121 resultados para delays


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Traffic congestion has been a growing issue in many metropolitan areas during recent years, which necessitates the identification of its key contributors and development of sustainable strategies to help decrease its adverse impacts on traffic networks. Road incidents generally and crashes specifically have been acknowledged as the cause of a large proportion of travel delays in urban areas and account for 25% to 60% of traffic congestion on motorways. Identifying the critical determinants of travel delays has been of significant importance to the incident management systems which constantly collect and store the incident duration data. This study investigates the individual and simultaneous differential effects of the relevant determinants on motorway crash duration probabilities. In particular, it applies parametric Accelerated Failure Time (AFT) hazard-based models to develop in-depth insights into how the crash-specific characteristic and the associated temporal and infrastructural determinants impact the duration. AFT models with both fixed and random parameters have been calibrated on one year of traffic crash records from two major Australian motorways in South East Queensland and the differential effects of determinants on crash survival functions have been studied on these two motorways individually. A comprehensive spectrum of commonly used parametric fixed parameter AFT models, including generalized gamma and generalized F families, have been compared to random parameter AFT structures in terms of goodness of fit to the duration data and as a result, the random parameter Weibull AFT model has been selected as the most appropriate model. Significant determinants of motorway crash duration included traffic diversion requirement, crash injury type, number and type of vehicles involved in a crash, day of week and time of day, towing support requirement and damage to the infrastructure. A major finding of this research is that the motorways under study are significantly different in terms of crash durations; such that motorway exhibits durations that are on average 19% shorter compared to the durations on motorway. The differential effects of explanatory variables on crash durations are also different on the two motorways. The detailed presented analysis confirms that, looking at the motorway network as a whole, neglecting the individual differences between roads, can lead to erroneous interpretations of duration and inefficient strategies for mitigating travel delays along a particular motorway.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Computer modelling has been used extensively in some processes in the sugar industry to achieve significant gains. This paper reviews the investigations carried out over approximately the last twenty five years, including the successes but also areas where problems and delays have been encountered. In that time the capability of both hardware and software have increased dramatically. For some processes such as cane cleaning, cane billet preparation, and sugar drying, the application of computer modelling towards improved equipment design and operation has been quite limited. A particular problem has been the large number of particles and particle interactions in these…

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Objective Chest pain is one of the most common complaints in patients presenting to an emergency department. Delays in management due to a lack of readily available objective tests to risk stratify patients with possible acute coronary syndromes can lead to an unnecessarily lengthy admission placing pressure on hospital beds or inappropriate discharge. The need for a co-ordinated system of clinical management based on enhanced communication between departments, timely and appropriate triage, clinical investigation, diagnosis, and treatment was identified. Methods An evidence-based Chest Pain Management Service and clinical pathway were developed and implemented, including the introduction of after-hours exercise stress testing. Results Between November 2005 and March 2013, 5662 patients were managed according to a Chest Pain Management pathway resulting in a reduction of 5181 admission nights by more timely identification of patients at low risk who could then be discharged. In addition, 1360 days were avoided in high-risk patients who received earlier diagnosis and treatment. Conclusions The creation of a Chest Pain Management pathway and the extended exercise stress testing service resulted in earlier discharge for low-risk patients; and timely treatment for patients with positive and equivocal exercise stress test results. This service demonstrated a significant saving in overnight admissions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background Corneal oedema is a common post-operative problem that delays or prevents visual recovery from ocular surgery. Honey is a supersaturated solution of sugars with an acidic pH, high osmolarity and low water content. These characteristics inhibit the growth of micro-organisms, reduce oedema and promote epithelialisation. This clinical case series describes the use of a regulatory approved Leptospermum species honey ophthalmic product, in the management of post-operative corneal oedema and bullous keratopathy. Methods A retrospective review of 18 consecutive cases (30 eyes) with corneal oedema persisting beyond one month after single or multiple ocular surgical procedures (phacoemulsification cataract surgery and additional procedures) treated with Optimel Antibacterial Manuka Eye Drops twice to three times daily as an adjunctive therapy to conventional topical management with corticosteroid, aqueous suppressants, hypertonic sodium chloride five per cent, eyelid hygiene and artificial tears. Visual acuity and central corneal thickness were measured before and at the conclusion of Optimel treatment. Results A temporary reduction in corneal epithelial oedema lasting up to several hours was observed after the initial Optimel instillation and was associated with a reduction in central corneal thickness, resolution of epithelial microcysts, collapse of epithelial bullae, improved corneal clarity, improved visualisation of the intraocular structures and improved visual acuity. Additionally, with chronic use, reduction in punctate epitheliopathy, reduction in central corneal thickness and improvement in visual acuity were achieved. Temporary stinging after Optimel instillation was experienced. No adverse infectious or inflammatory events occurred during treatment with Optimel. Conclusions Optimel was a safe and effective adjunctive therapeutic strategy in the management of persistent post-operative corneal oedema and warrants further investigation in clinical trials.