498 resultados para android, ios, multi-piaffatorma, applicazione mobile
Resumo:
Under the Alien Tort Statute United States of America (“America”) Federal Courts have the jurisdiction to hear claims for civil wrongs, committed against non-American citizens, which were perpetrated outside America’s national borders. The operation of this law has confronted American Federal Courts with difficulties on how to manage conflicts between American executive foreign policy and judicial interpretations of international law. Courts began to pass judgment over conduct which was approved by foreign governments. Then in 2005 the American Supreme Court wound back the scope of the Alien Tort Statute. This article will review the problems with the expansion of the Alien Tort Statute and the reasons for its subsequent narrowing.
Resumo:
This is the final report of research project 2002-057-C: Enabling Team Collaboration with Pervasive and Mobile Computing. The research project was carried out by the Australian Cooperative Research Centre for Construction Innovation and has two streams that consider the use of pervasive computing technologies in two different contexts. The first context was the on-site deployment of mobile computing devices, where as the second context was the use and development of intelligent rooms based on sensed environments and new human-computer interfaces (HCI) for collaboration in the design office. The two streams present a model of team collaboration that relies on continues communication to people and information to reduce information leakage. This report consists of five sections: (1) Introduction; (2) Research Project Background; (3) Project Implementation; (4) Case Studies and Outcomes; and (5) Conclusion and Recommendation. Introduction in Section 1 presents a brief description of the research project including general research objectives and structure. Section 2 introduces the background of the research and detailed information regarding project participants, objectives and significance, and also research methodology. Review of all research activities such as literature review and case studies are summarised in Project Implementation in Section 3. Following this, in Section 4 the report then focuses on analysing the case studies and presents their outcomes. Conclusion and recommendation of the research project are summarised in Section 5. Other information to support the content of the report such as research project schedule is provided in Appendices. The purpose of the final project report is to provide industry partners with detailed information on the project activities and methodology such as the implementation of pervasive computing technologies in the real contexts. The report summarises the outcomes of the case studies and provides necessary recommendation to industry partners of using new technologies to support better project collaboration.
Resumo:
This project report presents the results of a study on wireless communication data transfer rates for a mobile device running a custombuilt construction defect reporting application. The study measured the time taken to transmit data about a construction defect, which included digital imagery and text, in order to assess the feasibility of transferring various types and sizes of data and the ICT-supported construction management applications that could be developed as a consequence. Data transfer rates over GPRS through the Telstra network and WiFi over a private network were compared. Based on the data size and data transfer time, the rate of transfer was calculated to determine the actual data transmission speeds at which the information was being sent using the wireless mobile communication protocols. The report finds that the transmission speeds vary considerably when using GPRS and can be significantly slower than what is advertised by mobile network providers. While WiFi is much faster than GPRS, the limited range of WiFi limits the protocol to residential-scale construction sites.
Resumo:
Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.
Resumo:
The application of Information and Communication Technology (ICT) in construction industry has been recognised widely by some practitioners and researchers for the last several years. During the 1990s the international construction industry started using with the increasing confidence information and communication technology. The use of e-mail became usual and web-sites were established for marketing purposes. Intranets and extranets were also established to facilitate communication within companies and throughout their branches. One of the important applications of the ICT in construction industry was the use of mobile computing devices to achieve better communication and data transmission between construction sites and offices.
Resumo:
Sending data between the construction site and an off-site design office is one of the more problematic areas in information technology for construction automation, particularly for construction defect management. The aim of this research is to investigate how mobile computing and new forms of human-computer interaction can be brought to bear on specific problems in construction management. The construction defect reporting system is one such application. Combining mobile and wireless computing technologies with a digital workbench, we have developed a system to facilitate remote telecollaboration between a construction site and an off-site engineering office. The application reported in this paper demonstrates how construction defect reporting can be streamlined by field collection of construction defect information using a mobile device and visualising the defect in a CAD model on a digital workbench in an engineering office. This paper reports on the design of the system and our tests of sending images from the construction site to the engineer’s office and positional accuracy of GPS for localization of the defect.
