252 resultados para Selection criterion
Resumo:
Project selection is a complex decision-making process as it involves multiple objectives, constraints and stakeholders. Understanding the organisation, in particular organisational culture, is an essential stage in improving decision-making process. The influences of organisational culture on decision-making can be seen in the way people work as a team, act and cooperate in their teamwork to achieve the set goals, and also in how people think, prioritize and decide. This paper aims to give evidence of the impact of organisational culture on the decision-making process in project selection, in the Indonesian context. Data was collected from a questionnaire survey developed based on the existing models of organisational culture (Denison 1990, Hofstede 2001, and Glaser et al 1987). Four main cultural traits (involvement, consistency, mission and power-distance) were selected and employed to examine the influence of organisational culture on the effectiveness of decision-making in the current Indonesian project selection processes. The results reveal that there are differences in organisational cultures for two organisations in three provinces. It also suggests that organisational culture (particularly the traits of ‘involvement’, ‘consistency’ and ‘mission’) contribute to the effectiveness of decision-making in the selected cases.
Resumo:
Introduction Buildings, which account for approximately half of all annual energy and greenhouse gas emissions, are an important target area for any strategy addressing climate change. Whilst new commercial buildings increasingly address sustainability considerations, incorporating green technology in the refurbishment process of older buildings is technically, financially and socially challenging. This research explores the expectations and experiences of commercial office building tenants, whose building was under-going green refurbishment. Methodology Semi-structured in-depth interviews with seven residents and neighbours of a large case-study building under-going green refurbishment in Melbourne, Australia. Built in 1979, the 7,008m² ‘B’ grade building consists of 11 upper levels of office accommodation, ground floor retail, and a basement area leased as a licensed restaurant. After refurbishment, which included the installation of chilled water pumps, solar water heating, waterless urinals, insulation, disabled toilets, and automatic dimming lights, it was expected that the environmental performance of the building would move from a non-existent zero ABGR (Australian Building Greenhouse Rating) star rating to 3.5 stars, with a 40% reduction in water consumption and 20% reduction in energy consumption. Interviews were transcribed, with responses analysed using a thematic approach, identifying categories, themes and patterns. Results Commercial property tenants are on a journey to sustainability - they are interested and willing to engage in discussions about sustainability initiatives, but the process, costs and benefits need to be clear. Critically, whilst sustainability was an essential and non-negotiable criterion in building selection for government and larger corporate tenants, sustainability was not yet a core business value for smaller organisations – whilst they could see it as an emerging issue, they wanted detailed cost-benefit analyses, pay-back calculations of proposed technologies and, ideally, wished they could trial the technology first-hand in some way. Although extremely interested in learning more, most participants reported relatively minimal knowledge of specific sustainability features, designs or products. In discussions about different sustainable technologies (e.g., waterless urinals, green-rated carpets), participants frequently commented that they knew little about the technology, had not heard of it or were not sure exactly how it worked. Whilst participants viewed sustainable commercial buildings as the future, they had varied expectations about the fate of existing older buildings – most felt that they would have to be retrofitted at some point to meet market expectations and predicted the emergence of a ‘non-sustainability discount’ for residing in a building without sustainable features. Discussion This research offers a beginning point for understanding the difficulty of integrating green technology in older commercial buildings. Tenants currently have limited understandings of technology and potential building performance outcomes, which ultimately could impede the implementation of sustainable initiatives in older buildings. Whilst the commercial property market is interested in learning about sustainability in the built environment, the findings highlight the importance of developing a strong business case, communication and transition plan for implementing sustainability retrofits in existing commercial buildings.
Resumo:
A microgrid provides economical and reliable power to customers by integrating distributed resources more effectively. Islanded operation enables a continuous power supply for loads during a major grid disturbance. Reliability of a microgrid can be further increased by forming a mesh configuration. However, the protection of mesh microgrids is a challenging task. In this paper, protection schemes are discussed using current differential protection of a microgrid. The protection challenges associated with bi-directional power flow, meshed configuration, changing fault current level due to intermittent nature of DGs and reduced fault current level in an islanded mode are considered in proposing the protection solutions. Relay setting criterion and current transformer (CT) selection guidelines are also discussed. The results are verified using MATLAB calculations and PSCAD simulations.