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In open-cut strip mining, waste material is placed in-pit to minimise operational mine costs. Slope failures in these spoil piles pose a significant safety risk to personnel, along with a financial risk from loss of equipment and scheduling delays. It has been observed that most spoil pile failures occur when the pit has been previously filled with water and then subsequently dewatered. The failures are often initiated at the base of spoil piles where the material can undergo significant slaking (disintegration) over time due to overburden pressure and water saturation. It is important to understand how the mechanical properties of base spoil material are affected by slaking when designing safe spoil pile slope angles, heights, and dewatering rates. In this study, fresh spoil material collected from a coal mine in Brown Basin Coalfield of Queensland, Australia was subjected to high overburden pressure (0 – 900 kPa) under saturated condition and maintained over a period of time (0 – 6 months) allowing the material to slake. To create the above conditions, laboratory designed pressure chambers were used. Once a spoil sample was slaked under certain overburden pressure over a period of time, it was tested for classification, permeability, and strength properties. Results of this testing program suggested that the slaking of saturated coal mine spoil increase with overburden pressure and the time duration over which the overburden pressure was maintained. Further, it was observed that shear strength and permeability of spoil decreased with increase in spoil slaking.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Post-traumatic stress disorder (PTSD) is a debilitating psychiatric disorder that has a major impact on the ability to function effectively in daily life. PTSD may develop as a response to exposure to an event or events perceived as potentially harmful or life-threatening. It has high prevalence rates in the community, especially among vulnerable groups such as military personnel or those in emergency services. Despite extensive research in this field, the underlying mechanisms of the disorder remain largely unknown. The identification of risk factors for PTSD has posed a particular challenge as there can be delays in onset of the disorder, and most people who are exposed to traumatic events will not meet diagnostic criteria for PTSD. With the advent of the Diagnostic and Statistical Manual of Mental Disorders, Fifth Edition (DSM V), the classification for PTSD has changed from an anxiety disorder into the category of stress- and trauma-related disorders. This has the potential to refocus PTSD research on the nature of stress and the stress response relationship. This review focuses on some of the important findings from psychological and biological research based on early models of stress and resilience. Improving our understanding of PTSD by investigating both genetic and psychological risk and coping factors that influence stress response, as well as their interaction, may provide a basis for more effective and earlier intervention.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Ramp metering (RM) is an access control for motorways, in which a traffic signal is placed at on-ramps to regulate the rate of vehicles entering the motorway and thus to preserve the motorway capacity. In general, RM algorithms fall into two categories by their effective scope: local control and coordinated control. Local control algorithm determines the metering rate based on the traffic condition on adjacent motorway mainline and the on-ramp. Conversely, coordinated RM strategies make use of measurements from the entire motorway network to operate individual ramp signals for optimal performance at the network level. This study proposes a multi-hierarchical strategy for on-ramp coordination. The strategy is structured in two layers. At the higher layer, a centralised, predictive controller plans the coordination control within a long update interval based on the location of high-risk breakdown flow. At the lower layer, reactive controllers determine the metering rates of those ramps involved in the ramp coordination with a short update interval. This strategy is modelled and applied to the northbound model of the Pacific Motorway in a micro-simulation platform (AIMSUN). The simulation results show that the proposed strategy effectively delays the onset of congestion and reduces total congestion with better managed on-ramp queues.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research was undertaken to encompass and identify challenges and impact factors that affect the successful outcomes of heritage building projects, especially those related to finding major causes of delays and cost overruns across projects in all Australian states. This project determined and analysed the causes of such delays and programme issues emanating from the planning and execution phases, whilst also analysing the requirements for management of multiple stakeholder relationships and the influence of unforeseen technical factors. The research proposes "call for action" guidance and was validated by experienced experts in heritage building projects in Australia. The proposed guidance is designed to ensure that realistic cost targets and delivery timeframes are set in future heritage projects, and necessary interventions made at appropriate project stages to ensure decisions are made that will help to prevent overtime and cost overuns.