658 resultados para IT infrastructure management
Resumo:
Design-Build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to its many advantages. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. This paper reviews the existing literature to explore factors that can influence the successful implementation of DB project delivery system in Indonesian road infrastructure projects. It founds the lack of clarification in existing legislations as well as the lack of experiences, knowledge and skill as the main obstacles in implementing DB systems in Indonesia. To overcome these obstacles, this paper proposes (1) A relook at existing legislation in term of providing more guidance on determining projects appropriate for the DB, procedures for implementing DB, and the structure of builder entity; (2) To develop the skills and knowledge of DB to all stakeholders through communications, knowledge sharing and training. The outcome of this review can serve as a guide to development a framework for the implementation of the design-build project delivery system in Indonesian road infrastructure projects.
Resumo:
The primary goal of the Vehicular Ad Hoc Network (VANET) is to provide real-time safety-related messages to motorists to enhance road safety. Accessing and disseminating safety-related information through the use of wireless communications technology in VANETs should be secured, as motorists may make critical decisions in dealing with an emergency situation based on the received information. If security concerns are not addressed in developing VANET systems, an adversary can tamper with, or suppress, the unprotected message to mislead motorists to cause traffic accidents and hazards. Current research on secure messaging in VANETs focuses on employing the certificate-based Public Key Infrastructure (PKI) scheme to support message encryption and digital signing. The security overhead of such a scheme, however, creates a transmission delay and introduces a time-consuming verification process to VANET communications. This thesis has proposed a novel public key verification and management approach for VANETs; namely, the Public Key Registry (PKR) regime. Compared to the VANET PKI scheme, this new approach can satisfy necessary security requirements with improved performance and scalability, and at a lower cost by reducing the security overheads of message transmission and eliminating digital certificate deployment and maintenance issues. The proposed PKR regime consists of the required infrastructure components, rules for public key management and verification, and a set of interactions and associated behaviours to meet these rule requirements. This is achieved through a system design as a logic process model with functional specifications. The PKR regime can be used as development guidelines for conforming implementations. An analysis and evaluation of the proposed PKR regime includes security features assessment, analysis of the security overhead of message transmission, transmission latency, processing latency, and scalability of the proposed PKR regime. Compared to certificate-based PKI approaches, the proposed PKR regime can maintain the necessary security requirements, significantly reduce the security overhead by approximately 70%, and improve the performance by 98%. Meanwhile, the result of the scalability evaluation shows that the latency of employing the proposed PKR regime stays much lower at approximately 15 milliseconds, whether operating in a huge or small environment. It is therefore believed that this research will create a new dimension to the provision of secure messaging services in VANETs.
Resumo:
Humankind has been dealing with all kinds of disasters since the dawn of time. The risk and impact of disasters producing mass casualties worldwide is increasing, due partly to global warming as well as to increased population growth, increased density and the aging population. China, as a country with a large population, vast territory, and complex climatic and geographical conditions, has been plagued by all kinds of disasters. Disaster health management has traditionally been a relatively arcane discipline within public health. However, SARS, Avian Influenza, and earthquakes and floods, along with the need to be better prepared for the Olympic Games in China has brought disasters, their management and their potential for large scale health consequences on populations to the attention of the public, the government and the international community alike. As a result significant improvements were made to the disaster management policy framework, as well as changes to systems and structures to incorporate an improved disaster management focus. This involved the upgrade of the Centres for Disease Control and Prevention (CDC) throughout China to monitor and better control the health consequences particularly of infectious disease outbreaks. However, as can be seen in the Southern China Snow Storm and Wenchuan Earthquake in 2008, there remains a lack of integrated disaster management and efficient medical rescue, which has been costly in terms of economics and health for China. In the context of a very large and complex country, there is a need to better understand whether these changes have resulted in effective management of the health impacts of such incidents. To date, the health consequences of disasters, particularly in China, have not been a major focus of study. The main aim of this study is to analyse and evaluate disaster health management policy in China and in particular, its ability to effectively manage the health consequences of disasters. Flood has been selected for this study as it is a common and significant disaster type in China and throughout the world. This information will then be used to guide conceptual understanding of the health consequences of floods. A secondary aim of the study is to compare disaster health management in China and Australia as these countries differ in their length of experience in having a formalised policy response. The final aim of the study is to determine the extent to which Walt and Gilson’s (1994) model of policy explains how disaster management policy in China was developed and implemented after SARS in 2003 to the present day. This study has utilised a case study methodology. A document analysis and literature search of Chinese and English sources was undertaken to analyse and produce a chronology of disaster health management policy in China. Additionally, three detailed case studies of flood health management