342 resultados para Grant funded projects
Resumo:
With increasing media exposure and evidence of environmental impacts, it is increasingly recognized that incorporating sustainability principles in construction works is both crucial and beneficial. However a recent survey reveals that among stakeholders of infrastructure projects such as roads, there is no common understanding on what constitutes sustainability in real-life projects. Sustainability has been interpreted widely and differently and as a result, sustainability outcomes are not tangible at the project level or often neglected. Under such conditions, policies and strategies on sustainability remain largely ideological and cannot be sufficiently reflected in the actual project delivery. The major difficulty of this sustainability pursuit lies in the lack of consensus among the experts on sustainability criteria and indicators. To move ahead, these criteria and indicators are to be agreed upon. This paper reviews the sustainable infrastructure development, its criteria and indicators, focusing on road infrastructure context. It goes on to introduce a Delphi study, an integral part of a QUT research, aimed at identifying critical sustainability criteria and indicators for Australian road infrastructure projects. It paves the way for further identification of solutions for each critical indicator at a subsequent stage. The criteria, indicators and solutions will be encapsulated into a decision making framework for the enhancement of sustainability deliverables. By doing so, the research will promote more integrated thinking of and consistent approaches to the sustainability agenda in road and highway infrastructure projects in Australia.
Resumo:
The Texas Department of Transportation (TxDOT) is concerned about the widening gap between preservation needs and available funding. Funding levels are not adequate to meet the preservation needs of the roadway network; therefore projects listed in the 4-Year Pavement Management Plan must be ranked to determine which projects should be funded now and which can be postponed until a later year. Currently, each district uses locally developed methods to prioritize projects. These ranking methods have relied on less formal qualitative assessments based on engineers’ subjective judgment. It is important for TxDOT to have a 4-Year Pavement Management Plan that uses a transparent, rational project ranking process. The objective of this study is to develop a conceptual framework that describes the development of the 4-Year Pavement Management Plan. It can be largely divided into three Steps; 1) Network-Level project screening process, 2) Project-Level project ranking process, and 3) Economic Analysis. A rational pavement management procedure and a project ranking method accepted by districts and the TxDOT administration will maximize efficiency in budget allocations and will potentially help improve pavement condition. As a part of the implementation of the 4-Year Pavement Management Plan, the Network-Level Project Screening (NLPS) tool including the candidate project identification algorithm and the preliminary project ranking matrix was developed. The NLPS has been used by the Austin District Pavement Engineer (DPE) to evaluate PMIS (Pavement Management Information System) data and to prepare a preliminary list of candidate projects for further evaluation.
Resumo:
In June 2011, a research project team from the Institute for Ethics, Governance and Law (IEGL), Queensland University of Technology, the United Nations University, and the Australian Government’s Asia Pacific Civil-Military Centre of Excellence (APCMCOE) held three Capacity-Building Workshops (the Workshops) on the Responsibility to Protect (R2P) and the Protection of Civilians (POC) in Armed Conflict in Manila, Kuala Lumpur, and Jakarta. The research project is funded by the Australian Responsibility to Protect Fund, with support from APCMCOE. Developments in Libya and Cote d’Ivoire and the actions of the United Nations Security Council have given new significance to the relationship between R2P and POC, providing impetus to the relevance and application of the POC principle recognised in numerous Security Council resolutions, and the R2P principle, which was recognised by the United Nations General Assembly in 2005 and, now, by the Security Council. The Workshops considered the relationship between R2P and POC. The project team presented the preliminary findings of their study and sought contributions and feedback from Workshop participants. Prior to the Workshops, members of the project team undertook interviews with UN offices and agencies, international organisations (IOs) and non-government organisations (NGOs) in Geneva and New York as part of the process of mapping the relationship between R2P and POC. Initial findings were considered at an Academic-Practitioner Workshop held at the University of Sydney in November 2010. In addition to an extensive literature review and a series of academic publications, the project team is preparing a practical guidance text (the Guide) on the relationship between R2P and POC to assist the United Nations, governments, regional bodies, IOs and NGOs in considering and applying appropriate protection strategies. It is intended that the Guide be presented to the United Nations Secretariat in New York in early 2012. The primary aim of the Workshops was to test the project’s initial findings among an audience of diplomats, military, police, civilian policy-makers, practitioners, researchers and experts from within the region. Through dialogue and discussion, the project team gathered feedback – comments, questions, critique and suggestions – to help shape the development of practical guidance about when, how and by whom R2P and POC might be implemented.