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Cities and urban spaces around the world are changing rapidly from their origins in the industrialising world to a post-industrial, hard wired landscape. A further embellishment is the advent of mobile media technologies supported by both existing and new communications and computing technology which claim to put the urban dweller at the heart of a new, informed and ‘liberated’ seat of participatory urban governance. This networked, sensor enabled society permits flows of information in a multitude of directions ostensibly empowering the citizenry through ‘smart’ installations such as ‘talking bus stops’ detailing services, delays, transport interconnections and even weather conditions along desired routes. However, while there is considerable potential for creative and transformative kinds of citizen participation, there is also the momentum for ‘function-creep’, whereby vast amounts of data are garnered in a broad application of urban surveillance. This kind of monitoring and capacity for surveillance connects with attempts by civic authorities to regulate, restrict, rebrand and reframe urban public spaces into governable and predictable arenas of consumption. This article considers questions around the possibilities for retaining and revitalising forms of urban citizenship, set in the context of Marshall’s original premise of civil, social and political citizenship(s) in the middle of the last century, following World War Two and the coming of the modern welfare state.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Sonographic diagnosis of appendicitis in children is an important clinical tool, often obviating the need for potentially harmful ionising radiation from computed tomography (CT) scans and unnecessary appendectomies. Established criteria do not commonly account for the sonographic secondary signs of acute appendicitis as an adjunct or corollary to an identifiably inflamed appendix. If one of, or combinations of these secondary signs are a reliable positive and/or negative indicator of the condition, diagnostic accuracy may be improved. This will be of particular importance in cases where the appendix cannot be easily identified, possibly providing referring clinicians with a less equivocal diagnosis. Acute appendicitis (AA) is the most common emergency presentation requiring surgical intervention among both adults and children. During 2010-11 in Australia 25000 appendicectomies were performed on adults and children, more than double the number of the next most common surgical procedure [1]. Ultrasound has been commonly used to diagnose AA since the 1980s, however the best imaging modality or combination of modalities to accurately and cost-effectively diagnose the condition is still debated. A study by Puylaert advocated ultrasound in all presentations [2], whereas others suggested it only as a first line modality [3–5]. Conversely, York et al state that it is not appropriate as it delays treatment [6]. CT has been shown to more accurately diagnose AA than ultrasound, however its inherent radiation risks warrant cautionary use in children [7]. Improved accuracy in the diagnosis of suspected AA using ultrasound would enable surgeons to make a decision without the need to expose children to the potentially harmful effects of CT. Secondary signs of appendicitis are well established [8], although research into their predictive values has only recently been undertaken [9,10] indicating their potential diagnostic benefit in the absence of an identifiable appendix. The purpose of this review is to examine the history of appendiceal sonography, established sonographic criteria, paediatric specific techniques and the predictive value of secondary signs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background Children with developmental coordination disorder (DCD) face evident motor difficulties in daily functioning. Little is known, however, about their difficulties in specific activities of daily living (ADL). Objective The purposes of this study were: (1) to investigate differences between children with DCD and their peers with typical development for ADL performance, learning, and participation, and (2) to explore the predictive values of these aspects. Design. This was a cross-sectional study. Methods In both a clinical sample of children diagnosed with DCD (n=25 [21 male, 4 female], age range=5-8 years) and a group of peers with typical development (25 matched controls), the children’s parents completed the DCDDaily-Q. Differences in scores between the groups were investigated using t tests for performance and participation and Pearson chi-square analysis for learning. Multiple regression analyses were performed to explore the predictive values of performance, learning, and participation. Results Compared with their peers, children with DCD showed poor performance of ADL and less frequent participation in some ADL. Children with DCD demonstrated heterogeneous patterns of performance (poor in 10%-80% of the items) and learning (delayed in 0%-100% of the items). In the DCD group, delays in learning of ADL were a predictor for poor performance of ADL, and poor performance of ADL was a predictor for less frequent participation in ADL compared with the control group. Limitations A limited number of children with DCD were addressed in this study. Conclusions This study highlights the impact of DCD on children’s daily lives and the need for tailored intervention.