283 resultados para interdependence within project and construction
Resumo:
This article examines shifts in educational and social governance taking place in Queensland, Australia, through Industry School Engagement Strategy of Education Queensland and its Gateway Schools program. This significant educational initiative is set within the context of the social investment agenda first articulated in the education policy framework, Queensland State Education-2010. The article traces the historic extension of this governmental strategy through establishment of the Gateway Schools concept that brokers industry-school partnerships with global players in the Queensland economy. Industry sectors forming the partnerships include Minerals and Energy, Aerospace, Wine Tourism, Agribusiness, Manufacturing and Engineering, Building and Construction and ICT. We argue that this ‘post-bureaucratic’ model of schooling represents a new social settlement of neoliberal governance, in which educational outcomes align with economic objectives, and frame the conditions for community self-governance.
Resumo:
1.1 Background What is renewable energy education and training? A cursory exploration of the International Solar Energy Society website (www.ises.org) reveals numerous references to education and training, referring collectively to concepts of the transfer and exchange of information and good practices, awareness raising and skills development. The purposes of such education and training relate to changing policy, stimulating industry, improving quality control and promoting the wider use of renewable energy sources. The primary objective appears to be to accelerate a transition to a better world for everyone (ISEE), as the greater use of renewable energy is seen as key to climate recovery; world poverty alleviation; advances in energy security, access and equality; improved human and environmental health; and a stabilized society. The Solar Cities project – Habitats of Tomorrow – aims at promoting the greater use of renewable energy within the context of long term planning for sustainable urban development. The focus is on cities or communities as complete systems; each one a unique laboratory allowing for the study of urban sustainability within the context of a low carbon lifestyle. The purpose of this paper is to report on an evaluation of a Solar Community in Australia, focusing specifically on the implications (i) for our understandings and practices in renewable energy education and training and (ii) for sustainability outcomes. 1.2 Methodology The physical context is a residential Ecovillage (a Solar Community) in sub-tropical Queensland, Australia (latitude 28o south). An extensive Architectural and Landscape Code (A&LC) ‘premised on the interconnectedness of all things’ and embracing ‘both local and global concerns’ governs the design and construction of housing in the estate: all houses are constructed off-ground (i.e. on stumps or stilts) and incorporate a hybrid approach to the building envelope (mixed use of thermal mass and light-weight materials). Passive solar design, gas boosted solar water heaters and a minimum 1kWp photovoltaic system (grid connected) are all mandatory, whilst high energy use appliances such as air conditioners and clothes driers are not permitted. Eight families participated in an extended case study that encompassed both quantitative and qualitative approaches to better understand sustainable housing (perceived as a single complex technology) through its phases of design, construction and occupation. 1.3 Results The results revealed that the level of sustainability (i.e. the performance outcomes in terms of a low-carbon lifestyle) was impacted on by numerous ‘players’ in the supply chain, such as architects, engineers and subcontractors, the housing market, the developer, product manufacturers / suppliers / installers and regulators. Three key factors were complicit in the level of success: (i) systems thinking; (ii) informed decision making; and (iii) environmental ethics and business practices. 1.4 Discussion The experiences of these families bring into question our understandings and practices with regard to education and training. Whilst increasing and transferring knowledge and skills is essential, the results appear to indicate that there is a strong need for expanding our education efforts to incorporate foundational skills in complex systems and decision making processes, combined with an understanding of how our individual and collective values and beliefs impact on these systems and processes.
Resumo:
The goal of this research project is to develop specific BIM objects for temporary construction activities which are fully integrated with object design, construction efficiency and safety parameters. Specifically, the project will deliver modularised electronic scaffolding and formwork objects that will allow designers to easily incorporate them into BIM models to facilitate smarter and safer infrastructure and building construction. This research first identified there is currently a distinct lack of BIM objects for temporary construction works resulting in productivity loss during design and construction, and opportunities for improved consideration of safety standards and practices with the design of scaffolding and formwork. This is particularly relevant in Australia, given the “harmonisation” of OHS legislation across all states and territories from 1 January 2012, meaning that enhancements to Queensland practices will have direct application across Australia. Thus, in conjunction with government and industry partners in Queensland, Australia, the research team developed a strategic three-phase research methodology: (1) the preliminary review phase on industrial scaffolding and formwork practices and BIM implementation; (2) the BIM object development phase with specific safety and productivity functions; and (3) the Queensland-wide workshop phase for product dissemination and training. This paper discusses background review findings, details of the developed methodology, and expected research outcomes and their contributions to the Australian construction industry.
