241 resultados para Multinational Contractors
Resumo:
Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.
Resumo:
Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.
Resumo:
This paper discusses the level of effectiveness of quality principles and quality management system implementation and the relationship with performance of ISO9000 certified Indonesian contractors. It also discusses the statistical relationship between quality management systems (QMSs) and key performance indicators (KPIs) amongst a large sample of Indonesian construction companies. Data collected is from questionnaire surveys involving Quality Managers, Managers, and Project and Site Engineers representing 77 different companies. Results indicate that even though some contractors have not yet effectively implemented an effective QMS, most of the KPIs of respondent companies are still at the level of high performance. The statistical results show that the relationship between variables of ISO9000 QMS principles and contractors’ KPIs is significant. These results suggest that an increment in the implementation level of QMS principles can increase KPIs, however that much effort is still required for Indonesian contractors to fully effectively implement QMS principles and thus substantially improve performance against KPIs.
Resumo:
Fundamental studies on constructability issue done in United States, United Kingdom and Australia illustrate capability of this concept to affect overall objectives of construction projects. It can result in significant cost and time savings and improved final quality by consideration of construction contractors experiences during conceptual planning and design phases. As intensive as these studies are, they do not attempt to investigate importance of these activities in order to find each of their specific barriers separately. This research explores Constructability Activities (CAs) in all project phases separately based on amount of contractors involvement in each activity and also amount of gap that exists between target and actual effects of each activity on achieving the final objectives of building projects in Malaysia. It ends to development of Critical Constructability Activities (CCAs). This research is crucial to gaining a better understanding of CCAs which are caused based on contractors higher participation percentage and larger gaps between their target and actual effects on achieving the final aims of the project. This research highlights the need to overcome barriers of CAs implementation in building projects. This study recommends construction stakeholders to concentrate more on CCAs in order to achieve the overall objectives of the project much faster and easier.
Resumo:
Australia is currently in the midst of a major resources boom. Resultant growing demands for labour in regional and remote areas have accelerated the recruitment of non resident workers, mostly contractors, who work extended block rosters of 12-hour shifts and are accommodated in work camps, often adjacent to established mining towns. Serious social impacts of these practices, including violence and crime, have generally escaped industry, government and academic scrutiny. This paper highlights some of these impacts on affected regional communities and workers and argues that post-industrial mining regimes serve to mask and privatize these harms and risks, shifting them on to workers, families and communities.
Resumo:
Traditional pedagogies in the arts in higher education focus largely on the studio experience in which a novice artist studies under one or more master teachers (e.g., Don, Garvey, & Sadeghpour, 2009). In more recent times, however, a shift in higher education curriculum and pedagogy in the arts has expanded this traditional conservatory model of training to include, among other components, career self-management and enterprise creation—in a word, entrepreneurship.This chapter examines the developing field of arts enterprise and arts entrepreneurship in higher education in a multinational context. The field is contextualized within the broader landscape of the creative industries and the consequential development of knowledge, skills, and the habits of mind necessary for artistic venture creation, sustainability, and success. Whereas the discourse about learning and teaching for business entrepreneurship is well established (e.g., Fiet, 2001), equivalent conversations about arts enterprise and entrepreneurship have only recently begun (Beckman, 2007, 2011; Essig, 2009). This chapter will address the contested definitions of key terms and concepts and also the question of how arts educators, although mindful of the pedagogic traditions of the arts school, are also drawing on the pedagogies of business entrepreneurship and cognitive theories of entrepreneurship to create innovative new transdisciplinary signature pedagogies for creative enterprise and entrepreneurship education in the arts.
Resumo:
The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.
