355 resultados para Innominate Contract
Resumo:
Cell sheets can be used to produce neo-tissue with mature extracellular matrix. However, extensive contraction of cell sheets remains a problem. We devised a technique to overcome this problem and applied it to tissue engineer a dermal construct. Human dermal fibroblasts were cultured with poly(lactic-co-glycolic acid)-collagen meshes and collagen-hyaluronic acid foams. Resulting cell sheets were folded over the scaffolds to form dermal constructs. Human keratinocytes were cultured on these dermal constructs to assess their ability to support bilayered skin regeneration. Dermal constructs produced with collagen-hyaluronic acid foams showed minimal contraction, while those with poly(lactic-co-glycolic acid)-collagen meshes curled up. Cell proliferation and metabolic activity profiles were characterized with PicoGreen and AlamarBlue assays, respectively. Fluorescent labeling showed high cell viability and F-actin expression within the constructs. Collagen deposition was detected by immunocytochemistry and electron microscopy. Transforming Growth Factor-alpha and beta1, Keratinocyte Growth Factor and Vascular Endothelial Growth Factor were produced at various stages of culture, measured by RT-PCR and ELISA. These results indicated that assimilating cell sheets with mechanically stable scaffolds could produce viable dermal-like constructs that do not contract. Repeated enzymatic treatment cycles for cell expansion is unnecessary, while the issue of poor cell seeding efficiency in scaffolds is eliminated.
Resumo:
The paper examines the fallout of the Lehman Brothers collapse in Hong Kong. As an international financial hub in Asia, Hong Kong was profoundly affected by the collapse of this company. As a result, it impacted negatively on the public’s confidence in the Hong Kong’s banking sector. Furthermore, this event has exposed a number of regulatory deficiencies in Hong Kong. In response to this financial crisis, the Hong Kong government had made an unprecedented move to negotiate with local banks to refund the investors. In addition, the government has also sought public consultation on proposal to enhance the regulation of the sale of financial products. This paper argues that there needs to be amendments to the prevailing laws and the inclusions of legal rules to back up those proposed measures so that the disclosed information from the financial institution will not mislead the investors or misrepresent the products offered.
Resumo:
Purpose: To provide recommendations for construction clients who design and implement financial incentive mechanisms (FIMs) on projects. ---------- Methodology: Four large Australian building projects commissioned by government clients under managing contractor contracts and completed between 2001 and 2005 were examined to explore the ‘drivers’ that promoted motivation toward financial incentive goals. The results were triangulated across data sources, projects and stakeholder types. ---------- Findings: FIM design should incorporate: 1. flexibility to modify goals and measurement procedures over time, 2. multiple goals covering different project areas, 3. distribution of rewards across all the key organizations contributing to team performance (e.g. potentially not just the contractor, but the subcontractors and consultants) and a reward amount sufficient to be valued by potential recipients. FIM benefits are maximized through the following complementary procurement initiatives: 4. equitable contract risk allocation, 5. early contractor involvement in design, 6. value-driven tender selection, 7. relationship workshops, and 8. future work opportunities.---------- Research Limitations: This paper provides practical recommendations to industry and hence does not emphasize theoretical aspects.---------- Practical Implications: The uptake of these recommendations is likely to increase the impact of FIMs on motivation and improve project and industry outcomes. Although the study focuses on government clients of building projects, all the recommendations would seem to apply equally to private-sector clients and to non-building projects.---------- Originality: In order to improve motivation and reward high performance, clients are increasingly using FIM in their construction contracts. Despite the rising use of financial incentives, there is a lack of comprehensive construction-specific knowledge available to help clients maximize outcomes. The study addresses this gap in the literature.
