222 resultados para Shipping Manager


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The overall objective of this thesis is to explore how and why the content of individuals' psychological contracts changes over time. The contract is generally understood as "individual beliefs, shaped by the organisation, regarding the terms of an exchange agreement between individuals and their organisation" (Rousseau, 1995, p. 9). With an overall study sampling frame of 320 graduate organisational newcomers, a mixed method longitudinal research design comprised of three sequential, inter-related studies is employed in order to capture the change process. From the 15 semi-structured interviews conducted in Study 1, the key findings included identifying a relatively high degree of mutuality between employees' and their managers' reciprocal contract beliefs around the time of organisational entry. Also, at this time, individuals had developed specific components of their contract content through a mix of social network information (regarding broader employment expectations) and perceptions of various elements of their particular organisation's reputation (for more firm-specific expectations). Study 2 utilised a four-wave survey approach (available to the full sampling frame) over the 14 months following organisational entry to explore the 'shape' of individuals' contract change trajectories and the role of four theorised change predictors in driving these trajectories. The predictors represented an organisational-level informational cue (perceptions of corporate reputation), a dyadic-level informational cue (perceptions of manager-employee relationship quality) and two individual difference variables (affect and hardiness). Through the use of individual growth modelling, the findings showed differences in the general change patterns across contract content components of perceived employer (exhibiting generally quadratic change patterns) and employee (exhibiting generally no-change patterns) obligations. Further, individuals differentially used the predictor variables to construct beliefs about specific contract content. While both organisational- and dyadic-level cues were focused upon to construct employer obligation beliefs, organisational-level cues and individual difference variables were focused upon to construct employee obligation beliefs. Through undertaking 26 semi-structured interviews, Study 3 focused upon gaining a richer understanding of why participants' contracts changed, or otherwise, over the study period, with a particular focus upon the roles of breach and violation. Breach refers to an employee's perception that an employer obligation has not been met and violation refers to the negative and affective employee reactions which may ensue following a breach. The main contribution of these findings was identifying that subsequent to a breach or violation event a range of 'remediation effects' could be activated by employees which, depending upon their effectiveness, served to instigate either breach or contract repair or both. These effects mostly instigated broader contract repair and were generally cognitive strategies enacted by an individual to re-evaluate the breach situation and re-focus upon other positive aspects of the employment relationship. As such, the findings offered new evidence for a clear distinction between remedial effects which serve to only repair the breach (and thus the contract) and effects which only repair the contract more broadly; however, when effective, both resulted in individuals again viewing their employment relationships positively. Overall, in response to the overarching research question of this thesis, how and why individuals' psychological contract beliefs change, individuals do indeed draw upon various information sources, particularly at the organisational-level, as cues or guides in shaping their contract content. Further, the 'shapes' of the changes in beliefs about employer and employee obligations generally follow different, and not necessarily linear, trajectories over time. Finally, both breach and violation and also remedial actions, which address these occurrences either by remedying the breach itself (and thus the contract) or the contract only, play central roles in guiding individuals' contract changes to greater or lesser degrees. The findings from the thesis provide both academics and practitioners with greater insights into how employees construct their contract beliefs over time, the salient informational cues used to do this and how the effects of breach and violation can be mitigated through creating an environment which facilitates the use of effective remediation strategies.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Our aim is to develop a set of leading performance indicators to enable managers of large projects to forecast during project execution how various stakeholders will perceive success months or even years into the operation of the output. Large projects have many stakeholders who have different objectives for the project, its output, and the business objectives they will deliver. The output of a large project may have a lifetime that lasts for years, or even decades, and ultimate impacts that go beyond its immediate operation. How different stakeholders perceive success can change with time, and so the project manager needs leading performance indicators that go beyond the traditional triple constraint to forecast how key stakeholders will perceive success months or even years later. In this article, we develop a model for project success that identifies how project stakeholders might perceive success in the months and years following a project. We identify success or failure factors that will facilitate or mitigate against achievement of those success criteria, and a set of potential leading performance indicators that forecast how stakeholders will perceive success during the life of the project's output. We conducted a scale development study with 152 managers of large projects and identified two project success factor scales and seven stakeholder satisfaction scales that can be used by project managers to predict stakeholder satisfaction on projects and so may be used by the managers of large projects for the basis of project control.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As ambient computing blends into the fabric of the modern urban environment developing a positive interplay between people, places, and technology to create enlivened, interactive cities becomes a necessary priority in how we imagine, understand, design, and develop cities. Designing technology for art, culture and gastronomic experiences, that are rich in community, can provide the means for collaborative action to (re)create cities that are lively, engaging, and promote a sense of well being as well as belonging.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this issue of the Journal, articles presented to the readers cover project management practices throughout history (“Frontinus—A Project Manager From the Roman Empire Era,” Walker and Dart), project success and failure revisited through integrated theoretical lens on the one hand (“Translation and Convergence in Projects: An Organizational Perspective on Project Success,” Alderman and Ivory) and, on the other hand, with a focus on systems engineers' capacity for engineering systems thinking (“The Relationship Among Systems Engineers' Capacity for Engineering Systems Thinking, Project Types, and Project Success,” Frank, Sadeh, and Ashkenasi), project management offices (PMOs) investigated through community of practice theory (“Exploring PMOs Through Community of Practice Theory,” Aubry, Müller, and Glückler), influence of cultural patterns on project team behavior (“Cultural Patterns Influencing Project Team Behavior in Sub-Saharan Africa: A Case Study in Ethiopia,” Jetu, Riedl, and Roithmayr), and human factors and differences of perception and their impact on risk management (“Exploring Risk Dimensions in the Indian Software Industry,” Sharma, Sengupta, and Gupta)...

