276 resultados para Buried infrastructure
Resumo:
Against a background of already thin markets in some sectors of major public sector infrastructure in Australia and the desire of the Australian federal government to leverage private finance, concerns about ensuring sufficient levels of competition are prompting federal government to seek new sources of in-bound foreign direct income - as part of attracting more foreign contractors and consortia to bid for Australian public sector major infrastructure. As a first step towards attracting greater overseas interest in the Australian public sector market infrastructure market, an improved understanding of the determinants of multinational contractors’ willingness to bid in this market is offered by Dunning’s eclectic paradigm and which have has been a dominant approach in international business for over 20 years and yet has been little used in the context of international contracting. This paper aims to develop Dunning’s eclectic framework and also gives a brief outline of a research plan to collect secondary data and primary data from international contractors around the globe in pursuance of testing the eclectic framework.
Resumo:
In the networked information driven world that we now inhabit the ability to access and reuse information, data and culture is a key ingredient to social, economic and cultural innovation. As government holds enormous amounts of publicly funded material that can be released to the public without breaching the law it should move to implement policies that will allow better access to and reuse of that information, knowledge and culture. The Queensland Government Information Licensing Framework (GILF) Project4 is one of the first projects in the world to systemically approach this issue and should be consulted as a best practice model.
Resumo:
Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). The paper begins with an update on a key development in a new early/first-order procurement decision making model that deploys production cost/benefit theory and theories concerning transaction costs from the New Institutional Economics, in order to identify a procurement mode that is likely to deliver the best ratio of production costs and transaction costs to production benefits, and therefore deliver superior VfM relative to alternative procurement modes. In doing so, the new procurement model is also able to address the uncertainty concerning the relative merits of Public-Private Partnerships (PPP) and non-PPP procurement approaches. The main aim of the paper is to develop competition as a dependent variable/proxy for VfM and a hypothesis (overarching proposition), as well as developing a research method to test the new procurement model. Competition reflects both production costs and benefits (absolute level of competition) and transaction costs (level of realised competition) and is a key proxy for VfM. Using competition as a proxy for VfM, the overarching proposition is given as: When the actual procurement mode matches the predicted (theoretical) procurement mode (informed by the new procurement model), then actual competition is expected to match potential competition (based on actual capacity). To collect data to test this proposition, the research method that is developed in this paper combines a survey and case study approach. More specifically, data collection instruments for the surveys to collect data on actual procurement, actual competition and potential competition are outlined. Finally, plans for analysing this survey data are briefly mentioned, along with noting the planned use of analytical pattern matching in deploying the new procurement model and in order to develop the predicted (theoretical) procurement mode.
Resumo:
Urban expansion continues to encroach on existing or newly implemented sewerage infrastructure. In this context, legislation and guidelines, both national and international, provide limited direction to the amenity allocation of appropriate buffering distances for land use planners and infrastructure providers. A review of published literature suggests the dominant influences include topography, wind speed and direction, temperature, humidity, existing land uses and vegetation profiles. A statistical criteria review of these factors against six years of sewerage odour complaint data was undertaken to ascertain their influence and a complaint severity hierarchy was established. These hierarchical results suggested the main criteria were: topographical location, elevation relative to the odour source and wind speed. Establishing a justifiable criterion for buffer zone allocations will assist in analytically determining a basis for buffer separations and will assist planners and infrastructure designers in assessing lower impact sewerage infrastructure locations.
Resumo:
Urban expansion continues to encroach on once isolated sewerage infrastructure. In this context,legislation and guidelines provide limited direction to the amenity allocation of appropriate buffer distances for land use planners and infrastructure providers. Topography, wind speed and direction,temperature, humidity, existing land uses and vegetation profiles are some of the factors that require investigation in analytically determining a basis for buffer separations. This paper discusses the compilation and analysis of six years of Logan sewerage odour complaint data. Graphically,relationships between the complaints, topographical features and meteorological data are presented. Application of a buffer sizing process could assist planners and infrastructure designers alike, whilst automatically providing extra green spaces. Establishing a justifiable criterion for buffer zone allocations can only assist in promoting manageable growth for healthier and more sustainable communities.
Resumo:
Design-Build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to its many advantages. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. This paper reviews the existing literature to explore factors that can influence the successful implementation of DB project delivery system in Indonesian road infrastructure projects. It founds the lack of clarification in existing legislations as well as the lack of experiences, knowledge and skill as the main obstacles in implementing DB systems in Indonesia. To overcome these obstacles, this paper proposes (1) A relook at existing legislation in term of providing more guidance on determining projects appropriate for the DB, procedures for implementing DB, and the structure of builder entity; (2) To develop the skills and knowledge of DB to all stakeholders through communications, knowledge sharing and training. The outcome of this review can serve as a guide to development a framework for the implementation of the design-build project delivery system in Indonesian road infrastructure projects.
