421 resultados para Requisito não-funcional. Arquitetura de software. NFR-framework. Padrão arquitetural
Resumo:
Reinforced concrete structures are susceptible to a variety of deterioration mechanisms due to creep and shrinkage, alkali-silica reaction (ASR), carbonation, and corrosion of the reinforcement. The deterioration problems can affect the integrity and load carrying capacity of the structure. Substantial research has been dedicated to these various mechanisms aiming to identify the causes, reactions, accelerants, retardants and consequences. This has improved our understanding of the long-term behaviour of reinforced concrete structures. However, the strengthening of reinforced concrete structures for durability has to date been mainly undertaken after expert assessment of field data followed by the development of a scheme to both terminate continuing degradation, by separating the structure from the environment, and strengthening the structure. The process does not include any significant consideration of the residual load-bearing capacity of the structure and the highly variable nature of estimates of such remaining capacity. Development of performance curves for deteriorating bridge structures has not been attempted due to the difficulty in developing a model when the input parameters have an extremely large variability. This paper presents a framework developed for an asset management system which assesses residual capacity and identifies the most appropriate rehabilitation method for a given reinforced concrete structure exposed to aggressive environments. In developing the framework, several industry consultation sessions have been conducted to identify input data required, research methodology and output knowledge base. Capturing expert opinion in a useable knowledge base requires development of a rule based formulation, which can subsequently be used to model the reliability of the performance curve of a reinforced concrete structure exposed to a given environment.
Resumo:
Properly designed decision support environments encourage proactive and objective decision making. The work presented in this paper inquires into developing a decision support environment and a tool to facilitate objective decision making in dealing with road traffic noise. The decision support methodology incorporates traffic amelioration strategies both within and outside the road reserve. The project is funded by the CRC for Construction Innovation and conducted jointly by the RMIT University and the Queensland Department of Main Roads (MR) in collaboration with the Queensland Department of Public Works, Arup Pty Ltd., and the Queensland University of Technology. In this paper, the proposed decision support framework is presented in the way of a flowchart which enabled the development of the decision support tool (DST). The underpinning concept is to establish and retain an information warehouse for each critical road segment (noise corridor) for a given planning horizon. It is understood that, in current practice, some components of the approach described are already in place but not fully integrated and supported. It provides an integrated user-friendly interface between traffic noise modeling software, noise management criteria and cost databases.
Resumo:
A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.
Resumo:
This paper provides an overview of a new framework for a design stage Building Environmental Assessment (BEA) tool and a discussion of strategic responses to existing tool issues and relative stakeholder requirements that lead to the development of this tool founded on new information and communication technology (ICT) related to developments in 3D CAD technology. After introducing the context of the BEA and some of their team’s new work the authors • Critique current BEA tool theory; • Review previous assessments of stakeholder needs; • Introduce a new framework applied to analyse such tools • Highlight and key results considering illustrative ICT capabilities and • Discuss their potential significance upon BEA tool stakeholders.
Resumo:
The challenges of maintaining a building such as the Sydney Opera House are immense and are dependent upon a vast array of information. The value of information can be enhanced by its currency, accessibility and the ability to correlate data sets (integration of information sources). A building information model correlated to various information sources related to the facility is used as definition for a digital facility model. Such a digital facility model would give transparent and an integrated access to an array of datasets and obviously would support Facility Management processes. In order to construct such a digital facility model, two state-of-the-art Information and Communication technologies are considered: an internationally standardized building information model called the Industry Foundation Classes (IFC) and a variety of advanced communication and integration technologies often referred to as the Semantic Web such as the Resource Description Framework (RDF) and the Web Ontology Language (OWL). This paper reports on some technical aspects for developing a digital facility model focusing on Sydney Opera House. The proposed digital facility model enables IFC data to participate in an ontology driven, service-oriented software environment. A proof-of-concept prototype has been developed demonstrating the usability of IFC information to collaborate with Sydney Opera House’s specific data sources using semantic web ontologies.