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The sugarcane transport system plays a critical role in the overall performance of Australia’s sugarcane industry. An inefficient sugarcane transport system interrupts the raw sugarcane harvesting process, delays the delivery of sugarcane to the mill, deteriorates the sugar quality, increases the usage of empty bins, and leads to the additional sugarcane production costs. Due to these negative effects, there is an urgent need for an efficient sugarcane transport schedule that should be developed by the rail schedulers. In this study, a multi-objective model using mixed integer programming (MIP) is developed to produce an industry-oriented scheduling optimiser for sugarcane rail transport system. The exact MIP solver (IBM ILOG-CPLEX) is applied to minimise the makespan and the total operating time as multi-objective functions. Moreover, the so-called Siding neighbourhood search (SNS) algorithm is developed and integrated with Sidings Satisfaction Priorities (SSP) and Rail Conflict Elimination (RCE) algorithms to solve the problem in a more efficient way. In implementation, the sugarcane transport system of Kalamia Sugar Mill that is a coastal locality about 1050 km northwest of Brisbane city is investigated as a real case study. Computational experiments indicate that high-quality solutions are obtainable in industry-scale applications.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper addresses an output feedback control problem for a class of networked control systems (NCSs) with a stochastic communication protocol. Under the scenario that only one sensor is allowed to obtain the communication access at each transmission instant, a stochastic communication protocol is first defined, where the communication access is modelled by a discrete-time Markov chain with partly unknown transition probabilities. Secondly, by use of a network-based output feedback control strategy and a time-delay division method, the closed-loop system is modeled as a stochastic system with multi time-varying delays, where the inherent characteristic of the network delay is well considered to improve the control performance. Then, based on the above constructed stochastic model, two sufficient conditions are derived for ensuring the mean-square stability and stabilization of the system under consideration. Finally, two examples are given to show the effectiveness of the proposed method.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background Poor clinical handover has been associated with inaccurate clinical assessment and diagnosis, delays in diagnosis and test ordering, medication errors and decreased patient satisfaction in the acute care setting. Research on the handover process in the residential aged care sector is very limited. Purpose The aims of this study were to: (i) Develop an in-depth understanding of the handover process in aged care by mapping all the key activities and their information dynamics, (ii) Identify gaps in information exchange in the handover process and analyze implications for resident safety, (iii) Develop practical recommendations on how information communication technology (ICT) can improve the process and resident safety. Methods The study was undertaken at a large metropolitan facility in NSW with more than 300 residents and a staff including 55 registered nurses (RNs) and 146 assistants in nursing (AINs). A total of 3 focus groups, 12 interviews and 3 observation sessions were conducted over a period from July to October 2010. Process mapping was undertaken by translating the qualitative data via a five-category code book that was developed prior to the analysis. Results Three major sub-processes were identified and mapped. The three major stages are Handover process (HOP) I “Information gathering by RN”, HOP II “Preparation of preliminary handover sheet” and HOP III “Execution of handover meeting”. Inefficient processes were identified in relation to the handover including duplication of information, utilization of multiple communication modes and information sources, and lack of standardization. Conclusion By providing a robust process model of handover this study has made two critical contributions to research in aged care: (i) a means to identify important, possibly suboptimal practices; and (ii) valuable evidence to plan and improve ICT implementation in residential aged care. The mapping of this process enabled analysis of gaps in information flow and potential impacts on resident safety. In addition it offers the basis for further studies into a process that, despite its importance for securing resident safety and continuity of care, lacks research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The emergence of multiple satellite navigation systems, including BDS, Galileo, modernized GPS, and GLONASS, brings great opportunities and challenges for precise point positioning (PPP). We study the contributions of various GNSS combinations to PPP performance based on undifferenced or raw observations, in which the signal delays and ionospheric delays must be considered. A priori ionospheric knowledge, such as regional or global corrections, strengthens the estimation of ionospheric delay parameters. The undifferenced models are generally more suitable for single-, dual-, or multi-frequency data processing for single or combined GNSS constellations. Another advantage over ionospheric-free PPP models is that undifferenced models avoid noise amplification by linear combinations. Extensive performance evaluations are conducted with multi-GNSS data sets collected from 105 MGEX stations in July 2014. Dual-frequency PPP results from each single constellation show that the convergence time of undifferenced PPP solution is usually shorter than that of ionospheric-free PPP solutions, while the positioning accuracy of undifferenced PPP shows more improvement for the GLONASS system. In addition, the GLONASS undifferenced PPP results demonstrate performance advantages in high latitude areas, while this impact is less obvious in the GPS/GLONASS combined configuration. The results have also indicated that the BDS GEO satellites have negative impacts on the undifferenced PPP performance given the current “poor” orbit and clock knowledge of GEO satellites. More generally, the multi-GNSS undifferenced PPP results have shown improvements in the convergence time by more than 60 % in both the single- and dual-frequency PPP results, while the positioning accuracy after convergence indicates no significant improvements for the dual-frequency PPP solutions, but an improvement of about 25 % on average for the single-frequency PPP solutions.