541 resultados para asymptotic local power
Resumo:
A small group of companies including Intel, Microsoft, and Cisco have used "platform leadership" with great effect as a means for driving innovation and accelerating market growth within their respective industries. Prior research in this area emphasizes that trust plays a critical role in the success of this strategy. However, many of the categorizations of trust discussed in the literature tend to ignore or undervalue the fact that trust and power are often functionally equivalent, and that the coercion of weaker partners is sometimes misdiagnosed as collaboration. In this paper, I use case study data focusing on Intel's shift from ceramic/wire-bonded packaging to organic/C4 packaging to characterize the relationships between Intel and its suppliers, and to determine if these links are based on power in addition to trust. The case study shows that Intel's platform leadership strategy is built on a balance of both trust and a relatively benevolent form of power that is exemplified by the company's "open kimono" principle, through which Intel insists that suppliers share detailed financial data and highly proprietary technical information to achieve mutually advantageous objectives. By explaining more completely the nature of these inter-firm linkages, this paper usefully extends our understanding of how platform leadership is maintained by Intel, and contributes to the literature by showing how trust and power can be used simultaneously within an inter-firm relationship in a way that benefits all of the stakeholders.
Resumo:
In this paper, the placement of sectionalizers, as well as, a cross-connection is optimally determined so that the objective function is minimized. The objective function employed in this paper consists of two main parts, the switch cost and the reliability cost. The switch cost is composed of the cost of sectionalizers and cross-connection and the reliability cost is assumed to be proportional to a reliability index, SAIDI. To optimize the allocation of sectionalizers and cross-connection problem realistically, the cost related to each element is considered as discrete. In consequence of binary variables for the availability of sectionalizers, the problem is extremely discrete. Therefore, the probability of local minimum risk is high and a heuristic-based optimization method is needed. A Discrete Particle Swarm Optimization (DPSO) is employed in this paper to deal with this discrete problem. Finally, a testing distribution system is used to validate the proposed method.
Resumo:
Decentralized and regional load-frequency control of power systems operating in normal and near-normal conditions has been well studied; and several analysis/synthesis approaches have been developed during the last few decades. However in contingency and off-normal conditions, the existing emergency control plans, such as under-frequency load shedding, are usually applied in a centralized structure using a different analysis model. This paper discusses the feasibility of using frequency-based emergency control schemes based on tie-line measurements and local information available within a control area. The conventional load-frequency control model is generalized by considering the dynamics of emergency control/protection schemes and an analytic approach to analyze the regional frequency response under normal and emergency conditions is presented.
Resumo:
Understanding micropolitics has become an important part of understanding leadership and power relations within schools. In this paper we review some of the pertinent literature and writing in the field, particularly as it relates to school leadership. Drawing on a couple of existing models, we present a new model that highlights three central power-based leadership approaches—‘power with’, ‘power through’ and ‘power over’. We put forward two contrasting vignettes that reveal a variety of micropolitical strategies used by school principals in the governance of their schools. These strategies range from favouritism and control at one end to empowerment and collaboration at the other. The vignettes are analysed in the light of the model and micropolitical literature presented in this article.
Resumo:
This article investigates work related learning and development amongst mature aged workers from a lifespan developmental psychology perspective. The current study follows on from research regarding the construction and revision of the Learning and Development Survey (LDS; Tones & Pillay, 2008). Designed to measure adaptive development for work related learning, the revised LDS (R-LDS) encompasses goal selection, engagement and disengagement from individual and organisational perspectives. Previous survey findings from a mixed age sample of local government workers suggest that mature aged workers aged over 45 years are less likely to report engagement in learning and development goals than younger workers, which is partly due to insufficient opportunities at work. In the current paper, exploratory factor analysis was used to investigate responses to the R-LDS amongst two groups of mature aged workers from a local government (LG) and private healthcare (PH) organisation to determine the stability of the R-LDS. Organisational constraints to development accounted for almost a quarter of the variance in R-LDS scores for both samples, while remaining factors emerged in different orders for each data set. Organisational opportunities for development explained about 17% of the variance in R-LDS scores in the LG sample, while the individual goal disengagement factor contributed a comparable proportion of variance to R-LDS scores for the PH sample. Findings from the current study indicate that opportunities for learning and development at work may be age structured and biased towards younger workers. Implications for professional practice are discussed and focus on improving the engagement of mature aged workers.