Resumo:
This research is one of several ongoing studies conducted within the IT Professional Services (ITPS) research programme at Queensland University of Technology (QUT). In 2003, ITPS introduced the IS-Impact model, a measurement model for measuring information systems success from the viewpoint of multiple stakeholders. The model, along with its instrument, is robust, simple, yet generalisable, and yields results that are comparable across time, stakeholders, different systems and system contexts. The IS-Impact model is defined as “a measure at a point in time, of the stream of net benefits from the Information System (IS), to date and anticipated, as perceived by all key-user-groups”. The model represents four dimensions, which are ‘Individual Impact’, ‘Organizational Impact’, ‘Information Quality’ and ‘System Quality’. The two Impact dimensions measure the up-to-date impact of the evaluated system, while the remaining two Quality dimensions act as proxies for probable future impacts (Gable, Sedera & Chan, 2008). To fulfil the goal of ITPS, “to develop the most widely employed model” this research re-validates and extends the IS-Impact model in a new context. This method/context-extension research aims to test the generalisability of the model by addressing known limitations of the model. One of the limitations of the model relates to the extent of external validity of the model. In order to gain wide acceptance, a model should be consistent and work well in different contexts. The IS-Impact model, however, was only validated in the Australian context, and packaged software was chosen as the IS understudy. Thus, this study is concerned with whether the model can be applied in another different context. Aiming for a robust and standardised measurement model that can be used across different contexts, this research re-validates and extends the IS-Impact model and its instrument to public sector organisations in Malaysia. The overarching research question (managerial question) of this research is “How can public sector organisations in Malaysia measure the impact of information systems systematically and effectively?” With two main objectives, the managerial question is broken down into two specific research questions. The first research question addresses the applicability (relevance) of the dimensions and measures of the IS-Impact model in the Malaysian context. Moreover, this research question addresses the completeness of the model in the new context. Initially, this research assumes that the dimensions and measures of the IS-Impact model are sufficient for the new context. However, some IS researchers suggest that the selection of measures needs to be done purposely for different contextual settings (DeLone & McLean, 1992, Rai, Lang & Welker, 2002). Thus, the first research question is as follows, “Is the IS-Impact model complete for measuring the impact of IS in Malaysian public sector organisations?” [RQ1]. The IS-Impact model is a multidimensional model that consists of four dimensions or constructs. Each dimension is represented by formative measures or indicators. Formative measures are known as composite variables because these measures make up or form the construct, or, in this case, the dimension in the IS-Impact model. These formative measures define different aspects of the dimension, thus, a measurement model of this kind needs to be tested not just on the structural relationship between the constructs but also the validity of each measure. In a previous study, the IS-Impact model was validated using formative validation techniques, as proposed in the literature (i.e., Diamantopoulos and Winklhofer, 2001, Diamantopoulos and Siguaw, 2006, Petter, Straub and Rai, 2007). However, there is potential for improving the validation testing of the model by adding more criterion or dependent variables. This includes identifying a consequence of the IS-Impact construct for the purpose of validation. Moreover, a different approach is employed in this research, whereby the validity of the model is tested using the Partial Least Squares (PLS) method, a component-based structural equation modelling (SEM) technique. Thus, the second research question addresses the construct validation of the IS-Impact model; “Is the IS-Impact model valid as a multidimensional formative construct?” [RQ2]. This study employs two rounds of surveys, each having a different and specific aim. The first is qualitative and exploratory, aiming to investigate the applicability and sufficiency of the IS-Impact dimensions and measures in the new context. This survey was conducted in a state government in Malaysia. A total of 77 valid responses were received, yielding 278 impact statements. The results from the qualitative analysis demonstrate the applicability of most of the IS-Impact measures. The analysis also shows a significant new measure having emerged from the context. This new measure was added as one of the System Quality measures. The second survey is a quantitative survey that aims to operationalise the measures identified from the qualitative analysis and rigorously validate the model. This survey was conducted in four state governments (including the state government that was involved in the first survey). A total of 254 valid responses were used in the data analysis. Data was analysed using structural equation modelling techniques, following the guidelines for formative construct validation, to test the validity and reliability of the constructs in the model. This study is the first research that extends the complete IS-Impact model in a new context that is different in terms of nationality, language and the type of information system (IS). The main contribution of this research is to present a comprehensive, up-to-date IS-Impact model, which has been validated in the new context. The study has accomplished its purpose of testing the generalisability of the IS-Impact