561 resultados para project state


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Partnering has been defined in many ways. It can be considered as an individual project mechanism or can be considered as a long term strategy. Alliancing is normally assumed to be a long term business strategy linking together client, contractor and supply chain. Relational contracting goes further than this and brings in the whole philosophy of the value chain and the linking of the interdependent parts within the construction project as a key business objective. This document aims to review existing definitions of these three concepts and present and overview of the current state of-the-art in terms of their use and implementation. The document should be useful for all of those project team members looking to sharpen their understanding of the various concepts and will also provide a platform for debating the current state of the definitions and implementations being used in Main Roads and Public Works Departments.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Contractor selection is a crucial element in construction procurement (Drew & Skitmore 1993, p. 363). Contractors are selected through the tender process, which varies according to country, state and contracting organisation and is subject to individual differences. This paper reviews a range of international tender processes, highlighting the ethical features that govern these guidelines. The paper is part of a project to develop ethical guidelines for procurement for major contracting authorities. By reviewing tender guidelines we are able to gain an indication of the type of ethical standards reserved for procurement. The need for good business ethics in the tender process stems from the belief that ‘good ethical practice’ is critical in meeting organisational goals (Vee & Skitmore 2003, p. 125). Hence, an ethical tender process will select ethical contractors who are viewed as beneficial to the contracting authority.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Policy instruments of education, regulation, fines and inspection have all been utilised by Australian jurisdictions as they attempt to improve the poor performance of occupational health and safety (OH&S) in the construction industry. However, such policy frameworks have been largely uncoordinated across Australia, resulting in differing policy systems, with differing requirements and compliance systems. Such complexity, particularly for construction firms operating across jurisdictional borders, led to various attempts to improve the consistency of OH&S regulation across Australia, four of which will be reviewed in this report. 1. The first is the Occupational Health and Safety Act 1991 (Commonwealth) which enabled certain organisations to opt out of state based regulatory regimes. 2. The second is the development of national standards, codes of practice and guidance documents by the National Occupational Health and Safety Council (NOHSC). The intent was that the OHS requirements, principles and practices contained in these documents would be adopted by state and territory governments into their legislation and policy, thereby promoting regulatory consistency across Australia. 3. The third is the attachment of conditions to special purpose payments from the Commonwealth to the States, in the form of OH&S accreditation with the Office of the Federal Safety Commissioner. 4. The fourth is the development of national voluntary codes of OHS practice for the construction industry. It is interesting to note that the tempo of change has increased significantly since 2003, with the release of the findings of the Cole Royal Commission. This paper examines and evaluates each of these attempts to promote consistency across Australia. It concludes that while there is a high level of information sharing between jurisdictions, particularly from the NOSHC standards, a fragmented OH&S policy framework still remains in place across Australia. The utility of emergent industry initiatives such as voluntary codes and guidelines for safer construction practices to enhance consistency are discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The rate of water reform in Australia is gathering pace with Federal and State initiatives promoting a more integrated approach to water management. This approach encompasses a more competitive environment and a greater role for the private sector. There is a growing recognition of the importance of water recycling in these initiatives and the need to provide opportunities for its development. In March 2008 the Productivity Commission published its discussion paper on urban water reform (Productivity Commission, 2008). The paper cited inadequate institutional arrangements for the management of Australian urban water resources and noted the benefits to be gained from a comprehensive public review of urban water management. This development can be supported through the promotion of a sewer mining industry. This industry, offers flexible and innovative solutions to water recycling demands in a variety of situations and structures. In addition it has the capability of satisfying government competition and private sector policy initiatives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the third in a series of reports planned for this project. The aim of this research is to conduct a comparative study of current legislation or guidelines at the federal, state and local government levels to confirm if any natural ventilation criteria are required at the subdivision development stage of planning. It also seeks to discover if there are any other incentives, statutory planning or development principles that encourage developers to orient subdivision lots to maximize natural ventilation for the dwellings. Findings from the research in this report are intended to contribute to the discussion on the development of an enhanced lot rating methodology for sustainable subdivisions as documented in other reports in this series.