Resumo:
Recent studies suggest that meta-evaluation can be valuable in developing new approaches to evaluation, building evaluation capacities, and enhancing organizational learning. These new extensions of the concept of meta-evaluation are significant, given the growing emphasis on improving the quality and effectiveness of evaluation practices in the South Asian region. Following a review of the literature, this paper presents a case study of the use of concurrent meta-evaluation in the four-year project Assessing Communication for Social Change which developed and trialled a participatory impact assessment methodology in collaboration with a development communication Non-government organization (NGO) in Nepal. Key objectives of the meta-evaluation included to: continuously develop, adapt and improve the impact assessment methodology, Monitoring and Evaluation (M&E) systems and process and other project activities; identify impacts of the project; and build capacities in critical reflection and review. Our analysis indicates that this meta-evaluation was essential to understanding various constraints related to the organizational context that affected the success of the project and the development of improved M&E systems and capacities within the NGO. We identified several limitations of our meta-evaluation methods, which were balanced by the strengths of other methods. Our case study suggests that as well as assessing the quality, credibility and value of evaluation practices, meta-evaluations need to focus on important contextual issues that can have significant impacts on the outcomes of participatory evaluation projects. They include hierarchical organizational cultures, communication barriers, power/knowledge relations, and the time and resources available. Meta-evaluations also need to consider wider issues such as the sustainability of evaluation systems and approaches.
Resumo:
There is increasing concern about the impact of employees‟ alcohol and other drug (AOD) consumption on workplace safety and performance, particularly within the construction industry. While most Australian jurisdictions have identified this as a critical safety issue, information is limited regarding the prevalence of AODs in the workplace and there is limited evidential guidance regarding how to effectively and efficiently address such an issue. The current research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce - to render it unacceptable to arrive at a construction workplace with impaired judgement from AODs. The study will adopt qualitative and quantitative methods to firstly evaluate the extent of general AOD use in the industry. Secondly, the development of an appropriate industry policy will adopt a non-punitive and rehabilitative approach developed in consultation with employers and employees across the infrastructure and building sectors, with the aim it be adopted nationally for adoption at the construction workplace. Finally, an industry specific cultural change management program and implementation plan will be developed through a nationally collaborative approach. Final results indicate that a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off cumulative score for risky or hazardous alcohol. Other drug use was also identified as a major issue. Results support the need for evidence-based, preventative educational initiatives that are tailored to the industry. This paper will discuss the final survey and interview results.
Resumo:
Australia is experiencing an unprecedented expansion in mining due to intense demand from Asian economies thirsty for Australia’s non-renewable resources, with over $260 billion worth of capital investment currently in the pipeline (BREE 10). The scale of the present boom coupled with the longer term intensification of competitiveness in the global resources sector is changing the very nature of mining operations in Australia. Of particular note is the increasingly heavy reliance on a non-resident workforce, currently sourced from within Australia but with some recent proposals for projects to draw on overseas guest workers. This is no longer confined, as it once was, to remote, short term projects or to exploration and construction phases of operations, but is emerging as the preferred industry norm. Depending upon project location, workers may either fly-in, fly-out (FIFO) or drive-in, drive-out (DIDO), the critical point being that these operations are frequently undertaken in or near established communities. Drawing primarily on original fieldwork in one of Australia’s mining regions at the forefront of the boom, this paper explores some of the local impacts of new mining regimes, in particular their tendency to undermine collective solidarities, promote social division and fan cultural conflict.
Resumo:
Implementing educational reform requires partnerships, and university-school collaborations in the form of investigative and experimental projects can aim to determine the practicalities of reform. However, there are funded projects that do not achieve intended outcomes. In the context of a new reform initiative in education, namely, science, technology, engineering and mathematics (STEM) education, this article explores the management of a government-funded project. In a university school partnership for STEM education, how can leadership be distributed for achieving project outcomes? Participants included university personnel from different STEM areas, school teachers and school executives. Data collected included observations, interviews, resource materials, and video and photographic images. Findings indicated that leadership roles were distributed and selfactivated by project partners according to their areas of expertise and proximal activeness to the project phases, that is: (1) establishing partnerships; (2) planning and collaboration; (3) project implementation; and (4) project evaluation and further initiatives. Leadership can be intentional and unintentional within project phases, and understanding how leadership can be distributed and selfactivated more purposefully may aid in generating more expedient project outcomes.