model and continuing the IS evaluation research by extending it in the Malaysian context. A further contribution is a validated Malaysian language IS-Impact measurement instrument. It is hoped that the validated Malaysian IS-Impact instrument will encourage related IS research in Malaysia, and that the demonstrated model validity and generalisability will encourage a cumulative tradition of research previously not possible. The study entailed several methodological improvements on prior work, including: (1) new criterion measures for the overall IS-Impact construct employed in ‘identification through measurement relations’; (2) a stronger, multi-item ‘Satisfaction’ construct, employed in ‘identification through structural relations’; (3) an alternative version of the main survey instrument in which items are randomized (rather than blocked) for comparison with the main survey data, in attention to possible common method variance (no significant differences between these two survey instruments were observed); (4) demonstrates a validation process of formative indexes of a multidimensional, second-order construct (existing examples mostly involved unidimensional constructs); (5) testing the presence of suppressor effects that influence the significance of some measures and dimensions in the model; and (6) demonstrates the effect of an imbalanced number of measures within a construct to the contribution power of each dimension in a multidimensional model.
Resumo:
This study aimed to examine the effects on driving, usability and subjective workload of performing music selection tasks using a touch screen interface. Additionally, to explore whether the provision of visual and/or auditory feedback offers any performance and usability benefits. Thirty participants performed music selection tasks with a touch screen interface while driving. The interface provided four forms of feedback: no feedback, auditory feedback, visual feedback, and a combination of auditory and visual feedback. Performance on the music selection tasks significantly increased subjective workload and degraded performance on a range of driving measures including lane keeping variation and number of lane excursions. The provision of any form of feedback on the touch screen interface did not significantly affect driving performance, usability or subjective workload, but was preferred by users over no feedback. Overall, the results suggest that touch screens may not be a suitable input device for navigating scrollable lists.
Resumo:
The widespread development of Decision Support System (DSS) in construction indicate that the evaluation of software become more important than before. However, it is identified that most research in construction discipline did not attempt to assess its usability. Therefore, little is known about the approach on how to properly evaluate a DSS for specific problem. In this paper, we present a practical framework that can be guidance for DSS evaluation. It focuses on how to evaluate software that is dedicatedly designed for consultant selection problem. The framework features two main components i.e. Sub-system Validation and Face Validation. Two case studies of consultant selection at Malaysian Department of Irrigation and Drainage were integrated in this framework. Some inter-disciplinary area such as Software Engineering, Human Computer Interaction (HCI) and Construction Project Management underpinned the discussion of the paper. It is anticipated that this work can foster better DSS development and quality decision making that accurately meet the client’s expectation and needs
Resumo:
This paper presents a strategy for delayed research method selection in a qualitative interpretivist research. An exemplary case details how explorative interviews were designed and conducted in accordance with a paradigm prior to deciding whether to adopt grounded theory or phenomenology for data analysis. The focus here is to determine the most appropriate research strategy in this case the methodological framing to conduct research and represent findings, both of which are detailed. Research addressing current management issues requires both a flexible framework and the capability to consider the research problem from various angles, to derive tangible results for academia with immediate application to business demands. Researchers, and in particular novices, often struggle to decide on an appropriate research method suitable to address their research problem. This often applies to interpretative qualitative research where it is not always immediately clear which is the most appropriate method to use, as the research objectives shift and crystallize over time. This paper uses an exemplary case to reveal how the strategy for delayed research method selection contributes to deciding whether to adopt grounded theory or phenomenology in the initial phase of a PhD research project. In this case, semi-structured interviews were used for data generation framed in an interpretivist approach, situated in a business context. Research questions for this study were thoroughly defined and carefully framed in accordance with the research paradigm‟s principles, while at the same time ensuring that the requirements of both potential research methods were met. The grounded theory and phenomenology methods were compared and contrasted to determine their suitability and whether they meet the research objectives based on a pilot study. The strategy proposed in this paper is an alternative to the more „traditional‟ approach, which initially selects the methodological formulation, followed by data generation. In conclusion, the suggested strategy for delayed research method selection intends to help researchers identify and apply the most appropriate method to their research. This strategy is based on explorations of data generation and analysis in order to derive faithful results from the data generated.