Resumo:
Worldwide, the current pattern of urban development is unsustainable and metropolitan planning and development strategies deliver poor environmental outcomes in relation to energy production. As a result, an increasing number of governments and private sector development companies are initiating projects that aim to deliver enhanced environmental outcomes rather than a ‘business as usual’ approach. This paper will summarise the findings from a study that explored the link between building orientation and energy efficiencies in sub-tropical and tropical climates. The study used a new thermal modelling software tool developed by CSIRO that responds more accurately to residential heating and cooling energy performance in those climate zones. This software tool responds to industry criticisms regarding cold climate modelling systems that do not make sufficient allowance for natural ventilation. The study examined a range of low, medium and high-density dwelling types and investigated the impact of orientation, insulation, ventilation and shading devices on energy efficiencies. This paper will examine the findings from the medium and high-density case study developments as these are relevant to residential developments in many South East Asian countries, such as Singapore, Hong Kong and Malaysia. Finally, the paper will explore the potential benefits that medium and high-density residential developments have in the development of ‘solar cities’ and ‘solar suburbs’.
Resumo:
This paper aims to develop the methodology and strategy for concurrent finite element modeling of civil infrastructures at the different scale levels for the purposes of analyses of structural deteriorating. The modeling strategy and method were investigated to develop the concurrent multi-scale model of structural behavior (CMSM-of-SB) in which the global structural behavior and nonlinear damage features of local details in a large complicated structure could be concurrently analyzed in order to meet the needs of structural-state evaluation as well as structural deteriorating. In the proposed method, the “large-scale” modeling is adopted for the global structure with linear responses between stress and strain and the “small-scale” modeling is available for nonlinear damage analyses of the local welded details. A longitudinal truss in steel bridge decks was selected as a case to study how a CMSM-of-SB was developed. The reduced-scale specimen of the longitudinal truss was studied in the laboratory to measure its dynamic and static behavior in global truss and local welded details, while the multi-scale models using constraint equations and substructuring were developed for numerical simulation. The comparison of dynamic and static response between the calculated results by different models indicated that the proposed multi-scale model was found to be the most efficient and accurate. The verification of the model with results from the tested truss under the specific loading showed that, responses at the material scale in the vicinity of local details as well as structural global behaviors could be obtained and fit well with the measured results. The proposed concurrent multi-scale modeling strategy and implementation procedures were applied to Runyang cable-stayed bridge (RYCB) and the CMSM-of-SB of the bridge deck system was accordingly constructed as a practical application.
Resumo:
This paper is a continuation of the paper titled “Concurrent multi-scale modeling of civil infrastructure for analyses on structural deteriorating—Part I: Modeling methodology and strategy” with the emphasis on model updating and verification for the developed concurrent multi-scale model. The sensitivity-based parameter updating method was applied and some important issues such as selection of reference data and model parameters, and model updating procedures on the multi-scale model were investigated based on the sensitivity analysis of the selected model parameters. The experimental modal data as well as static response in terms of component nominal stresses and hot-spot stresses at the concerned locations were used for dynamic response- and static response-oriented model updating, respectively. The updated multi-scale model was further verified to act as the baseline model which is assumed to be finite-element model closest to the real situation of the structure available for the subsequent arbitrary numerical simulation. The comparison of dynamic and static responses between the calculated results by the final model and measured data indicated the updating and verification methods applied in this paper are reliable and accurate for the multi-scale model of frame-like structure. The general procedures of multi-scale model updating and verification were finally proposed for nonlinear physical-based modeling of large civil infrastructure, and it was applied to the model verification of a long-span bridge as an actual engineering practice of the proposed procedures.
Resumo:
Due to the popularity of modern Collaborative Virtual Environments, there has been a related increase in their size and complexity. Developers therefore need visualisations that expose usage patterns from logged data, to understand the structures and dynamics of these complex environments. This chapter presents a new framework for the process of visualising virtual environment usage data. Major components, such as an event model, designer task model and data acquisition infrastructure are described. Interface and implementation factors are also developed, along with example visualisation techniques that make use of the new task and event model. A case study is performed to illustrate a typical scenario for the framework, and its benefits to the environment development team.