Resumo:
Project selection is a decision-making process that is not merely influenced by technical aspects but also by the people who involved in the process. Organisational culture is described as a set of values and norms that are shared by people within the organisation that affects the way they interact with each other and with stakeholders from outside the organisation. The aim of this paper is to emphasize the importance of organisational culture on improving the quality of decisions in the project selection process, in addition to the influence of technical aspects of a project. The discussion is based on an extensive literature review and, as such, represents the first part of a research agenda investigating the impact of organisational culture on the project selection process applicable specifically to road infrastructure contracts. Four existing models of organisational culture (Denison 1990; Cameron and Quinn 2006; Hofstede 2001; Glaser et al 1987) are discussed and reviewed in view of their use in the larger research project to investigate the impact of culture on identified critical elements of decision-making. An understating of the way organisational culture impacts on project selection will increase the likelihood in future of relevant government departments selecting projects that achieve their stated organisational goals.
Resumo:
Fixed-wing aircraft equipped with downward pointing cameras and/or LiDAR can be used for inspecting approximately piecewise linear assets such as oil-gas pipelines, roads and power-lines. Automatic control of such aircraft is important from a productivity and safety point of view (long periods of precision manual flight at low-altitude is not considered reasonable from a safety perspective). This paper investigates the effect of any unwanted coupling between guidance and autopilot loops (typically caused by unmodeled delays in the aircraft’s response), and the specific impact of any unwanted dynamics on the performance of aircraft undertaking inspection of piecewise linear corridor assets (such as powerlines). Simulation studies and experimental flight tests are used to demonstrate the benefits of a simple compensator in mitigating the unwanted lateral oscillatory behaviour (or coupling) that is caused by unmodeled time constants in the aircraft dynamics.
Resumo:
Purpose Maintenance management is a core process in infrastructure asset management. Infrastructure organisations must constantly strive to ensure the effectiveness of this process in order to obtain the greatest lifetime value from their infrastructure assets. This paper aims to investigate how infrastructure organisations can enhance the effectiveness of their maintenance management process. Approach This study utilised multiple case studies as the research approach. The case organisations were asked to identify the challenges faced in the maintenance process and the approaches they have adopted to overcome these challenges. Analysis of these findings, together with deductive reasoning, leads to the development of the proposed capability needed for effective maintenance management process. Findings The case studies reveal that maintenance management process is a core process in ensuring that infrastructure assets are optimally and functionally available to support business operations. However, the main challenge is the lack of skilled and experienced personnel to understand and anticipate maintenance requirement. A second challenge is the reduced window of time available to carry out inspection and maintenance works. To overcome these challenges, the case organisations have invested in technologies. However, technologies available to facilitate this process are complex and constantly changing. Consequently, there is a need for infrastructure organizations to develop their technological absorptive capability, i.e. the ability to embrace and capitalize on new technologies to enhance their maintenance management process. Originality/Value This paper is original in that it provides empirical evidence to identify technological absorptive capability as core to improving the maintenance management process. The findings are valuable because it sheds light on where infrastructure organisation, regardless of whether they are privately or publicly owned, should channel their scarce resources. The development of the core capability will ensure that the maintenance process can contribute value to their organisation.
Resumo:
Infrastructure organizations are operating in an increasingly challenging business environment as a result of globalization, privatization and deregulation. In an external business environment that is constantly changing, extant literature on strategic management advocates the need to focus on factors internal to the organization such as resources and capabilities to sustain their performance. Specifically, they need to develop dynamic capabilities in order to survive and prosper under conditions of change. The aim of this paper is to explore the dynamic capabilities needed in the management of transport infrastructure assets using a multiple case study research strategy. This paper produced a number of findings. First, the empirical evidence showed that the core infrastructure asset management processes are capacity management, options evaluation, procurement & delivery, maintenance management, and asset information management. Second, the study identified five dynamic capabilities namely stakeholder connectivity, cross-functional, relational, technology absorptive and integrated information capability as central to executing the strategic infrastructure asset management processes well. These findings culminate in the development of a capability model to improve the performance of infrastructure assets in an increasingly dynamic business environment.