Resumo:
Purpose-- DB clients play a vital role in the delivery of DB system and the clients’ competences are critical to the success of DB projects. Most of DB clients, however, remain inexperienced with the DB system. This study, therefore, aims to identify the key competences that DB clients should possess to ensure the success of DB projects in the construction market of China. Design/Methodology/Approach -- Five semi-structured face-to-face interviews and two rounds Delphi questionnaire survey were conducted in the construction market of China to identify the key competences of DB clients. Rankings have been assigned to these key competences on the basis of their relative importance. Findings-- Six ranked key competences of DB clients have been identified, which are, namely, (1) the ability to clearly define project scope and objectives; (2) financial capacity for the projects; (3) capacity in contract management; (4) adequate staff or consulting team; (5) effective coordination with DB contractors and (6) experience with similar design-build projects. Calculation of Kendall’s Coefficient of Concordance (W) indicates a statistically significant consensus of panel experts on these top six key competences. Practical implications—Clients should clearly understand the competence requirements in DB projects and should assess their DB capability before going for the DB option. Originality/Value-- The examination of DB client’s key competences will help the client deepen the understanding of the DB system. DB clients can also make use of the research findings as guidelines to improve their DB competence.
Resumo:
Design-Build (DB) system has been widely adopted overseas but it has not received the same popularity yet in the People’s Republic of China. The selection of design-build variant is regarded as one of the critical obstacles to the application of this alternative. This paper investigates categories of design-build variants in the construction market of China. The develop-and-construction, enhanced design-build, traditional-design-build and engineering procurement-construction (EPC) are the four current designbuild variants adopted by clients. Each of them is developed to meet a varying set of circumstances and has its own advantages and disadvantages. The develop-and-construction is mostly used in large, complex projects in housing industry and it will guarantee client’s great control over the project while still leave some design room for the contractor. The traditional-design-build and enhanced-design-build systems are mostly applied in projects that are comparatively simple, small-scale, and the DB contractors will have greater control of the projects. The EPC is the extension of pure design-build method and is widely adopted in the petrochemical, metallurgical and electronic fields because of the high-technique requirements and the necessity for one entity to control the design, construction, procurement and commissioning etc. Four corresponding design-build projects are also presented in this paper in order to better illustrate the operational process and provide the insight for understanding the design-build variants in Mainland China.
Resumo:
The design-build system has been demonstrated as an effective delivery method and gained popularity worldwide. Although there are an increasing number of clients adopting DB method in China, most of them remain inexperienced with method. The objective of this study is therefore to identify the key competences that a client or its consultant should possess to ensure the success of DB projects. Face-to-face interviews and a two-round Delphi questionnaire survey were conducted to find the following six key competences of clients, which include the (1) ability to clearly articulate project scope and objectives; (2) financial capacity for DB projects; (3) capability in contract management; (4) adequate staff or consulting team; (5) effective coordination with contractors and (6) experience with similar DB projects. This study will hopefully provide clients with measures to evaluate their DB competence and further promote their understanding of DB system in the PRC.
Resumo:
This report discusses findings of a case study into "CADD, BIM and IPD" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. This case study investigated the evolution that has taken place in the Queensland Department of Public Works Division of Project Services during the last 20 years from: the initial implementation of computer aided design and documentation(CADD); to the experimentation with building information modelling (BIM) from the mid 2000’s; embedding integrated practice (IP); to current steps towards integrated project delivery (IPD) with the integration of contractors in the design/delivery process. This case study should be read in conjunction with Part 1 of this suite of reports.
Resumo:
The current transfer pricing rules contained in Australia’s taxation regime are designed to counter the underpayment of tax by businesses engaged in international related-party dealings. Currently, these transactions must take place at an arm’s length price, a requirement which is becoming increasingly difficult to demonstrate. This results in an increased risk of an audit by the Australian Taxation Office. If a taxpayer wishes to avoid the risk of an audit, and any ensuing penalties, there is one option: an advance pricing arrangement (‘APA’). An APA is an agreement whereby the future transfer pricing methodology to be used to determine the arm’s length price is agreed to by the taxpayer and the relevant tax authority or authorities. This article investigates the use of APAs as a solution to the problem of transfer pricing and considers their impact on stakeholders. It is argued that while APAs provide a valuable practical tool for multinational entities facing the challenges of the taxation of global trading under the current regime, they may not be a practical long term solution.