Resumo:
Construction industry observers tout the use of financial incentives as promoters of motivation and commitment on projects. Yet, little empirical evidence exists concerning their effectiveness. What are the drivers of motivation on construction projects? The reasons that construction project participants are motivated to pursue voluntary incentive goals are examined through four Australian case studies. The results demonstrate the critical role played by project relationships and equitable contract conditions in promoting the effectiveness of financial incentives. In the context of a construction project, this study finds financial incentives to be less important to motivation and performance than relationship enhancement initiatives. This finding is unexpected and has implications for the design of project procurement strategies. These results suggest if project clients ignore the importance of relationship quality between participants, the impact of any financial incentive will be compromised.
Resumo:
Immediate indefeasibility is the cornerstone of the Torrens system of land registration. However, when combined with the apparent ease in which forged mortgages become registered, the operation of this doctrine can come into question. This article seeks to argue that, rather than question indefeasibility, the focus should be on the verification of identity of parties to land transactions. Whilst no system can ever be infallible, it is suggested that by correctly imposing the responsibility for identity verification on the appropriate individual, the Torrens system can retain immediate indefeasibility as its paramount principle, yet achieve the optimum level of fairness in terms of allocation of responsibility and loss. With the dawn of a new era of electronic conveyancing about to begin, the framework suggested here provides a model for minimising the risks of forged mortgages and appropriately allocating the loss.
Resumo:
Franchisor failure is one of the most problematic areas of the franchise relationship. It impacts negatively on landlords and other suppliers, but the contracting parties that are currently without legal rights to respond when a franchisor fails, and thus without consumer protection, are its franchisees. In this thesis I explore the current contractual, regulatory and commercial environment that franchisees inhabit, within the context of franchisor failure. I conclude that ex ante there are opportunities to level the playing field through consumer protection legislation. I also conclude that the task is not one solely for the consumer protection legislation; the problem should also be addressed ex post through the Corporations Act.
Resumo:
Hong Kong is a modern global city with a reputation for well-regulated financial markets, but for years, the government had been trying to enact laws on corporate rescue procedures with relatively little success. It is under the pretext of the Global Financial Crisis, the threat of a future economic meltdown gave the Hong Kong government the impetus to revisit this issue. This third attempt to codify statutory obligations on directors’ liability for insolvent trading has been criticised for either setting the standards too high or low for directors trading whilst insolvent. There is also some reservation given the beliefs and values of directors in Chinese family-owned and controlled companies. These companies would most likely trade out the difficult times. Nevertheless, this does not negate from the fact that the enactment of corporate rescue procedures in Hong Kong in 2010 is a momentous achievement for the Hong Kong government.
Resumo:
This paper describes the design process and curriculum for a learning cohort of eight managers who came from public and private providers of vocational education and training. While the authors found no discussion on developing research knowledge and skills of managers using learning cohorts, the general learning cohorts literature provided a number of recommendations for learning cohort design. The initial stages of the learning cohort were evaluated. The results highlighted the importance of clarifying the psychological contract and its use in self-selection, supported the recommendations in the literature of the significance of the careful design and implementation of an initial residential workshop and also found support for further residential workshops of a similar design. The attendance of the cohort members in tow faculty wide core research units drew mixed comments.
