integration of IMC campaigns. It also advances theory by providing a better understanding of the construct of SI.
Resumo:
MOST PAN stages in Australian factories use only five or six batch pans for the high grade massecuite production and operate these in a fairly rigid repeating production schedule. It is common that some of the pans are of large dropping capacity e.g. 150 to 240 t. Because of the relatively small number and large sizes of the pans, steam consumption varies widely through the schedule, often by ±30% about the mean value. Large fluctuations in steam consumption have implications for the steam generation/condensate management of the factory and the evaporators when bleed vapour is used. One of the objectives of a project to develop a supervisory control system for a pan stage is to (a) reduce the average steam consumption and (b) reduce the variation in the steam consumption. The operation of each of the high grade pans within the schedule at Macknade Mill was analysed to determine the idle (or buffer) time, time allocations for essential but unproductive operations (e.g. pan turn round, charging, slow ramping up of steam rates on pan start etc.), and productive time i.e. the time during boil-on of liquor and molasses feed. Empirical models were developed for each high grade pan on the stage to define the interdependence of the production rate and the evaporation rate for the different phases of each pan’s cycle. The data were analysed in a spreadsheet model to try to reduce and smooth the total steam consumption. This paper reports on the methodology developed in the model and the results of the investigations for the pan stage at Macknade Mill. It was found that the operation of the schedule severely restricted the ability to reduce the average steam consumption and smooth the steam flows. While longer cycle times provide increased flexibility the steam consumption profile was changed only slightly. The ability to cut massecuite on the run among pans, or the use of a high grade seed vessel, would assist in reducing the average steam consumption and the magnitude of the variations in steam flow.
Resumo:
ROBERT EVAPORATORS in Australian sugar factories are traditionally constructed with 44.45 mm outside diameter stainless steel tubes of ~2 m length for all stages of evaporation. There are a few vessels with longer tubes (up to 2.8 m) and smaller and larger diameters (38.1 and 50.8 mm). Queensland University of Technology is undertaking a study to investigate the heat transfer performance of tubes of different lengths and diameters for the whole range of process conditions typically encountered in the evaporator set. Incorporation of these results into practical evaporator designs requires an understanding of the cost implications for constructing evaporator vessels with calandrias having tubes of different dimensions. Cost savings are expected for tubes of smaller diameter and longer length in terms of material, labour and installation costs in the factory. However these savings must be considered in terms of the heat transfer area requirements for the evaporation duty, which will likely be a function of the tube dimensions. In this paper a capital cost model is described which provides a relative cost of constructing and installing Robert evaporators of the same heating surface area but with different tube dimensions. Evaporators of 2000, 3000, 4000 and 5000 m2 are investigated. This model will be used in conjunction with the heat transfer efficiency data (when available) to determine the optimum tube dimensions for a new evaporator at a specified evaporation duty. Consideration is also given to other factors such as juice residence time (and implications for sucrose degradation and control) and droplet de-entrainment in evaporators of different tube dimensions.
Resumo:
The aim of this paper is to aid researchers in undertaking action research within industry with a particular focus on the study of design-led innovation. This paper presents the research design of a case study shaped to solve real world problems concerning a major Australian Airport Corporation by bridging the chasm between academia and industry. The researcher’s role is one of design-innovation catalyst, facilitating the integration of design as a new strategic capability and innovation approach within an organisation’s fabric. A discussion of the researcher experience within industry will provide evidence on the challenges facing such a research role, with strategies for overcoming these barriers presented. Based on the authors’ experience as a researcher within industry and reflection within practice, a project progression model for action research is presented to enable the improved management of industry based research.