Resumo:
As a functioning performing arts centre, commercial enterprise, tourist attraction and major national asset, Sydney Opera House must continue to demonstrate the optimal use and effectiveness of its facilities management (FM) to provide value for its stakeholders. To better achieve this, the Cooperative Research Centre for Construction Innovation focussed on the following three themes for investigation in the FM Exemplar Project — Sydney Opera House: digital modelling — developing a building information model capable of integrating information from disparate software systems and hard copy, and combining this with a spatial 3D computeraided design (CAD)/geographic information system (GIS) platform. This model offers a visual representation of the building and its component elements in 3D, and provides comprehensive information on each element. The model can work collaboratively through an open data exchange standard (common to all compliant software) in order to mine the data required to further FM objectives (such as maintenance) more efficiently and effectively. services procurement — developing a multi-criteria performance-based procurement framework aligned with organisational objectives for FM service delivery performance benchmarking — developing an FM benchmarking framework that enables facilities/ organisations to develop key performance indicators (KPIs) to identify better practice and improvement strategies. These three research stream outcomes were then aligned within the broader context of Sydney Opera House’s Total Asset Management (TAM) Plan and Strategic Asset Maintenance (SAM) Plan in arriving at a business framework aligned with, and in support of, organisational objectives. The Sydney Opera House is managed by the Sydney Opera House Trust on behalf of the Government of the State of New South Wales. Within the framework of the TAM Plan prepared in accordance with NSW Treasury Guidelines, the assimilation of these three themes provides an integrated FM solution capable of supporting Sydney Opera House’s business objectives and functional requirements. FM as a business enabler showcases innovative methods in improving FM performance, a better alignment of service and performance objectives and provides a better-practice model to support the business enterprise.
Resumo:
The digital modelling research stream of the Sydney Opera House FM Exemplar Project has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House did not have digital models of its structure, there was an opportunity to investigate the application of digital modelling using standardised Building Information Models (BIM) to support facilities management (FM).The focus of this investigation was on the following areas:the re-usability of standardised BIM for FM purposesthe potential of BIM as an information framework acting as integrator for various FM data sources the extendibility and flexibility of the BIM to cope with business-specific data and requirements commercial FM software using standardised BIMthe ability to add (organisation-specific) intelligence to the modela roadmap for Sydney Opera House to adopt BIM for FM.
Resumo:
Security-critical communications devices must be evaluated to the highest possible standards before they can be deployed. This process includes tracing potential information flow through the device's electronic circuitry, for each of the device's operating modes. Increasingly, however, security functionality is being entrusted to embedded software running on microprocessors within such devices, so new strategies are needed for integrating information flow analyses of embedded program code with hardware analyses. Here we show how standard compiler principles can augment high-integrity security evaluations to allow seamless tracing of information flow through both the hardware and software of embedded systems. This is done by unifying input/output statements in embedded program execution paths with the hardware pins they access, and by associating significant software states with corresponding operating modes of the surrounding electronic circuitry.
Resumo:
For many organizations, maintaining and upgrading enterprise resource planning (ERP) systems (large packaged application software) is often far more costly than the initial implementation. Systematic planning and knowledge of the fundamental maintenance processes and maintenance-related management data are required in order to effectively and efficiently administer maintenance activities. This paper reports a revelatory case study of Government Services Provider (GSP), a high-performing ERP service provider to government agencies in Australia. GSP ERP maintenance-process and maintenance-data standards are compared with the IEEE/EIA 12207 software engineering standard for custom software, also drawing upon published research, to identify how practices in the ERP context diverge from the IEEE standard. While the results show that many best practices reflected in the IEEE standard have broad relevance to software generally, divergent practices in the ERP context necessitate a shift in management focus, additional responsibilities, and different maintenance decision criteria. Study findings may provide useful guidance to practitioners, as well as input to the IEEE and other related standards.
Resumo:
This chapter presents the contextual framework for the second phase of a multi-method, multiple study of the information systems (IS) academic discipline in Australia. The chapter outlines the genesis of a two-phase Australian study, and positions the study as the precursor to a larger Pacific-Asia study. Analysis of existing literature on the state of IS and on relevant theory underpins a series of individual Australian state case studies summarised in this chapter and represented as separate chapters in the book. This chapter outlines the methodological approach employed, with emphasis on the case-study method of the multiple state studies. The process of multiple peer review of the studies is described. Importantly, this chapter summarises and analyses each of the subsequent chapters of this book, emphasising the role of a framework developed to guide much of the data gathering and analysis. This chapter also highlights the process involved in conducting the meta-analysis reported in the final chapter of this book, and summarises some of the main results of the meta-analysis.
A research framework to investigate the performance of financial incentives in construction projects
Resumo:
Due to the popularity of modern Collaborative Virtual Environments, there has been a related increase in their size and complexity. Developers therefore need visualisations that expose usage patterns from logged data, to understand the structures and dynamics of these complex environments. This chapter presents a new framework for the process of visualising virtual environment usage data. Major components, such as an event model, designer task model and data acquisition infrastructure are described. Interface and implementation factors are also developed, along with example visualisation techniques that make use of the new task and event model. A case study is performed to illustrate a typical scenario for the framework, and its benefits to the environment development team.
Resumo:
Road crashes are now the most common cause of work-related injury, death and absence in a number of countries. Given the impact of workrelated driving crashes on social and economic aspects of business and the community, workrelated road safety and risk management has received increasing attention in recent years. However, limited academic research has progressed on improving safety within the work-related driving sector. The aim of this paper is to present a review of work-related driving safety research to date, and provide an intervention framework for the future development and implementation of workrelated driving safety intervention strategies.