Resumo:
Purpose---The aim of this study is to identify complexity measures for building projects in the People’s Republic of China (PRC). Design/Methodology/Approach---A three-round of Delphi questionnaire survey was conducted to identify the key parameters that measure the degree of project complexity. A complexity index (CI) was developed based on the identified measures and their relative importance. Findings---Six key measures of project complexity have been identified, which include, namely (1) building structure & function; (2) construction method; (3) the urgency of the project schedule; (4) project size/scale; (5) geological condition; and (6) neighboring environment. Practical implications---These complexity measures help stakeholders assess degrees of project complexity and better manage the potential risks that might be induced to different levels of project complexity. Originality/Value---The findings provide insightful perspectives to define and understand project complexity. For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.
Resumo:
Projects funded by the Australian National Data Service(ANDS). The specific projects that were funded included: a) Greenhouse Gas Emissions Project (N2O) with Prof. Peter Grace from QUT’s Institute of Sustainable Resources. b) Q150 Project for the management of multimedia data collected at Festival events with Prof. Phil Graham from QUT’s Institute of Creative Industries. c) Bio-diversity environmental sensing with Prof. Paul Roe from the QUT Microsoft eResearch Centre. For the purposes of these projects the Eclipse Rich Client Platform (Eclipse RCP) was chosen as an appropriate software development framework within which to develop the respective software. This poster will present a brief overview of the requirements of the projects, an overview of the experiences of the project team in using Eclipse RCP, report on the advantages and disadvantages of using Eclipse and it’s perspective on Eclipse as an integrated tool for supporting future data management requirements.
Resumo:
Modern project management had its genesis in the field of operations research in the late 1940s, but today it is a much more diverse subject. It has evolved and developed a much wider range of methods, techniques, and skills that the project manager can draw upon. Not all these skills are relevant to every project, but an assortment of them will be relevant to most. This book aims to describe for students, researchers and managers the full range of skills that project managers can use to develop their methodologies.The authors group the skills into nine perspectives, representing nine schools of project management research and theory. By attaching a metaphor to each of these perspectives, students, researchers and managers are better able to understand each approach and decide whether it is best suited to the development of a strategy for managing their project. Perspectives on Projects builds upon the various theoretical orientations that the field of project management has developed. Featuring several case studies, drawn from a variety of settings, to illustrate how the different schools can provide different perspectives on projects, this book is an ideal text for anyone involved in project management.
Resumo:
Project management is increasingly regarded as a strategic competency because projects play an active part in defining an organization’s relationship to its environment. It is now widely accepted that projects and programmes are at the centre of strategy implementation. However, the conditions and underlying assumptions of this dynamic relationship are still unclear. This paper aims to clarify the dynamics of the strategy process, by defining traditional approaches (corporate/business) and introducing three strategy core logics (archetypes). Building on this 'archetypology' the authors demonstrate how project management, through enactment and sense-making of strategy, enables organizations to face the challenge of complexity and uncertainty. While recognizing that the "traditional" methods of analysis and management remain valid under certain conditions, this paper offers new avenues of reflection concerning the necessary contextualization of the project management approaches in order to ensure coherence between archetypes, enactment, learning and decision-making.
Resumo:
Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.
Resumo:
Safety culture is a concept that has long been accepted in high risk industries such as aviation, nuclear industries and mining, however, considerable research is now also being undertaken within the construction sector. This paper discusses three recent interlocked projects undertaken in the Australian construction industry. The first project examined the development and implementation of a safety competency framework targeted at safety critical positions (SCP's) across first tier construction organisations. Combining qualitative and quantitative methods, the project: developed a matrix of SCP's (n=11) and safety management tasks (SMTs; n=39); mapped the process steps for their acquisition and development; detailed the knowledge, skills and behaviours required for all SMTs; and outlined potential organisational cultural outcomes from a successful implementation of the framework. The second project extended this research to develop behavioural guidelines for leaders to drive safety culture change down to second tier companies and to assist them to customise their own competency framework and implementation guidelines to match their aspirations and resources. The third interlocked project explored the use of safety effectiveness indicators (SEIs) as an industry-relevant assessment tool for reducing risk on construction sites. With direct linkages to safety competencies and SMT's, the SEIs are the next step towards an integrated safety cultural approach to safety and extend the concept of positive performance indicators (PPIs) by providing a valid, reliable, and user friendly measurement platform. Taken together, the results of the interlocked projects suggest that industry engaged collaborative safety culture research has many potential benefits for the construction industry.