Resumo:
Selecting an appropriate design-builder is critical to the success of DB projects. The objective of this study is to identify selection criteria for design-builders and compare their relative importance by means of a robust content analysis of 94 Request For Proposals (RFPs) for public DB projects. These DB projects had an aggregate contract value of over US$3.5 billion and were advertised between 2000 and 2010. This study summarized twenty-six selection criteria and classified into ten categories, i.e.: price, experience, technical approach, management approach, qualification, schedule, past performance, financial capability, responsiveness to the RFP, and legal status in descending order of their relative importance. The results showed that even though price still remains as the most important selection category, its relative importance declines significantly in the last decade. The categories of qualification, experience, past performance, by contrast, have been becoming more important to DB owners for selecting design-builders. Finally, it is found that the importance weighting of price in large projects is significantly higher than that in small projects. This study provides a useful reference for owners in selecting their preferred design-builders.
Resumo:
Under pressure from both the ever increasing level of market competition and the global financial crisis, clients in consumer electronics (CE) industry are keen to understand how to choose the most appropriate procurement method and hence to improve their competitiveness. Four rounds of Delphi questionnaire survey were conducted with 12 experts in order to identify the most appropriate procurement method in the Hong Kong CE industry. Five key selection criteria in the CE industry are highlighted, including product quality, capability, price competition, flexibility and speed. This study also revealed that product quality was found to be the most important criteria for the “First type used commercially” and “Major functional improvements” projects. As for “Minor functional improvements” projects, price competition was the most crucial factor to be considered during the PP selection. These research findings provide owners with useful insights to select the procurement strategies.
Resumo:
The design-build (DB) system has been demonstrated as an effective delivery method and has gained popularity worldwide. However it is observed that a number of operational variations of DB system have emerged since the last decade to cater for different client’s requirements. After the client decides to procure his project through the DB system, he still has to choose an appropriate configuration to deliver their projects optimally. However, there is little research on the selection of DB operational variations. One of the main reasons for this is the lack of evaluation criteria for determining the appropriateness of each operational variation. To obtain such criteria, a three-round Delphi survey has been conducted with 20 construction experts in the People’s Republic of China (PRC). Seven top selection criteria were identified. These are: (1) availability of competent design-builders; (2) client’s capabilities; (3) project complexity; (4) client’s control of project; (5) early commencement & short duration; (6) reduced responsibility or involvement; and (7) clearly defined end user’s requirements. These selection criteria were found to have a statistically significant agreement. These findings may furnish various stakeholders, DB clients in particular, with better insight to understand and compare the different operational variations of the DB system.
