786 resultados para Reporting Diversity project
Resumo:
Project Diagnostics is a tool for construction industry stakeholders wishing to improve project delivery and outcomes. This software identifies areas of poor project health, then establishes probable root causes and provides suggested remedial measures. Its focus is to act as an advanced warning system for construction projects that are failing to meet predetermined objectives based on the critical success factors (CSFs) of cost, time, quality, safety, relationships, environment and stakeholder value.
Resumo:
Australia has no nationally accepted building products life cycle inventory (LCI) database for use in building Ecologically Sustainable Development (ESD) assessment (BEA) tools. More information about the sustainability of the supply chain is limited by industry’s lack of real capacity to deliver objective information on process and product environmental impact. Recognition of these deficits emerged during compilation of a National LCI database to inform LCADesign, a prototype 3 dimensional object oriented computer aided design (3-D CAD) commercial building design tool. Development of this Australian LCI represents 24 staff years of effort here since 1995. Further development of LCADesign extensions is proposed as being essential to support key applications demanded from a more holistic theoretical framework calling for modules of new building and construction industry tools. A proposed tool, conceptually called LCADetails, is to serve the building product industries own needs as well as that of commercial building design amongst other industries’ prospective needs. In this paper, a proposition is examined that the existing national LCI database should be further expanded to serve Australian building product industries’ needs as well as to provide details for its client-base from a web based portal containing a module of practical supply and procurement applications. Along with improved supply chain assessment services, this proposed portal is envisaged to facilitate industry environmental life cycle improvement assessment and support decision-making to provide accredited data for operational reporting capabilities, load-based reasoning as well as BEA applications. This paper provides an overview of developments to date, including a novel 3-D CAD information and communications technology (ICT) platform for more holistic integration of existing tools for true cost assessment. Further conceptualisation of future prospects, based on a new holistic life cycle assessment framework LCADevelop, considering stakeholder relationships and their need for a range of complementary tools leveraging automated function off such ICT platforms to inform dimensionally defined operations for such as automotive, civil, transport and industrial applications are also explored.
Resumo:
Construction projects are faced with a challenge that must not be underestimated. These projects are increasingly becoming highly competitive, more complex, and difficult to manage. They become ‘wicked problems’, which are difficult to solve using traditional approaches. Soft Systems Methodology (SSM) is a systems approach that is used for analysis and problem solving in such complex and messy situations. SSM uses “systems thinking” in a cycle of action research, learning and reflection to help understand the various perceptions that exist in the minds of the different people involved in the situation. This paper examines the benefits of applying SSM to wicked problems in construction project management, especially those situations that are challenging to understand and difficult to act upon. It includes relevant examples of its use in dealing with the confusing situations that incorporate human, organizational and technical aspects.
Resumo:
Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
In moving from lowest cost adversarial based traditional procurement towards value driven methodologies the challenges range from re-engineering the process, to metrics and team alignment. This paper describes research into methodologies which encourage alignment of project partners towards achieving mutually beneficial goals. The research identifies nine variables which influence the achievement of successful projects delivering value. Results from case studies illustrate that not all parties can achieve value for themselves which directs attention to the balance between deliverables and the interests of team members. Re- valuing construction demands refocusing towards the delivery of operational assets and their place in the value system whilst recognising the need to manage the delivery process and the team to align the value to the parties. The objective of the project was to develop tools and recommendations for reform of project delivery in the building and construction industry to transform business-as-usual performance into exceptional performance. Benefits flow not only to the construction industry, but to the community as a whole because a more sophisticated industry can deliver more effective use of assets, financing, operating and maintenance of facilities to suit the community’s needs. This research was funded by the Australian Cooperative Research Centre for Construction Innovation.
Resumo:
A study into best practice project delivery and the development of a suite of products, resources and services to help guide clients and project teams towards the best approach for specific projects.
Resumo:
Many people and organisations continually repeat mistakes or fail to take advantage of opportunities because they have not learned from their past history, frequently as a result of not having taken the time to reflect and take stock of their experiences. This common error is avoidable, particularly with today’s capacity for information and communication technology (ICT) to enable organisations to not only record lessons learned but to easily make these available throughout an organisation. Moreover, the evidence of the literature and experience suggests that currently companies do not rigorously analyse past experience and log lessons learned using manual methods so it is hardly surprising that this trend is not changed by the availability of ICT.