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This first interim report on ‘best value’ reviewed the academic literature relating to ‘best value’ and illustrated the varying interpretations that the concept of ‘best value’ has attracted. It also examined current state of the literature on best value in construction project procurement. ‘Best value’ was explored from the perspective of both the business enterprise and public sector. It was concluded that ‘best value’ in the public sector is considerably more complex. This second interim report explores how ‘best value’ has been implemented in the UK. Focus is directed towards the UK, particularly Scotland’s approach to examine the complexity of implementation of ‘best value’ in the public sector context. Scotland has been recognised as a leader in the field of ‘best value’ in the public sector (Curry, 1999; Wisniewski and Stewart, 2001, 2004; Jaconelli and Sheffield, 2000)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Durability issues of reinforced concrete construction cost millions of dollars in repair or demolition. Identification of the causes of degradation and a prediction of service life based on experience, judgement and local knowledge has limitations in addressing all the associated issues. The objective of this CRC CI research project is to develop a tool that will assist in the interpretation of the symptoms of degradation of concrete structures, estimate residual capacity and recommend cost effective solutions. This report is a documentation of the research undertaken in connection with this project. The primary focus of this research is centred on the case studies provided by Queensland Department of Main Roads (QDMR) and Brisbane City Council (BCC). These organisations are endowed with the responsibility of managing a huge volume of bridge infrastructure in the state of Queensland, Australia. The main issue to be addressed in managing these structures is the deterioration of bridge stock leading to a reduction in service life. Other issues such as political backlash, public inconvenience, approach land acquisitions are crucial but are not within the scope of this project. It is to be noted that deterioration is accentuated by aggressive environments such as salt water, acidic or sodic soils. Carse, 2005, has noted that the road authorities need to invest their first dollars in understanding their local concretes and optimising the durability performance of structures and then look at potential remedial strategies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Practice placement education has been recognised as an integral and critical component of the training of occupational therapy students. Although there is an extensive body of literature on clinical education and traditional practice placement education models, there has been limited research on alternative placements.-------- This paper reviews the literature on various practice placement education models and presents a contemporary view on how it is currently delivered. The literature is examined with a particular focus on the increasing range of practice placement education opportunities, such as project and role-emerging placements. The drivers for non-traditional practice placement education include shortages of traditional placement options, health reform and changing work practices, potential for role development and influence on practice choice. The benefits and challenges of non-traditional practice placement education are discussed, including supervision issues, student evaluation, professional and personal development and the opportunity to practise clinical skills.--------- Further research is recommended to investigate occupational therapy graduates' perceptions of role-emerging and project placements in order to identify the benefits or otherwise of these placements and to contribute to the limited body of knowledge of emerging education opportunities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Paramedics are at high risk of exposure to infectious diseases because they frequently undertake procedures such as the use and disposal of sharps as components of everyday practice. While the literature demonstrates that the management of sharps is problematic across all health disciplines, there is a paucity of research examining sharps management practices in the Australian pre-hospital paramedic context. This study examines knowledge and practices of sharps control among paramedics in Queensland, Australia. A mail survey focusing on infection control knowledge and practices was sent to all clinical personnel of the Queensland Ambulance Service (QAS) (N = 2274). A total of 1258 surveys were returned, a response rate of 55.3%. Participants responded to 12 true/false statements on the management of sharps and three questions about recapping practices. Most respondents were knowledgeable about the correct management of sharps, with a mean of 11.28 (out of 12, SD = 1.32). When gauging reported practices, more than half (59.1%, n = 736) of participants reported recapping a needle, and 38.5% (n = 479) reported never having done so. These results reflect good knowledge of general management of sharps among respondents, but suggest deficits regarding reported practices. The results suggest that a comprehensive ambulance in-service education programme focusing particularly on sharps management