Resumo:
Feature extraction and selection are critical processes in developing facial expression recognition (FER) systems. While many algorithms have been proposed for these processes, direct comparison between texture, geometry and their fusion, as well as between multiple selection algorithms has not been found for spontaneous FER. This paper addresses this issue by proposing a unified framework for a comparative study on the widely used texture (LBP, Gabor and SIFT) and geometric (FAP) features, using Adaboost, mRMR and SVM feature selection algorithms. Our experiments on the Feedtum and NVIE databases demonstrate the benefits of fusing geometric and texture features, where SIFT+FAP shows the best performance, while mRMR outperforms Adaboost and SVM. In terms of computational time, LBP and Gabor perform better than SIFT. The optimal combination of SIFT+FAP+mRMR also exhibits a state-of-the-art performance.
Resumo:
Global warming can have a significant impact on building energy performance and indoor thermal environment, as well as the health and productivity of people living and working inside them. Through the building simulation technique, this paper investigates the adaptation potential of different selections of building physical properties to increased outdoor temperature in Australia. It is found that overall, an office building with lower insulation level, smaller window to wall ratio and/or a glass type with lower shading coefficient, and lower internal load density will have the effect of lowering building cooling load and total energy use, and therefore have a better potential to adapt to the warming external climate. Compared with clear glass, it is shown that the use of reflective glass for the sample building with WWR being 0.5 reduces the building cooling load by more than 12%. A lower internal load can also have a significant impact on the reduction of building cooling load, as well as the building energy use. Through the comparison of results between current and future weather scenarios, it is found that the patterns found in the current weather scenario also exist in the future weather scenarios, but to a smaller extent.
Resumo:
Project selection is a complex decision making process that is not merely influenced by the technical aspects of the project. Selection of road infrastructure projects in the Indonesian public sector is generally conducted at an organisational level, which involves multiple objectives, constraints and stakeholders. Hence, a deeper understanding of the various organisational drivers that impact on such decisions, in particular organisational culture, is much needed for improving decision-making processes as it has been posited by some researchers that organisational culture can become either an enabler, or a barrier, to the process. One part of the cultural assessment undertaken as part of the research, identifies and analyses the cultural types of relevant and involved organisations in the decision making process. The organisational culture assessment instrument (OCAI) of Cameron and Quinn (2011) was utilized in this study and the data was taken from three selected provinces in Indonesia. The results can facilitate the surveyed (and similar) organisations to improve their performance by moving towards a more appropriate cultural typology that is arguably better suited to their operations and to improving their organisational processes to more closely align with their organisational vision, mission and objectives.
Resumo:
The favourable scaffold for bone tissue engineering should have desired characteristic features, such as adequate mechanical strength and three-dimensional open porosity, which guarantee a suitable environment for tissue regeneration. In fact, the design of such complex structures like bone scaffolds is a challenge for investigators. One of the aims is to achieve the best possible mechanical strength-degradation rate ratio. In this paper we attempt to use numerical modelling to evaluate material properties for designing bone tissue engineering scaffold fabricated via the fused deposition modelling technique. For our studies the standard genetic algorithm was used, which is an efficient method of discrete optimization. For the fused deposition modelling scaffold, each individual strut is scrutinized for its role in the architecture and structural support it provides for the scaffold, and its contribution to the overall scaffold was studied. The goal of the study was to create a numerical tool that could help to acquire the desired behaviour of tissue engineered scaffolds and our results showed that this could be achieved efficiently by using different materials for individual struts. To represent a great number of ways in which scaffold mechanical function loss could proceed, the exemplary set of different desirable scaffold stiffness loss function was chosen. © 2012 John Wiley & Sons, Ltd.
Resumo:
Hybrid system representations have been exploited in a number of challenging modelling situations, including situations where the original nonlinear dynamics are too complex (or too imprecisely known) to be directly filtered. Unfortunately, the question of how to best design suitable hybrid system models has not yet been fully addressed, particularly in the situations involving model uncertainty. This paper proposes a novel joint state-measurement relative entropy rate based approach for design of hybrid system filters in the presence of (parameterised) model uncertainty. We also present a design approach suitable for suboptimal hybrid system filters. The benefits of our proposed approaches are illustrated through design examples and simulation studies.