Resumo:
The requirement for improved efficiency whilst maintaining system security necessitates the development of improved system analysis approaches and the development of advanced emergency control technologies. Load shedding is a type of emergency control that is designed to ensure system stability by curtailing system load to match generation supply. This paper presents a new adaptive load shedding scheme that provides emergency protection against excess frequency decline, whilst minimizing the risk of line overloading. The proposed load shedding scheme uses the local frequency rate information to adapt the load shedding behaviour to suit the size and location of the experienced disturbance. The proposed scheme is tested in simulation on a 3-region, 10-generator sample system and shows good performance.
Resumo:
Planar busbar is a good candidate to reduce interconnection inductance in high power inverters compared with cables. However, power switching components with fast switching combined with hard switched-converters produce high di/dt during turn off time and busbar stray inductance then becomes an important issue which creates overvoltage. It is necessary to keep the busbar stray inductance as low as possible to decrease overvoltage and Electromagnetic Interference (EMI) noise. In this paper, the effect of different transient current loops on busbar physical structure of the high-voltage high-level diode-clamped converters will be highlighted. Design considerations of proper planar busbar will also be presented to optimise the overall design of diode-clamped converters.
Resumo:
In public venues, crowd size is a key indicator of crowd safety and stability. Crowding levels can be detected using holistic image features, however this requires a large amount of training data to capture the wide variations in crowd distribution. If a crowd counting algorithm is to be deployed across a large number of cameras, such a large and burdensome training requirement is far from ideal. In this paper we propose an approach that uses local features to count the number of people in each foreground blob segment, so that the total crowd estimate is the sum of the group sizes. This results in an approach that is scalable to crowd volumes not seen in the training data, and can be trained on a very small data set. As a local approach is used, the proposed algorithm can easily be used to estimate crowd density throughout different regions of the scene and be used in a multi-camera environment. A unique localised approach to ground truth annotation reduces the required training data is also presented, as a localised approach to crowd counting has different training requirements to a holistic one. Testing on a large pedestrian database compares the proposed technique to existing holistic techniques and demonstrates improved accuracy, and superior performance when test conditions are unseen in the training set, or a minimal training set is used.
Resumo:
This report focuses on risk-assessment practices in the private rental market, with particular consideration of their impact on low-income renters. It is based on the fieldwork undertaken in the second stage of the research process that followed completion of the Positioning Paper. The key research question this study addressed was: What are the various factors included in ‘risk-assessments’ by real estate agents in allocating ‘affordable’ tenancies? How are these risks quantified and managed? What are the key outcomes of their decision-making? The study builds on previous research demonstrating that a relatively large proportion of low-cost private rental accommodation is occupied by moderate- to high-income households (Wulff and Yates 2001; Seelig 2001; Yates et al. 2004). This is occurring in an environment where the private rental sector is now the de facto main provider of rental housing for lower-income households across Australia (Seelig et al. 2005) and where a number of factors are implicated in patterns of ‘income–rent mismatching’. These include ongoing shifts in public housing assistance; issues concerning eligibility for rent assistance; ‘supply’ factors, such as loss of low-cost rental stock through upgrading and/or transfer to owner-occupied housing; patterns of supply and demand driven largely by middle- to high-income owner-investors and renters; and patterns of housing need among low-income households for whom affordable housing is not appropriate. In formulating a way of approaching the analysis of ‘risk-assessment’ in rental housing management, this study has applied three sociological perspectives on risk: Beck’s (1992) formulation of risk society as entailing processes of ‘individualisation’; a socio-cultural perspective which emphasises the situated nature of perceptions of risk; and a perspective which has drawn attention to different modes of institutional governance of subjects, as ‘carriers of specific indicators of risk’. The private rental market was viewed as a social institution, and the research strategy was informed by ‘institutional ethnography’ as a method of enquiry. The study was based