620 resultados para Continuous systems


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A range of influences, both technical and organisational, has encouraged the wide spread adoption of Enterprise Systems (ES). Nevertheless, there is a growing consensus that Enterprise Systems have in many cases failed to provide expected benefits. The increasing role of, and dependency on ES (and IT in general), and the ‘uncertainty’ of these large investments, have created a strong need to monitor and measure ES performance. This paper reports on a research project aimed at deriving an ‘Enterprise Systems benefits measurement instrument’. The research seeks to identify how Enterprise Systems benefits can be usefully measured, with a ‘balance’ between qualitative and quantitative factors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A range of influences, both technical and organizational, has encouraged the widespread adoption of Enterprise Systems (ES). The integrated and process-oriented nature of Enterprise Systems has led organizations to use process modelling as a means of managing the complexity of these systems, and to aid in achieving business goals. Past research illustrates how process modelling is applied across different Enterprise Systems lifecycle phases. However, no empirical evidence exists to evaluate what factors are essential for a successful process modelling initiative, in general or in an ES context. This research-in-progress paper reports on an empirical investigation of the factors that influence process modelling success. It presents an a-priori process modelling critical-success-factors-model, describes its derivation, and concludes with an outlook to the next stages of the research.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.