Resumo:
Project selection is a complex decision-making process as it involves multiple objectives, constraints and stakeholders. Understanding the organisation, in particular organisational culture, is an essential stage in improving decision-making process. The influences of organisational culture on decision-making can be seen in the way people work as a team, act and cooperate in their teamwork to achieve the set goals, and also in how people think, prioritize and decide. This paper aims to give evidence of the impact of organisational culture on the decision-making process in project selection, in the Indonesian context. Data was collected from a questionnaire survey developed based on the existing models of organisational culture (Denison 1990, Hofstede 2001, and Glaser et al 1987). Four main cultural traits (involvement, consistency, mission and power-distance) were selected and employed to examine the influence of organisational culture on the effectiveness of decision-making in the current Indonesian project selection processes. The results reveal that there are differences in organisational cultures for two organisations in three provinces. It also suggests that organisational culture (particularly the traits of ‘involvement’, ‘consistency’ and ‘mission’) contribute to the effectiveness of decision-making in the selected cases.
Resumo:
Formalised service innovation is a central tenet of enterprise systems lifecycle phases. Event driven process models extended with knowledge objects are found to be not useful in early lifecycle phases. When an upgrade is required, a map of the knowledge infrastructure is needed to better design further service innovation because functional maps no longer adequately describe the context adequately. By looking at formal changes to business processes as service innovations, and recognising the knowledge infrastructure inherent in services generally, changes driven through technology such as ES can be better understood with the application of frameworks such as B-KIDE.
Resumo:
In Australia, it has been increasingly accepted that sustainability needs to be at the top of the agenda when contemplating infrastructure development. In practice however, many companies struggle to find effective ways to embrace sustainable ideas and implement them in real projects beyond minimum compliance. One of the reasons is the lack of underpinning knowledge and evidence to demonstrate and measure the linkage between sustainability implementations and the relevant outcomes. This is compounded by the fact that very often there are no common understandings between the stakeholders on sustainability and there is a big divide between research advancement and real-life applications. Therefore it is both feasible and timely to develop and expand the body of sustainability knowledge on infrastructure development and investigate better ways of communicating with and managing it within the infrastructure sector. Although knowledge management (KM) is a relatively new and emerging discipline, it has shown its value and promise in existing applications in the construction industry. Considering the existing KM mechanisms and tools employed in practice, this research is aimed at establishing a specific KM approach to facilitate sustainability knowledge identification, acquisition, sharing, maintenance and application within the infrastructure sector, and promote integrated decision-making for sustainable infrastructure development. A triangulation of questionnaire survey, semi-structured interviews and case studies was employed in this research to collect required qualitative and quantitative data. The research studied the unique characteristics of the infrastructure sector, the nature of sustainability knowledge, and evaluated and validated the critical elements, key processes, and priority issues of KM for the Australian infrastructure sector. A holistic KM framework was developed to set the overall context for managing sustainability knowledge in the infrastructure sector by outlining (1) the main aims and outcomes of managing sustainability knowledge, (2) the key knowledge activities, (3) effective KM strategies and instruments, and (4) KM enablers. Because of the highly project-oriented nature of the infrastructure sector, knowledge can only add value when it is being used in real projects. Implementation guidelines were developed to help the industry practitioners and project teams to apply sustainability knowledge and implement KM in infrastructure project scenarios. This research provides the Australian infrastructure sector with tools to better understand KM, helps the industry practitioners to prioritize attention on relevant sustainability issues, and recommends effective practices to manage sustainability knowledge, especially in real life implementation of infrastructure projects.
Resumo:
The following paper proposes a novel application of Skid-to-Turn maneuvers for fixed wing Unmanned Aerial Vehicles (UAVs) inspecting locally linear infrastructure. Fixed wing UAVs, following the design of manned aircraft, traditionally employ Bank-to-Turn maneuvers to change heading and thus direction of travel. Commonly overlooked is the effect these maneuvers have on downward facing body fixed sensors, which as a result of bank, point away from the feature during turns. By adopting Skid-to-Turn maneuvers, the aircraft is able change heading whilst maintaining wings level flight, thus allowing body fixed sensors to maintain a downward facing orientation. Eliminating roll also helps to improve data quality, as sensors are no longer subjected to the swinging motion induced as they pivot about an axis perpendicular to their line of sight. Traditional tracking controllers that apply an indirect approach of capturing ground based data by flying directly overhead can also see the feature off center due to steady state pitch and roll required to stay on course. An Image Based Visual Servo controller is developed to address this issue, allowing features to be directly tracked within the image plane. Performance of the proposed controller is tested against that of a Bank-to-Turn tracking controller driven by GPS derived cross track error in a simulation environment developed to simulate the field of view of a body fixed camera.