on interviews with property managers, real estate industry representatives, tenant advocates and community housing providers. The primary focus of inquiry was on ‘the moment of allocation’. Six local areas across metropolitan and regional Queensland, New South Wales, and South Australia were selected as case study localities. In terms of the main findings, it is evident that access to private rental housing is not just a matter of ‘supply and demand’. It is also about assessment of risk among applicants. Risk – perceived or actual – is thus a critical factor in deciding who gets housed, and how. Risk and its assessment matter in the context of housing provision and in the development of policy responses. The outcomes from this study also highlight a number of salient points: 1.There are two principal forms of risk associated with property management: financial risk and risk of litigation. 2. Certain tenant characteristics and/or circumstances – ability to pay and ability to care for the rented property – are the main factors focused on in assessing risk among applicants for rental housing. Signals of either ‘(in)ability to pay’ and/or ‘(in)ability to care for the property’ are almost always interpreted as markers of high levels of risk. 3. The processing of tenancy applications entails a complex and variable mix of formal and informal strategies of risk-assessment and allocation where sorting (out), ranking, discriminating and handing over characterise the process. 4. In the eyes of property managers, ‘suitable’ tenants can be conceptualised as those who are resourceful, reputable, competent, strategic and presentable. 5. Property managers clearly articulated concern about risks entailed in a number of characteristics or situations. Being on a low income was the principal and overarching factor which agents considered. Others included: - unemployment - ‘big’ families; sole parent families - domestic violence - marital breakdown - shift from home ownership to private rental - Aboriginality and specific ethnicities - physical incapacity - aspects of ‘presentation’. The financial vulnerability of applicants in these groups can be invoked, alongside expressed concerns about compromised capacities to manage income and/or ‘care for’ the property, as legitimate grounds for rejection or a lower ranking. 6. At the level of face-to-face interaction between the property manager and applicants, more intuitive assessments of risk based upon past experience or ‘gut feelings’ come into play. These judgements are interwoven with more systematic procedures of tenant selection. The findings suggest that considerable ‘risk’ is associated with low-income status, either directly or insofar as it is associated with other forms of perceived risk, and that such risks are likely to impede access to the professionally managed private rental market. Detailed analysis suggests that opportunities for access to housing by low-income householders also arise where, for example: - the ‘local experience’ of an agency and/or property manager works in favour of particular applicants - applicants can demonstrate available social support and financial guarantors - an applicant’s preference or need for longer-term rental is seen to provide a level of financial security for the landlord - applicants are prepared to agree to specific, more stringent conditions for inspection of properties and review of contracts - the particular circumstances and motivations of landlords lead them to consider a wider range of applicants - In particular circumstances, property managers are prepared to give special consideration to applicants who appear worthy, albeit ‘risky’. The strategic actions of demonstrating and documenting on the part of vulnerable (low-income) tenant applicants can improve their chances of being perceived as resourceful, capable and ‘savvy’. Such actions are significant because they help to persuade property managers not only that the applicant may have sufficient resources (personal and material) but that they accept that the onus is on themselves to show they are reputable, and that they have valued ‘competencies’ and understand ‘how the system works’. The parameters of the market do shape the processes of risk-assessment and, ultimately, the strategic relation of power between property manager and the tenant applicant. Low vacancy rates and limited supply of lower-cost rental stock, in all areas, mean that there are many more tenant applicants than available properties, creating a highly competitive environment for applicants. The fundamental problem of supply is an aspect of the market that severely limits the chances of access to appropriate and affordable housing for low-income rental housing applicants. There is recognition of the impact of this problem of supply. The study indicates three main directions for future focus in policy and program development: providing appropriate supports to tenants to access and sustain private rental housing, addressing issues of discrimination and privacy arising in the processes of selecting suitable tenants, and addressing problems of supply.
