112 resultados para Uncertainty of forecasts


Relevância:

40.00% 40.00%

Publicador:

Resumo:

This study developed and tested a model of job uncertainty for survivors and victims of downsizing. Data were collected from three samples of employees in a public hospital, each representing three phases of the downsizing process: immediately before the announcement of the redeployment of staff, during the implementation of the downsizing, and towards the end of the official change programme. As predicted, levels of job uncertainty and personal control had a direct relationship with emotional exhaustion and job satisfaction. In addition, there was evidence to suggest that personal control mediated the relationship between job uncertainty and employee adjustment, a pattern of results that varied across each of the three phases of the change event. From the perspective of the organization’s overall climate, it was found that levels of job uncertainty, personal control and job satisfaction improved and/or stabilized over the downsizing process. During the implementation phase, survivors experienced higher levels of personal control than victims, but both groups of employees reported similar levels of job uncertainty. We discuss the implications of our results for strategically managing uncertainty during and after organizational change.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In an ever-changing and globalised world there is a need for higher education to adapt and evolve its models of learning and teaching. The old industrial model has lost traction, and new patterns of creative engagement are required. These new models potentially increase relevancy and better equip students for the future. Although creativity is recognised as an attribute that can contribute much to the development of these pedagogies, and creativity is valued by universities as a graduate capability, some educators understandably struggle to translate this vision into practice. This paper reports on selected survey findings from a mixed methods research project which aimed to shed light on how creativity can be designed for in higher education learning and teaching settings. A social constructivist epistemology underpinned the research and data was gathered using survey and case study methods. Descriptive statistical methods and informed grounded theory were employed for the analysis reported here. The findings confirm that creativity is valued for its contribution to the development of students’ academic work, employment opportunities and life in general; however, tensions arise between individual educator’s creative pedagogical goals and the provision of institutional support for implementation of those objectives. Designing for creativity becomes, paradoxically, a matter of navigating and limiting complexity and uncertainty, while simultaneously designing for those same states or qualities.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Engineers and asset managers must often make decisions on how to best allocate limited resources amongst different interrelated activities, including repair, renewal, inspection, and procurement of new assets. The presence of project interdependencies and the lack of sufficient information on the true value of an activity often produce complex problems and leave the decision maker guessing about the quality and robustness of their decision. In this paper, a decision support framework for uncertain interrelated activities is presented. The framework employs a methodology for multi-criteria ranking in the presence of uncertainty, detailing the effect that uncertain valuations may have on the priority of a particular activity. The framework employs employing semi-quantitative risk measures that can be tailored to an organisation and enable a transparent and simple-to-use uncertainty specification by the decision maker. The framework is then demonstrated on a real world project set from a major Australian utility provider.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper the issue of finding uncertainty intervals for queries in a Bayesian Network is reconsidered. The investigation focuses on Bayesian Nets with discrete nodes and finite populations. An earlier asymptotic approach is compared with a simulation-based approach, together with further alternatives, one based on a single sample of the Bayesian Net of a particular finite population size, and another which uses expected population sizes together with exact probabilities. We conclude that a query of a Bayesian Net should be expressed as a probability embedded in an uncertainty interval. Based on an investigation of two Bayesian Net structures, the preferred method is the simulation method. However, both the single sample method and the expected sample size methods may be useful and are simpler to compute. Any method at all is more useful than none, when assessing a Bayesian Net under development, or when drawing conclusions from an ‘expert’ system.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper demonstrates the procedures for probabilistic assessment of a pesticide fate and transport model, PCPF-1, to elucidate the modeling uncertainty using the Monte Carlo technique. Sensitivity analyses are performed to investigate the influence of herbicide characteristics and related soil properties on model outputs using four popular rice herbicides: mefenacet, pretilachlor, bensulfuron-methyl and imazosulfuron. Uncertainty quantification showed that the simulated concentrations in paddy water varied more than those of paddy soil. This tendency decreased as the simulation proceeded to a later period but remained important for herbicides having either high solubility or a high 1st-order dissolution rate. The sensitivity analysis indicated that PCPF-1 parameters requiring careful determination are primarily those involve with herbicide adsorption (the organic carbon content, the bulk density and the volumetric saturated water content), secondary parameters related with herbicide mass distribution between paddy water and soil (1st-order desorption and dissolution rates) and lastly, those involving herbicide degradations. © Pesticide Science Society of Japan.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Uncertainty inherent to heavy metal build-up and wash-off stems from process variability. This results in inaccurate interpretation of stormwater quality model predictions. The research study has characterised the variability in heavy metal build-up and wash-off processes based on the temporal variations in particle-bound heavy metals commonly found on urban roads. The study outcomes found that the distribution of Al, Cr, Mn, Fe, Ni, Cu, Zn, Cd and Pb were consistent over particle size fractions <150µm and >150µm, with most metals concentrated in the particle size fraction <150µm. When build-up and wash-off are considered as independent processes, the temporal variations in these processes in relation to the heavy metals load are consistent with variations in the particulate load. However, the temporal variations in the load in build-up and wash-off of heavy metals and particulates are not consistent for consecutive build-up and wash-off events that occur on a continuous timeline. These inconsistencies are attributed to interactions between heavy metals and particulates <150µm and >150µm, which are influenced by particle characteristics such as organic matter content. The behavioural variability of particles determines the variations in the heavy metals load entrained in stormwater runoff. Accordingly, the variability in build-up and wash-off of particle-bound pollutants needs to be characterised in the description of pollutant attachment to particulates in stormwater quality modelling. This will ensure the accounting of process uncertainty, and thereby enhancing the interpretation of the outcomes derived from modelling studies.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

There has been a recent spate of high profile infrastructure cost overruns in Australia and internationally. This is just the tip of a longer-term and more deeply-seated problem with initial budget estimating practice, well recognised in both academic research and industry reviews: the problem of uncertainty. A case study of the Sydney Opera House is used to identify and illustrate the key causal factors and system dynamics of cost overruns. It is conventionally the role of risk management to deal with such uncertainty, but the type and extent of the uncertainty involved in complex projects is shown to render established risk management techniques ineffective. This paper considers a radical advance on current budget estimating practice which involves a particular approach to statistical modelling complemented by explicit training in estimating practice. The statistical modelling approach combines the probability management techniques of Savage, which operate on actual distributions of values rather than flawed representations of distributions, and the data pooling technique of Skitmore, where the size of the reference set is optimised. Estimating training employs particular calibration development methods pioneered by Hubbard, which reduce the bias of experts caused by over-confidence and improve the consistency of subjective decision-making. A new framework for initial budget estimating practice is developed based on the combined statistical and training methods, with each technique being explained and discussed.