Resumo:
In Australia there is growing interest in a national curriculum to replace the variety of matriculation credentials managed by State Education departments, ostensibly to address increasing population mobility. Meanwhile, the International Baccalaureate (IB) is attracting increasing interest and enrolments in State and private schools in Australia, and has been considered as one possible model for a proposed Australian Certificate of Education. This paper will review the construction of this curriculum in Australian public discourse as an alternative frame for producing citizens, and ask why this design appeals now, to whom, and how the phenomenon of its growing appeal might inform national curricular debates. The IB’s emergence is understood with reference to the larger context of neo-liberal marketization policies, neo-conservative claims on the curriculum and middle class strategy. The paper draws on public domain documents from the IB Organisation and newspaper reportage to demonstrate how the IB is constructed for public consumption in Australia.
Resumo:
This paper reports on a study of students choosing the International Baccalaureate Diploma (IBD) over state-based curricula in Australian schools. The IBD was initially designed as a matriculation certificate to facilitate international mobility. While first envisaged as a lifestyle agenda for cultural elites, such mobility is now widespread with more people living ‘beyond the nation’ through choice or circumstance. Beck (2007) and others highlight how the capacity to cross national borders offers a competitive edge with which to strategically pursue economic and cultural capital. Beck’s ‘border artistes’ are those who use national borders to their individual advantage through reflexive strategy. The study explored the rationales and strategy behind the choice of the IBD curriculum expressed by students in a focus group interview and an online survey. This paper reports on their imagined transnational routes and mobile orientations, and how a localised curriculum limits their imagined mobile futures.
Resumo:
The Multi-outcomes Construction Policies research project, funded by the Cooperative Research Centre for Construction Innovation (Project 2006-036-A), sought to explore the costs and benefits of leveraging social outcomes on public construction contracts. The context of the research project was the trend towards the contracting out of public construction works and the attempts that have been made to use new contractual arrangements with construction companies to construction achieve a wide range of social outcomes. In federal and state jurisdictions it is now common for governments to impose a range of additional requirements on public works contractors that relate to broad social/community objectives. These requirements include commitments to train apprentices and trainees; to provide local and/or indigenous employment opportunities; to buy local materials; and to include art works. The cost and benefits of using public construction contracts to achieve social/community goals have, to our knowledge, not been thoroughly researched in an Australian context. This is likely to reflect in large part the relatively short history of contracting out public works. As Jensen and Stonecash (2004) explain, most previous empirical studies of contracting out have attempted to measure the cost savings achieved through privatization, as this was the focus of policy debate in the 1980s and 1990s. Relatively few studies have addressed the ability of contracting arrangements to ensure the delivery of desired ‘quality’ outcomes1, or the costs of achieving these outcomes via contracting arrangements. One of the potential costs of attempting to leverage social/community outcomes on public construction projects is a reduction in the amount of competition for these projects, with obvious consequences for average bid prices and choice. In jurisdictions, such as Western Australia and Queensland, where currently construction market conditions are already
Resumo:
We present a new penalty-based genetic algorithm for the multi-source and multi-sink minimum vertex cut problem, and illustrate the algorithm’s usefulness with two real-world applications. It is proved in this paper that the genetic algorithm always produces a feasible solution by exploiting some domain-specific knowledge. The genetic algorithm has been implemented on the example applications and evaluated to show how well it scales as the problem size increases.
Resumo:
Matching method of heavy truck-rear air suspensions is discussed, and a fuzzy control strategy which improves both ride comfort and road friendliness of truck by adjusting damping coefficients of the suspension system is found. In the first place, a Dongfeng EQ1141G7DJ heavy truck’s ten DOF whole vehicle-road model was set up based on Matlab/Simulink and vehicle dynamics. Then appropriate passive air suspensions were chosen to replace the original rear leaf springs of the truck according to truck-suspension matching criterions, consequently, the stiffness of front leaf springs were adjusted too. Then the semi-active fuzzy controllers were designed for further enhancement of the truck’s ride comfort and the road friendliness. After the application of semi-active fuzzy control strategy through simulation, is was indicated that both ride comfort and road friendliness could be enhanced effectively under various road conditions. The strategy proposed may provide theory basis for design and development of truck suspension system in China.