Resumo:
The workplace is evolving and the predicted impact of demographic changes (Salt, 2009; Taylor, 2005) has seen organisations focus on strategic workforce planning. As part of this, many organisations have established or expanded formalised graduate programs to attract graduates and transition them effectively into organisations (McDermott, Mangan, & O'Connor, 2005; Terjesen, Freeman, & Vinnicombe, 2007). The workplace context is also argued to be changing because of the divergence in preferences and priorities across the different generations in the workplace - a topic which is prolific in the popular culture media but is yet to be fully developed in the academic literature (Jorgenson, 2003). The public sector recruits large numbers of graduates and maintains well established graduate programs. Like the workplace context, the public sector is seen to be undergoing a transition to more closely align its practices and processes with that of the private sector (Haynes & Melville Jones, 1999; N. Preston, 1995). Consequently, questions have been raised as to how new workforce entrants see the public sector and its associated attractiveness as an employment option. This research draws together these issues and reviews the formation of, and change in, the psychological contracts of graduates across ten Queensland public sector graduate programs. To understand the employment relationship, the theories of psychological contract and public service motivation are utilised. Specifically, this research focuses on graduates' and managers' expectations over time, the organisational perspective of the employment relationship and how ideology influences graduates' psychological contract. A longitudinal mixed method design, involving individual interviews and surveys, is employed along with significant researcher-practitioner collaboration throughout the research process. A number of important qualitative and quantitative findings arose from this study and there was strong triangulation between results from the two methods. Prior to starting with the organisation, graduates found it difficult to articulate their expectations; however, organisational experience rapidly brought these to the fore. Of the expectations that became salient, most centred on their relationship with their supervisor. Without experience and quality information on which to base their expectations, graduates tended to over-rely on sectoral stereotypes which negatively impacted their psychological contracts. Socialisation only limited affected graduates' psychological contracts and public service motivation. The graduate survey, measured thrice throughout the first 12 months of the graduate program, revealed that the psychological contract and public service motivation results followed a similar trajectory of beginning at mediocre levels, declining between times one and two and increasing between times two and three (although this is not back to original levels). Graduates attributed these to a number of sectoral, organisational, team, supervisory and individual factors. On a theoretical level, this research provides support for the notion of ideology within the psychological contract although it raises some important questions about how it is conceptualised. Additionally, support is given for the manager to be seen as the primary organisational counterpart to the employee in future theoretical and practical work. The research also argues to extend current notions of time within the psychological contract as this seems to be the most divergent and combustible issue across the generations in terms of how the workplace is perceived. A number of practical implications also transpire from the study and the collaborative foundation was highly successful. It is anticipated that this research will make a meaningful contribution to both the theory and practice of the employment relationship with particular regard to graduates entering the public sector.
Resumo:
An elective internship unit as part of a work integrated learning program in a business faculty is presented as a case study. In the unit, students complete a minimum of 120 hours work placement over the course of a 13 week semester. The students are majoring in advertising, marketing, or public relations and are placed in corporations, government agencies, and not for profit organisations. To support and scaffold the students’ learning in the work environment, a range of classroom and online learning activities are part of the unit. Classroom activities include an introductory workshop to prepare students for placement, an industry panel, and interview workshop. These are delivered as three workshops across the semester. Prior to commencing their placement, students complete a suite of online learning modules. The Work Placement Preparation Program assists students in securing obtaining a placement and make a successful transition to the work environment. It provides an opportunity for students to source possible work placement sites, prepare competitive applications, develop and rehearse interview skills, deal with workplace issues, and use a student ePortfolio to reflect on their skills and achievements. Students contribute to a reflective blog throughout their placement, with feedback from academic supervisors throughout the placement. The completion of the online learning modules and contribution to a reflective blog are assessed as part of the unit. Other assessment tools include a internship plan and learning contract between the student, industry supervisor, and academic supervisor; job application including responses to selection criteria; and presentation to peers, academics and industry representatives at a poster session. The paper discusses the development of the internship unit over three years, particularly learning activities and assessment. The reflection and refinement of the unit is informed by a pedagogical framework, and the development of processes to best manage placement for all stakeholders. A model of best practice is proposed, that can be adapted to a variety of discipline areas.
Resumo:
Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP ----- ----- Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trial. ----- ----- Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. ----- ----- This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.
Resumo:
Project alliancing is a new alternative to traditional project delivery systems, especially in the commercial building sector. The Collaborative Process is a theoretical model of people and systems characteristics that are required to reduce the adversarial nature of most construction projects. Although developed separately, both are responses to the same pressures. Project alliancing was just used successfully to complete the National Museum of Australia. This project was analyzed as a case study to determine the extent to which it could be classified as a “collaborative project”. Five key elements of The Collaborative Process were reviewed and numerous examples from the management of this project were cited that support the theoretical recommendations of this model. In the case of this project, significant added value was delivered to the client and many innovations resulted from the collective work of the parties to the contract. It was concluded that project alliances for commercial buildings offer many advantages over traditional project delivery systems, which are related to increasing the levels of collaboration among a project management team.