Resumo:
The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks simultaneously. However, this model considers those failure risks that occur only over the design and construction phases of a project’s life cycle. While it can be sufficient for some projects for which the required cost during the operating life is much less than the budget required over the construction period, it should be modified in relation to infrastructure projects because the associated costs during the operating life cycle are significant. In this paper, a modified APRAM is proposed, which can consider potential risks that might occur over the entire life cycle of the project, including technical and managerial failure risks. Therefore, the modified model can be used as an efficient decision-support tool for construction managers in the housing industry in which various alternatives might be technically available. The modified method is demonstrated by using a real building project, and this demonstration shows that it can be employed efficiently by construction managers. The Delphi method was applied in order to figure out the failure events and their associated probabilities. The results show that although the initial cost of a cold-formed steel structural system is higher than a conventional construction system, the former’s failure cost is much lower than the latter’s
Resumo:
A considerable amount of research has confirmed the relationship between organizational culture and knowledge sharing behaviours. However, less research has been conducted on the impact of project sub-cultures in relation to the sharing of knowledge between projects, particularly in project based organizations (PBOs). The unique structures and contexts characterized by PBOs indicate the need to investigate further the impact of cultures present within PBOs and their effect on knowledge sharing. We report on a rich case study of four large Australian-based PBOs whereby the cultural values of these large organizations were seen to impact significantly on whether project teams were more or less likely to improve inter-project knowledge sharing. Furthermore, this research demonstrates the utility of using Cameron and Quinn's (2005) Competing Values Framework to evaluate culture in the context of PBOs
Resumo:
Research in construction innovation highlights construction industry as having many barriers and resistance to innovations and suggests that it needs champions. A hierarchical structural model is presented, to assess the impact of the role of the project manager (PM) on the levels of innovation and project performance. The model adopts the structural equation modelling technique and uses the survey data collected from PMs and project team members working for general contractors in Singapore. The model fits well to the observed data, accounting for 24%, 37% and 49% of the variance in championing behaviour, the level of innovation and project performance, respectively. The results of this study show the importance of the championing role of PMs in construction innovation. However, in order to increase their effectiveness, such a role should be complemented by their competency and professionalism, tactical use of influence tactics, and decision authority. Moreover, senior management should provide adequate resources and a sustained support to innovation and create a conducive environment or organizational culture that nurtures and facilitates the PM’s role in the construction project as a champion of innovation.
Resumo:
Within political and social arenas, prostitution continues to be a highly contested and debated issue. Generally conceptualised as a ‘problem’ in need of eradication, prostitution is strongly linked to immorality and deviance. The methods of addressing this phenomenon have experienced a shift from focusing predominantly on the sex worker, to directly targeting the clients of commercial sex. Such practices have resulted in the creation of policy initiatives such as ‘John Schools’—diversionary programs for clients, or ‘Johns’ who have been arrested for prostitution offences. The programs aim to educate participants on the various harms and risks associated with such behaviour and claim to offer a means to reduce prostitution by targeting the demand for sexual services. It is evident however, that these programs perpetuate traditional social constructions of prostitution, characterising the act, and the actors, as sexually deviant. This paper examines the curriculum of these programs in order to identify how prostitution is constructed—firstly through the depiction of the victims in the program and secondly through the characterisation of prostitution offenders—and argues that such initiatives merely extend the charge of sexual deviance from the sellers of sex to the buyers,whilst failing to acknowledge autonomy and choice for sex workers and clients.
Resumo:
The acquisition and management of knowledge is the dominant source of organisational com-petitive advantage. As innovation processes in the management and procurement of construc-tion activities are becoming increasingly interactive, knowledge management (KM) has been widely recognised by construction organisations as an essential tool to be employed when dealing with growing complexity and cost of projects as well as increasing client demands. KM requires deliberate efforts by an organisation to maximise its performance through the acquisition, dissemination and leveraging of the organisation’s intellectual assets. The Hong Kong (HK) construction market has been described as one of the most open and globally competitive. This paper reports on KM practices within the HK construction industry, and through the analysis of a self-administered questionnaire survey, reveals managers’ opinions of the formal and informal KM practices that could be used to manage the flow of knowledge, and identifies the level of implementation within their organisations. The differences between managers’ perception and the actual state of implementation – as reported by the same man-agers – are statistically examined. The analysis leads to better understanding of how HK con-struction professionals currently manage organisational knowledge, and what areas for poten-tial improvement exist.
Resumo:
There is increasing concern about the impact of employees’ alcohol and other drug (AOD) consumption on workplace safety, particularly within the construction industry. No known study has scientifically evaluated the relationship between the use of drugs and alcohol and safety impacts in construction, and there has been only limited adoption of nationally coordinated strategies, supported by employers and employees to render it socially unacceptable to arrive at a construction workplace with impaired judgment from AODs. This research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. Using the Alcohol Use Disorders Identification Test (AUDIT), the study will adopt both quantitative and qualitative methods to evaluate the extent of general AOD use in the industry. Results indicate that a proportion of the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off score for risky alcohol use with 43 respondents (15%) scoring in the significantly ‘at risk’ category. Other drug use was also identified as a major issue that must be addressed. Results support the need for evidence-based, preventative educational initiatives that are tailored specifically to the construction industry.
