250 resultados para Remote operation
Resumo:
Background Heart failure (HF) remains a condition with high morbidity and mortality. We tested a telephone support strategy to reduce major events in rural and remote Australians with HF, who have limited healthcare access. Telephone support comprised an interactive telecommunication software tool (TeleWatch) with follow-up by trained cardiac nurses. Methods Patients with a general practice (GP) diagnosis of HF were randomised to usual care (UC) or UC and telephone support intervention (UC+I) using a cluster design involving 143 GPs throughout Australia. Patients were followed for 12 months. The primary end-point was the Packer clinical composite score. Secondary end-points included hospitalisation for any cause, death or hospitalisation, as well as HF hospitalisation. Results Four hundred and five patients were randomised into CHAT. Patients were well matched at baseline for key demographic variables. The primary end-point of the Packer Score was not different between the two groups (P=0.98), although more patients improved with UC+I. There were fewer patients hospitalised for any cause (74 versus 114, adjusted HR 0.67 [95% CI 0.50-0.89], p=0.006) and who died or were hospitalised (89 versus 124, adjusted HR 0.70 [95% CI 0.53 – 0.92], p=0.011), in the UC+I vs UC group. HF hospitalisations were reduced with UC+I (23 versus 35, adjusted HR 0.81 [95% CI 0.44 – 1.38]), although this was not significant (p=0.43). There were 16 deaths in the UC group and 17 in the UC+I group (p=0.43). Conclusions Although no difference was observed in the primary end-point of CHAT (Packer composite score), UC+I significantly reduced the number of HF patients hospitalised amongst a rural and remote cohort. These data suggest that telephone support may be an efficacious approach to improve clinical outcomes in rural and remote HF patients.
Resumo:
This paper addresses development of an ingenious decision support system (iDSS) based on the methodology of survey instruments and identification of significant variables to be used in iDSS using statistical analysis. A survey was undertaken with pregnant women and factorial experimental design was chosen to acquire sample size. Variables with good reliability in any one of the statistical techniques such as Chi-square, Cronbach’s α and Classification Tree were incorporated in the iDSS. The ingenious decision support system was implemented with Visual Basic as front end and Microsoft SQL server management as backend. Outcome of the ingenious decision support system include advice on Symptoms, Diet and Exercise to pregnant women.
Importance of a resilient air services network to Australian remote, rural, and regional communities
Resumo:
Rural, regional, and remote settlements in Australia require resilient infrastructure to remain sustainable in a context characterized by frequent large-scale natural disasters, long distances between urban centers, and the pressures of economic change. A critical aspect of this infrastructure is the air services network, a system of airports, aircraft operators, and related industries that enables the high-speed movement of people, goods, and services to remote locations. A process of deregulation during the 1970s and 1980s resulted in many of these airports passing into local government and private ownership, and the rationalization of the industry saw the closure of a number of airlines and airports. This paper examines the impacts of deregulation on the resilience of air services and the contribution that they make to regional and rural communities. In particular, the robustness, redundancy, resourcefulness, and rapidity of the system are examined. The conclusion is that while the air services network has remained resilient in a situation of considerable change, the pressures of commercialization and the tendency to manage aspects of the system in isolation have contributed to a potential decrease in overall resilience.
Resumo:
The reliable operation of the electrical system at Callide Power Station is of extreme importance to the normal everyday running of the Station. This study applied the principles of reliability to do an analysis on the electrical system at Callide Power Station. It was found that the level of expected outage cost increased exponentially with a declining level of maintenance. Concluding that even in a harsh economic electricity market where CS Energy tries and push their plants to the limit, maintenance must not be neglected. A number of system configurations were found to increase the reliability of the system and reduce the expected outage costs. A number of other advantages were identified as a result of using reliability principles to do this study on the Callide electrical system configuration.
Resumo:
This paper focuses on the super/sub-synchronous operation of the doubly fed induction generator (DFIG) system. The impact of a damping controller on the different modes of operation for the DFIG based wind generation system is investigated. The co-ordinated tuning of the damping controller to enhance the damping of the oscillatory modes using bacteria foraging (BF) technique is presented. The results from eigenvalue analysis are presented to elucidate the effectiveness of the tuned damping controller in the DFIG system. The robustness issue of the damping controller is also investigated
Resumo:
An energy storage system (ESS) can provide ancillary services such as frequency regulation and reserves, as well as smooth the fluctuations of wind power outputs, and hence improve the security and economics of the power system concerned. The combined operation of a wind farm and an ESS has become a widely accepted operating mode. Hence, it appears necessary to consider this operating mode in transmission system expansion planning, and this is an issue to be systematically addressed in this work. Firstly, the relationship between the cost of the NaS based ESS and its discharging cycle life is analyzed. A strategy for the combined operation of a wind farm and an ESS is next presented, so as to have a good compromise between the operating cost of the ESS and the smoothing effect of the fluctuation of wind power outputs. Then, a transmission system expansion planning model is developed with the sum of the transmission investment costs, the investment and operating costs of ESSs and the punishment cost of lost wind energy as the objective function to be minimized. An improved particle swarm optimization algorithm is employed to solve the developed planning model. Finally, the essential features of the developed model and adopted algorithm are demonstrated by 18-bus and 46-bus test systems.