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Having personal that works in projects but belongs to a functional organization is the way that many companies organized their labor force today. Previous research shows that this implies management contradictions and ambiguities between functional manager and project manager; there are unresolved struggles between these two roles in terms of power, accountability, authority and legitimacy. With this paper we aim to analyze those struggles based on previous research and to generate working hypotheses. We first provide a review of the different matrix organizations focusing on the relation between the functional manager and the project manager. We then review the literature concerning temporary organizations and projects as temporary organizations. We conclude by integrating the findings of these perspectives and by identifying working hypotheses and areas for further research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A 1,000-word travel article about Broome in Western Australia. "BY THE end of a weekend in Broome, you are quite sure that this town is a fiction, an imagining. I am in a provincial comedy. On my way from the airport, I will be kidnapped, driven to the newspaper offices and told to write the local shipping news, or the pearler news, or the gas works news - the news of whichever resources boom is next..."--publisher website

Relevância:

10.00% 10.00%

Publicador:

Resumo:

MISOGYNY, no matter how it's defined, has become a political football. Fifteen minutes into the first quarter of David Williamson's Managing Carmen and Brent Lyall, a star AFL footballer, has already taken a high tackle from his hottie girlfriend, had a clanger with his manager and been caught wearing women's clothes by his acting coach. Not a good look for Brent's sponsors. By full time, Williamson's witty banter and colourful characters have hit their mark. No wonder he's already working on the screenplay.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, we propose a novel relay ordering and scheduling strategy for the sequential slotted amplify-and-forward (SAF) protocol and evaluate its performance in terms of diversity-multiplexing trade-off (DMT). The relays between the source and destination are grouped into two relay clusters based on their respective locations. The proposed strategy achieves partial relay isolation and decreases the decoding complexity at the destination. We show that the DMT upper bound of sequential-SAF with the proposed strategy outperforms other amplify and forward protocols and is more practical compared to the relay isolation assumption made in the original paper [1]. Simulation result shows that the sequential-SAF protocol with the proposed strategy has better outage performance compared to the existing AF and non-cooperative protocols in high SNR regime.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, we propose a novel slotted hybrid cooperative protocol named the sequential slotted amplify-decodeand-forward (SADF) protocol and evaluate its performance in terms of diversity-multiplexing trade-off (DMT). The relays between the source and destination are divided into two different groups and each relay either amplifies or decodes the received signal. We first compute the optimal DMT of the proposed protocol with the assumption of perfect decoding at the DF relays. We then derive the DMT closed-form expression of the proposed sequential-SADF and obtain the proximity gain bound for achieving the optimal DMT. With the proximity gain bound, we then found the distance ratio to achieve the optimal DMT performance. Simulation result shows that the proposed protocol with high proximity gain outperforms other cooperative communication protocols in high SNR regime.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Historically, the public service broadcaster (PSB) acted beyond its institutional broadcasting remit by initiating and facilitating activities to support cultural infrastructure and national identity (Wilson, Hutchinson and Shea 2010). The recent focus to develop new content delivery platforms and services (Debrett 2010) signifies a semantic shift from the PSB to the public service media (PSM) organisation. The Australian PSM organisation, the Australian Broadcasting Corporation (ABC) has moved beyond the era of ‘online’ publishing to incorporate Web 2.0 technologies to foster new relationships with the audience (Walker 2009) and engage in production activities with participatory cultures (Jenkins 2006). This shift presents opportunities and challenges to traditional media production, the existing editorial policies and governance models, and raises questions around the value of PSM experimental and innovative activities. Further, the incorporation of information communication technologies and participatory cultures challenge the core values of ‘public service’ within PSM. This paper examines ABC Pool (abc.net.au/pool) as a means of extending the ABC’s public service remit by incorporating participatory cultures into the production and governance models of the corporation and critically analyses the public value of such innovative experiments.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Web 2.0 technologies have mobilised collaborative peer production and participatory cultures for online content creation. However, not all online communities engaging in these activities are independently facilitated and often operate within the auspices of the cultural institutions that develop and resource them. Borrowing from the principles of Wikipedia that supports collaborative online content creation and online community, ABC Pool (abc.net.au/pool) is one such institutional online community operating with the support of the Australian Public Service Broadcaster (PSB), the Australian Broadcasting Corporation (ABC). This paper explores the collaborative, creative, and governance activities of an institutional online community and how the role of the community manager is an intermediary within these arrangements.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