Resumo:
Design-build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to the many advantages offered on projects by such systems. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. In order to provide evidence of the benefits of DB, it is essential to identify the factors that can contribute to successful DB implementation and this paper aims to provide evidence of such factors that can promote the successful implementation of DB project delivery systems on Indonesian road infrastructure projects. Four main factors and 28 indicators were identified from an extensive literature review, and a Delphi questionnaire survey was conducted amongst 20 experts drawn from the Indonesian road infrastructure construction sector. The first round Delphi study found that regulation, competency of clients, ability to manage DB projects and external conditions were the major factors that can promote successful DB implementation.
Resumo:
This interview was published in the catalogue for Peter Alwast's solo exhibition, "Future Perfect", at the Institute of Modern Art, Brisbane, in August 2011.
Resumo:
Grant Stevens is ambivalent. The young Brisbane artist made his name with a series of computer-generated animated-text videos that explore clichés but seem undecided as to whether they are trivial and vacuous, profound and authentic or somehow both at once. Stevens plunders mass-media sources (the familiar image repertoire dished up by Hollywood, television, pop music and the Internet) as readymade content. He explores this everyday language, sometimes for its ambiguity, but more often for its almost uncanny lucidity. Resembling meditation and relaxation guides, his recent videos beg the question: what made us so anxious? This book examines Stevens' artistic output over the first ten years of his practice. It includes essays by Mark Pennings and Chris Kraus.
Resumo:
Product innovation is an important contributor to the performance of infrastructure projects in the construction industry. Maximizing the potential for innovative product adoption is a challenging task due to the complexities of the construction innovation system. A qualitative methodology involving interviews with major construction project stakeholders is employed to address the research question: ‘What are the main obstacles to the adoption of innovative products in the road industry?’ The characteristics of six key product innovation obstacles in Australian road projects are described. The six key obstacles are: project goal misalignment, client pressures, weak contractual relations, lack of product trialling, inflexible product specifications and product liability concerns. A snapshot of the dynamics underlying these obstacles is provided. There are few such assessments in the literature, despite the imperative to improve construction innovation rates globally in order to deliver road infrastructure projects of increasing size and complexity. Key obstacles are interpreted through an open innovation construct, providing direction for policy to enhance the uptake of innovation across the construction product supply network. Early evidence suggests the usefulness of an open innovation construct that integrates three conceptual lenses: network governance, absorptive capacity and knowledge intermediation, in order to interpret product adoption obstacles in the context of Australian road infrastructure projects. The paper also provides practical advice and direction for government and industry organizations that wish to promote the flow of innovative product knowledge across the construction supply network.
Resumo:
Retrofit projects are different from newly-built projects in many respects. A retrofit project involves an existing building, which imposes constraints on the owners, designers, operators and constructors throughout the project process. Retrofit projects are risky, complex, less predictable and difficult to be well planned, which need greater coordination. For office building retrofit project, further restrictions will apply as these buildings often locate in CBD areas and most have to remain operational during the progression of project work. Issues such as site space, material storage and handling, noise and dust, need to be considered and well addressed. In this context, waste management is even more challenging with small spaces for waste handling, uncertainties in waste control, and impact of waste management activities on project delivery and building occupants. Current literatures on waste management in office building retrofit projects focus on increasing waste recovery rate based on project planning, monitoring and stakeholders’ collaboration. However, previous research has not produced knowledge of understanding the particular retrofit processes and their impact on waste generation and management. This paper discusses the interim results of a continuing research on new strategies for waste management in office building retrofit projects. Firstly based on the literature review, it summarizes the unique characteristics of office building retrofit projects and their influence on waste management. An assumption on waste management strategies is formed. Semi-structured interviews were conducted towards industry practitioners and findings are then presented in the paper. The assumption of the research was validated in the interviews from the opinions and experiences of the respondents. Finally the research develops a process model for waste management in office building retrofit projects. It introduces two different waste management strategies. For the dismantling phase, waste is generated fast along with the work progress, so integrated planning for project delivery and waste generation is needed in order to organize prompt handling and treatment. For the fit-out phase, the work is similar as new construction. Factors which are particularly linked to generating waste on site need to be controlled and monitored. Continuing research in this space will help improve the practice of waste management in office building retrofit projects. The new strategies will help promote the practicality of project waste planning and management and stakeholders’ capability of coordinating waste management and project delivery.