is required. The study highlights the need for further research on sharps management practices in the field, identification of barriers to safe sharps practices in pre-hospital settings, and 'best practice' for translating good sharps management knowledge into practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper presents an interim summary of research and case studies being undertaken in the Sydney Opera House FM Exemplar Project covering procurement, benchmarking and building information models. The final outcomes of the FM Exemplar Project will be presented through various forums open to all FM practitioners and published in Australia and elsewhere through relevant journals. Sydney Opera House is an Australian icon, attracting some 4.5 million visitors per year who admire its built form and enjoy an evening of theatre. The building is the attraction, part of the experience. Therefore, facilities management is critical to the success of the Sydney Opera House enterprise and an ideal subject for the study of facilities management. Significantly the three research themes are heavily intertwined – effective risk sharing in procurement requires historic information and benchmarks for future performance, benchmarking gathers vast quantities of data that can only be exploited if properly related to one another and a building information model provides the means to manage such data. The case studies are emerging as real-life examples of how one organisation is addressing FM issues common to many, and will provide useful lessons for practitioners pursing similar strategies in their own organisations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

One of the key issues facing public asset owners is the decision of refurbishing aged built assets. This decision requires an assessment of the “remaining service life” of the key components in a building. The remaining service life is significantly dependent upon the existing condition of the asset and future degradation patterns considering durability and functional obsolescence. Recently developed methods on Residual Service Life modelling, require sophisticated data that are not readily available. Most of the data available are in the form of reports prior to undertaking major repairs or in the form of sessional audit reports. Valuable information from these available sources can serve as bench marks for estimating the reference service life. The authors have acquired similar informations from a public asset building in Melbourne. Using these informations, the residual service life of a case study building façade has been estimated in this paper based on state-of-the-art approaches. These estimations have been evaluated against expert opinion. Though the results are encouraging it is clear that the state-of-the-art methodologies can only provide meaningful estimates provided the level and quality of data are available. This investigation resulted in the development of a new framework for maintenance that integrates the condition assessment procedures and factors influencing residual service life

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the process adopted in developing an integrated decision support framework for planning of office building refurbishment projects, with specific emphasize on optimising rentable floor space, structural strengthening, residual life and sustainability. Expert opinion on the issues to be considered in a tool is being captured through the DELPHI process, which is currently ongoing. The methodology for development of the integrated tool will be validated through decisions taken during a case study project: refurbishment of CH1 building of Melbourne City Council, which will be followed through to completion by the research team. Current status of the CH1 planning will be presented in the context of the research project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The 2007 Australian Federal election not only saw the election of a Labor government after 11 years of John Howard’s conservative Coalition government. It also saw new levels of political engagement through the Internet, including the rise of citizen journalism as an alternative outlet and mode of reporting on the election. This paper reports on the You Decide 2007 project, an initiative undertaken by a QUT-based research team to facilitate online news reporting on the election on a ‘hyper-local’, electorate-based model. We evaluate the You Decide initiative on the basis of: promoting greater citizen participation in Australian politics; new ways of engaging citizens and key stakeholders in policy deliberation; establishing new links between mainstream media and independent online media; and broadening the base of political participation to include a wider range of citizen and groups.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Australia, between 1994 and 2000, 50 construction workers were killed each year as a result of their work, the industry fatality rate, at 10.4 per 100,000 persons, is similar to the national road toll fatality rate and the rate of serious injury is 50% higher than the all industries average. This poor performance represents a significant threat to the industry’s social sustainability. Despite the best efforts of regulators and policy makers at both State and Federal levels, the incidence of death, injury and illness in the Australian construction industry has remained intransigently high, prompting an industry-led initiative to improve the occupational health and safety (OHS) performance of the Australian construction industry. The ‘Safer Construction’ project involves the development of an evidence-based Voluntary Code of Practice for OHS in the industry.