It is widely recognized that the quality of design is crucial to the success of the construction or production process and fairly minor changes in design can often result in giving major effects on the cost and efficiency of production and construction as well as on the usefulness, constructability and marketability of the product especially in developing high rise residential property development. The purpose of this study is to suggest a framework model for property manager, considering the sustainable and building quality of property development in high rise residential complex. This paper evaluates and ranks the importance, and frequency of the building quality factors that affect the sustainability and comfort of living for the resident in the selected high rise residential complex in Malaysia. A total of 500 respondents consisting of 20 property managers participated in this study. The respondents were asked to indicate how important each of building equipments in giving them the comfort of living in the selected high rise residential complex. The data were then subjected to the calculation of important indices which enabled the factors to be ranked. After that, a framework model will be developed to make sure all property managers will be guided to prepare their property for the resident to stay in the complex. Accordingly, the living satisfaction by the framework model plays a meaningful role in preparing and developing sustainable and good building quality in Malaysia high rise residential complex.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Most commonly, residents are always arguing about the satisfaction of sustainability and quality of their high rise residential property. This paper aim is to maintain the best quality satisfaction of the door hardware by introducing the whole life cycle costing approach to the property manager of the public housing in Johor. This paper looks into the current situation of ironmongeries (door hardware) of 2 public housings in Johor, Malaysia and testing the whole life cycle costing approach towards them. The calculation and the literature review are conducted. The questionnaire surveys of 2 public housings were conducted to make clear the occupants’ evaluation about the actual quality conditions of the ironmongeries in their house. As a result, the quality of door hardware based on the whole life cycle costing approach is one of the best among their previous decision making tool that have been applied. Practitioners can benefit from this paper as it provides information on calculating the whole life costing and making the decisions about ironmongeries selection of their properties.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Most commonly, residents are always arguing about the satisfaction of sustainability and quality of their high rise residential property. This paper aim is to maintain the best quality satisfaction of the floor materials by introducing the whole life cycle costing approach to the property manager of the public housing in Johor. This paper looks into the current situation of floor material of two public housings in Johor, Malaysia and testing the whole life cycle costing approach towards them. The cost figures may be implemented to justify higher investments, for examples, in the quality or flexibility of building solutions through a long-term cost reduction. The calculation and the literature review are conducted. The questionnaire surveys of two public housings were conducted to make clear the occupants’ evaluation about the actual quality conditions of the floor material in their house. As a result, the quality of floor material based on the whole life cycle costing approach is one of the best among their previous decision making tool that was applied. Practitioners can benefit from this paper as it provides information on calculating the whole life costing and making the decisions for floor material selection for their properties.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The IEEE Subcommittee on the Application of Probability Methods (APM) published the IEEE Reliability Test System (RTS) [1] in 1979. This system provides a consistent and generally acceptable set of data that can be used both in generation capacity and in composite system reliability evaluation [2,3]. The test system provides a basis for the comparison of results obtained by different people using different methods. Prior to its publication, there was no general agreement on either the system or the data that should be used to demonstrate or test various techniques developed to conduct reliability studies. Development of reliability assessment techniques and programs are very dependent on the intent behind the development as the experience of one power utility with their system may be quite different from that of another utility. The development and the utilization of a reliability program are, therefore, greatly influenced by the experience of a utlity and the intent of the system manager, planner and designer conducting the reliability studies. The IEEE-RTS has proved to be extremely valuable in highlighting and comparing the capabilities (or incapabilities) of programs used in reliability studies, the differences in the perception of various power utilities and the differences in the solution techniques. The IEEE-RTS contains a reasonably large power network which can be difficult to use for initial studies in an educational environment.