Resumo:
Controlling the definition of what was essentially a subjugated culture, the colonisers reserve the power to distinguish authentic aspects of the living traditions of the colonised. If the colonised argue political demands by reference to their culture, the colonisers are quick to adjudicate what is genuine in such claims. (Fannon, 1967) Since colonial invasions, Australia’s Indigenous people have weathered rapid change. While the origins of Australia’s Indigenous peoples continues to be an archaeological interest for many, how Indigenous cultures have survived, transformed and retained a sense of ‘difference’ is fundamental to understanding the diversity of Aboriginal and Torres Strait Islander cultures within this continent as both contemporaneous and historical. It is important that teachers, students and researchers within Indigenous studies remind themselves that much of the literature on Aboriginal and Torres Strait Islanders can be ideologically traced back to the emergence of ‘knowledge’ about native peoples in the context of European imperialism and expansion from the fifteenth century. Care must therefore be taken in not conveying ‘scientific’ rational knowledge as perhaps the hidden agenda or notion of assumptions of European ‘superiority’ and non-European inferiority. The recognition by the High Court of Australia (1992) abandoned the legal myth of terra nullius which based the dispossession of Indigenous land on the basis of it being considered an empty land. It could also be argued that this decision recognised that distinct customs and traditions continue to exist within the social and cultural ‘knowledge’ of Indigenous peoples of Australia. General issues and concerns relating to research design, methodology and articulation within QUT are not just confined to this university and the research project presented as a case study but are important in dealing with how Aboriginal and Torres Strait Islander students and academics participate or are employed within the university. We feel that the design and methodology of research that either covertly or overtly focuses on Indigenous Australians can no longer presume that all research will naturally follow protocols that are culturally appropriate as this appropriateness is usually defined by the institution. By no means do we feel that research should be debilitated as a result of raising these issues, but that collaborative approaches within the ‘process’ of research will address Aboriginal and Torres Strait Islander people and communities as much as the intended outcomes of research itself.
Resumo:
This paper provides an overview of the current QUT Spatial Science undergraduate program based in Brisbane, Queensland, Australia. It discusses the development and implementation of a broad-based educational model for the faculty of built environment and engineering courses and specifically to the course structure of the new Bachelor of Urban Development (Spatial Science) study major. A brief historical background of surveying courses is discussed prior to the detailing of the three distinct and complementary learning themes of the new course structure with a graphical course matrix. Curriculum mapping of the spatial science major has been undertaken as the course approaches formal review in late 2010. Work-integrated learning opportunities have been embedded into the curriculum and a brief outline is presented. Some issues relevant to the tertiary surveying/ spatial sector are highlighted in the context of changing higher education environments in Australia.
Resumo:
This study investigates the impact of the New Basics Project on teachers at a special school for students with intellectual impairments. The study is aimed at exploring the complex nature of the work of special educators as they enact the New Basics curriculum with a particular focus on the teachers’ opinions about challenges that arose for their curriculum, pedagogy and assessment practices. Attention is also paid to how the principal’s leadership supported the enactment of the New Basics in respect to what he did and why he used particular strategies. The nine teachers and their principal were involved in a series of in-depth, semi-structured interviews from one of only three special schools in phase one of the New Basics trial in Queensland, Australia. These interviews produced data from the special educators as they were confronted with a new curriculum that challenged their previous teaching practices. The enactment of the New Basics curriculum occurred within the context of a state-sanctioned mandate to provide alternative programs to those offered in mainstream schools, for students with special needs. This thesis explores these teachers' experiences using critical theory as a basis for analyzing their opinions on issues such as the role of the special educator, tensions between old and new curricula, pedagogical and assessment practices, and connections between the at-school learning experiences for intellectually impaired students and the realities of post-school life. The investigation also examines the leadership conduct of the principal in changing times at the school. The findings suggest that the New Basics has played a significant role in providing structures for developing communities of practice amongst teachers; in supporting special educators to focus more on the educational needs of the students (e.g., literacy, numeracy, financial planning) and less on their medical needs (e.g., toileting, feeding, personal hygiene); and supporting school leadership that empowers and listens critically to teachers as essential components of the successful enactment of curriculum reforms like the New Basics.
Resumo:
The implementation of effective science programmes in primary schools is of continuing interest and concern for professional developers. As part of the Australian Academy of Science's approach to creating an awareness of Primary Investigations, a project team trialled a series of satellite television broadcasts of lessons related to two units of the curriculum for Year 3 and 4 children in 48 participating schools. The professional development project entitled Simply Science, included a focused component for the respective classroom teachers, which was also conducted by satellite. This paper reports the involvement of a Year 4 teacher in the project and describes her professional growth. Already an experienced and confident teacher, no quantitative changes in science teaching self efficacy were detected. However, her pedagogical content knowledge and confidence to teach science in the concept areas of matter and energy were enhanced. Changes in the teacher's views about the co-operative learning strategies espoused by Primary Investigations were also evident. Implications for the design of professional development programmes for primary science teachers are discussed.
Resumo:
The management of main material prices of provincial highway project quota has problems of lag and blindness. Framework of provincial highway project quota data MIS and main material price data warehouse were established based on WEB firstly. Then concrete processes of provincial highway project main material prices were brought forward based on BP neural network algorithmic. After that standard BP algorithmic, additional momentum modify BP network algorithmic, self-adaptive study speed improved BP network algorithmic were compared in predicting highway project main prices. The result indicated that it is feasible to predict highway main material prices using BP NN, and using self-adaptive study speed improved BP network algorithmic is the relatively best one.