Resumo:
Aim To measure latitude-related body size variation in field-collected Paropsis atomaria Olivier (Coleoptera: Chrysomelidae) individuals and to conduct common-garden experiments to determine whether such variation is due to phenotypic plasticity or local adaptation. Location Four collection sites from the east coast of Australia were selected for our present field collections: Canberra (latitude 35°19' S), Bangalow (latitude 28°43' S), Beerburrum (latitude 26°58' S) and Lowmead (latitude 24°29' S). Museum specimens collected over the past 100 years and covering the same geographical area as the present field collections came from one state, one national and one private collection. Methods Body size (pronotum width) was measured for 118 field-collected beetles and 302 specimens from collections. We then reared larvae from the latitudinal extremes (Canberra and Lowmead) to determine whether the size cline was the result of phenotypic plasticity or evolved differences (= local adaptation) between sites. Results Beetles decreased in size with increasing latitude, representing a converse Bergmann cline. A decrease in developmental temperature produced larger adults for both Lowmead (low latitude) and Canberra (high latitude) individuals, and those from Lowmead were larger than those from Canberra when reared under identical conditions. Main conclusions The converse Bergmann cline in P. atomaria is likely to be the result of local adaptation to season length.
Resumo:
Workflow Management Systems (WfMSs) enable the development and maintenance of workflow specifications at design time and their execution and monitoring at runtime. The open source WfMS YAWL supports the YAWL language – a formally defined language based on Petri nets which offers comprehensive support for control-flow and resource patterns. In addition, the YAWL system provides extensive support for process flexibility, in particular for process configuration, exception handling, dynamic workflow and declarative workflow. Due to its formal foundation, sophisticated verification support can also be achieved. This paper presents the YAWL system and its main applications.
Resumo:
Spatial information captured from optical remote sensors on board unmanned aerial vehicles (UAVs) has great potential in automatic surveillance of electrical infrastructure. For an automatic vision-based power line inspection system, detecting power lines from a cluttered background is one of the most important and challenging tasks. In this paper, a novel method is proposed, specifically for power line detection from aerial images. A pulse coupled neural filter is developed to remove background noise and generate an edge map prior to the Hough transform being employed to detect straight lines. An improved Hough transform is used by performing knowledge-based line clustering in Hough space to refine the detection results. The experiment on real image data captured from a UAV platform demonstrates that the proposed approach is effective for automatic power line detection.
Resumo:
Light Detection and Ranging (LIDAR) has great potential to assist vegetation management in power line corridors by providing more accurate geometric information of the power line assets and vegetation along the corridors. However, the development of algorithms for the automatic processing of LIDAR point cloud data, in particular for feature extraction and classification of raw point cloud data, is in still in its infancy. In this paper, we take advantage of LIDAR intensity and try to classify ground and non-ground points by statistically analyzing the skewness and kurtosis of the intensity data. Moreover, the Hough transform is employed to detected power lines from the filtered object points. The experimental results show the effectiveness of our methods and indicate that better results were obtained by using LIDAR intensity data than elevation data.
Resumo:
Since 2001, district governments have had the main responsibility for providing public health care in Indonesia. One of the main public health challenges facing many district governments is improving nutritional standards, particularly among poorer segments of the population. Developing effective policies and strategies for improving nutrition requires a multi-sectoral approach encompassing agricultural development policy, access to markets, food security (storage) programs, provision of public health facilities, and promotion of public awareness of nutritional health. This implies a strong need for a coordinated approach involving multiple government agencies at the district level. Due to diverse economic, agricultural, and infrastructure conditions across the country, district governments’ ought to be better placed than central government both to identify areas of greatest need for public nutrition interventions, and devise policies that reflect local characteristics. However, in the two districts observed in this study—Bantul and Gunungkidul—it was clear that local government capacity to generate, obtain and integrate evidence about local conditions into the policy-making process was still limited. In both districts, decision-makers tended to rely more on intuition,anecdote, and precedent in formulating policy. The potential for evidence-based decision making was also severely constrained by a lack of coordination and communication between agencies, and current arrangements related to central government fiscal transfers, which compel local governments to allocate funding to centrally determined programs and priorities.