Resumo:
The QUT Outdoor Worker Sun Protection (OWSP) project undertook a comprehensive applied health promotion project to demonstrate the effectiveness of sun protection measures which influence high risk outdoor workers in Queensland to adopt sun safe behaviours. The three year project (2010-2013) was driven by two key concepts: 1) The hierarchy of control, which is used to address risks in the workplace, advocates for six control measures that need to be considered in order of priority (refer to Section 3.4.2); and 2) the Ottawa Charter which recommends five action means to achieve health promotion (refer to Section 2.1). The project framework was underpinned by a participatory action research approach that valued peoples’ input, took advantage of existing skills and resources, and stimulated innovation (refer to Section 4.2). Fourteen workplaces (small and large) with a majority outdoor workforce were recruited across regional Queensland (Darling Downs, Northwest, Mackay and Cairns) from four industries types: 1) building and construction, 2) rural and farming, 3) local government, and 4) public sector. A workplace champion was identified at each workplace and was supported (through resource provision, regular contact and site visits) over a 14 to 18 month intervention period to make sun safety a priority in their workplace. Employees and employers were independently assessed for pre- and postintervention sun protection behaviours. As part of the intervention, an individualised sun safety action plan was developed in conjunction with each workplace to guide changes across six key strategy areas including: 1) Policy (e.g., adopt sun safety practices during all company events); 2) Structural and environmental (e.g., shade on worksites; eliminate or minimise reflective surfaces); 3) Personal protective equipment (PPE) (e.g., trial different types of sunscreens, or wide-brimmed hats); 4) Education and awareness (e.g., include sun safety in inductions and toolbox talks; send reminder emails or text messages to workers);5) Role modelling (e.g., by managers, supervisors, workplace champions and mentors); and 6) Skin examinations (e.g., allow time off work for skin checks). The participatory action process revealed that there was no “one size fits all” approach to sun safety in the workplace; a comprehensive, tailored approach was fundamental. This included providing workplaces with information, resources, skills, know how, incentives and practical help. For example, workplaces engaged in farming complete differing seasonal tasks across the year and needed to prepare for optimal sun safety of their workers during less labour intensive times. In some construction workplaces, long pants were considered a trip hazard and could not be used as part of a PPE strategy. Culture change was difficult to achieve and workplace champions needed guidance on the steps to facilitate this (e.g., influencing leaders through peer support, mentoring and role modelling). With the assistance of the project team the majority of workplaces were able to successfully implement the sun safety strategies contained within their action plans, up skilling them in the evidence for sun safety, how to overcome barriers, how to negotiate with all relevant parties and assess success. The most important enablers to the implementation of a successful action plan were a pro-active workplace champion, strong employee engagement, supportive management, the use of highly visual educational resources, and external support (provided by the project team through regular contact either directly through phone calls or indirectly through emails and e-newsletters). Identified barriers included a lack of time, the multiple roles of workplace champions, (especially among smaller workplaces), competing issues leading to a lack of priority for sun safety, the culture of outdoor workers, and costs or budgeting constraints. The level of sun safety awareness, knowledge, and sun protective behaviours reported by the workers increased between pre-and post-intervention. Of the nine sun protective behaviours that were assessed, the largest changes reported included a 26% increase in workers who “usually or always” wore a broad-brimmed hat, a 20% increase in the use of natural shade, a 19% increase in workers wearing long-sleeved collared shirts, and a 16% increase in workers wearing long trousers.
Resumo:
It is well-known that the use of off-site manufacture (OSM) techniques can assist in timely completion of a construction project though the utilisation of such techniques may have other disadvantages. Currently, OSM uptake within the Australian construction industry is limited. To successfully incorporate OSM practices within a construction project, it is crucial to understand the impact of OSM adoption on the processes used during a construction project. This paper presents how a systematic process-oriented approach may be able to support OSM utilisation within a construction project. Process modelling, analysis and automation techniques which are well-known within the Business Process Management (BPM) discipline have been applied to develop a collection of construction process models that represent the end-to-end generic construction value chain. The construction value chain enables researchers to identify key activities, resources, data, and stakeholders involved in construction processes in each defined construction phase. The collection of construction process models is then used as a basis for identification of potential OSM intervention points in collaboration with domain experts from the Australian construction industry. This ensures that the resulting changes reflect the needs of various stakeholders within the construction industry and have relevance in practice. Based on the input from the domain experts, these process models are further refined and operational requirements are taken into account to develop a prototype process automation (workflow) system that can support and coordinate OSM-related process activities. The resulting workflow system also has the potential to integrate with other IT solutions used within the construction industry (e.g., BIM, Acconex). As such, the paper illustrates the role that process-oriented thinking can play in assisting OSM adoption within the industry.