Resumo:
Evidence from the infrastructure and building sectors suggests issues of drugs and alcohol and its association with safety risk on construction sites. While most Australian jurisdictions have identified this as a critical safety issue, information is limited regarding the prevalence of alcohol and other drugs in the workplace and there is limited evidential guidance on how to effectively and efficiently address such an issue. A nationally consistent collaborative approach across the construction workforce - involving employers and employees; clients, unions; contractors and sub-contractors is required to engender a cultural change in the construction workforce – in a similar manner to the on-going initiative in securing a cultural change to drink-driving in our society where peer intervention and support is encouraged. A study to address these issues has three key objectives. Firstly, using the standard World Health Organisation Alcohol Use Disorders Identification Test (AUDIT), and a wide ranging set of structured interviews, a national qualitative and quantitative assessment of the use of drugs and alcohol is being undertaken. Secondly, the development of an appropriate industry policy with an adoption of an educative and rehabilitative approach is planned in consultation with employers and employees across the infrastructure and building sectors, with an aim of national adoption. Finally, an industry-specific cultural change management program will be developed through a nationally collaborative approach to reducing the risk of impaired performance on construction sites and increasing workers’ commitment to drugs and alcohol safety. The study outcomes stand to benefit not only occupational health and safety, through a greater understanding of the safety impacts of alcohol and other drugs at work, but also alcohol and drug use as a wider community health issue. This presentation will provide an analysis and discussion of the data collected in objective 1 and how the final results will inform the subsequent phases of the study.
Resumo:
Australia’s domestic income tax legislation and double tax agreements contain transfer pricing rules which are designed to counter the underpayment of tax by businesses engaged in international dealings between related parties. The current legislation and agreements require that related party transactions take place at a value which reflects an arm’s length price, that is, a price which would be charged between unrelated parties. For a host of reasons, it is increasingly difficult for multinational entities to demonstrate that they are transferring goods and services at a price which is reflective of the behaviour of independent parties, thereby making it difficult to demonstrate compliance with the relevant legislation. Further, where an Australian business undertakes cross-border related party transactions there is the risk of an audit by the Australian Tax Office (ATO). If a business wishes to avoid the risk of an audit, and any ensuing penalties, there is one option: an advance pricing arrangement (APA). An APA is an agreement whereby the future transfer pricing methodology to be used to determine the arm’s length price is agreed to by the taxpayer and the relevant tax authority or authorities. The ATO views the APA process as an important part of its international tax strategy and believes that there are complementary benefits provided to both the taxpayer and the ATO. The ATO promotes the APA process on the basis of creating greater certainty for all parties while reducing compliance costs and the risk of audit and penalty. While the ATO regards the APA system as a success, it may be argued that the implementation of such a system is simply a practical solution to an ongoing problem of an inherent failure in both the legislation and ATO interpretation and application of this legislation to provide certainty to the taxpayer. This paper investigates the use of APAs as a solution to the problem of transfer pricing and considers whether they are the success the ATO claims. It is argued that there is no doubt that APAs provide a valuable practical tool for multinational entities facing the challenges of the taxation of global trading under the current transfer pricing regime. It does not, however, provide a long term solution. Rather, the long term solution may be in the form of legislative amendment.
Resumo:
Unitary taxation is the taxation of the worldwide income of a multinational enterprise (MNE) and is normally based on a formulary apportionment method, which allocates income to the relevant jurisdictions based on a percentage of the MNE's world-wide profits. The unitary taxation model has several advantages over the existing arm's length model: 1. Where MNEs are highly integrated, unitary taxation has greater consistency with economic reality. 2. Greater certainty is provided to taxpayers. 3. Unitary taxation conforms to the aim of efficient operations within the MNE. 4. The aim of unitary taxation, to find an equitable split of profits between the jurisdictions, should ultimately be the overall aim of any tax regime. The advantages and disadvantages associated with the adoption of a unitary taxation model through the implementation of a formulary apportionment approach to the taxation of MNEs are examined.