in China were undertaken along with three case studies in Australia in order to examine the policy response and any health consequences stemming from the floods. A total of 30 key international disaster health management experts were surveyed to identify fundamental elements and principles of a successful policy framework for disaster health management. Key policy ingredients were identified from the literature, the case-studies and the survey of experts. Walt and Gilson (1994)’s policy model that focuses on the actors, content, context and process of policy was found to be a useful model for analysing disaster health management policy development and implementation in China. This thesis is divided into four parts. Part 1 is a brief overview of the issues and context to set the scene. Part 2 examines the conceptual and operational context including the international literature, government documents and the operational environment for disaster health management in China. Part 3 examines primary sources of information to inform the analysis. This involves two key studies: • A comparative analysis of the management of floods in China and Australia • A survey of international experts in the field of disaster management so as to inform the evaluation of the policy framework in existence in China and the criteria upon which the expression of that policy could be evaluated Part 4 describes the key outcomes of this research which include: • A conceptual framework for describing the health consequences of floods • A conceptual framework for disaster health management • An evaluation of the disaster health management policy and its implementation in China. The research outcomes clearly identified that the most significant improvements are to be derived from improvements in the generic management of disasters, rather than the health aspects alone. Thus, the key findings and recommendations tend to focus on generic issues. The key findings of this research include the following: • The health consequences of floods may be described in terms of time as ‘immediate’, ‘medium term’ and ‘long term’ and also in relation to causation as ‘direct’ and ‘indirect’ consequences of the flood. These two aspects form a matrix which in turn guides management responses. • Disaster health management in China requires a more comprehensive response throughout the cycle of prevention, preparedness, response and recovery but it also requires a more concentrated effort on policy implementation to ensure the translation of the policy framework into effective incident management. • The policy framework in China is largely of international standard with a sound legislative base. In addition the development of the Centres for Disease Control and Prevention has provided the basis for a systematic approach to health consequence management. However, the key weaknesses in the current system include: o The lack of a key central structure to provide the infrastructure with vital support for policy development, implementation and evaluation. o The lack of well-prepared local response teams similar to local government based volunteer groups in Australia. • The system lacks structures to coordinate government action at the local level. The result of this is a poorly coordinated local response and lack of clarity regarding the point at which escalation of the response to higher levels of government is advisable. These result in higher levels of risk and negative health impacts. The key recommendations arising from this study are: 1. Disaster health management policy in China should be enhanced by incorporating disaster management considerations into policy development, and by requiring a disaster management risk analysis and disaster management impact statement for development proposals. 2. China should transform existing organizations to establish a central organisation similar to the Federal Emergency Management Agency (FEMA) in the USA or the Emergency Management Australia (EMA) in Australia. This organization would be responsible for leading nationwide preparedness through planning, standards development, education and incident evaluation and to provide operational support to the national and local government bodies in the event of a major incident. 3. China should review national and local plans to reflect consistency in planning, and to emphasize the advantages of the integrated planning process. 4. Enhance community resilience through community education and the development of a local volunteer organization. China should develop a national strategy which sets direction and standards in regard to education and training, and requires system testing through exercises. Other initiatives may include the development of a local volunteer capability with appropriate training to assist professional response agencies such as police and fire services in a major incident. An existing organisation such as the Communist Party may be an appropriate structure to provide this response in a cost effective manner. 5. Continue development of professional emergency services, particularly ambulance, to ensure an effective infrastructure is in place to support the emergency response in disasters. 6. Funding for disaster health management should be enhanced, not only from government, but also from other sources such as donations and insurance. It is necessary to provide a more transparent mechanism to ensure the funding is disseminated according to the needs of the people affected. 7. Emphasis should be placed on prevention and preparedness, especially on effective disaster warnings. 8. China should develop local disaster health management infrastructure utilising existing resources wherever possible. Strategies for enhancing local infrastructure could include the identification of local resources (including military resources) which could be made available to support disaster responses. It should develop operational procedures to access those resources. Implementation of these recommendations should better position China to reduce the significant health consequences experienced each year from major incidents such as floods and to provide an increased level of confidence to the community about the country’s capacity to manage such events.
Resumo:
Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). As background to this challenge, a brief review is given of current practice in the selection of major public sector infrastructure in Australia, along with a review of the related literature concerning the Multi-Attribute Utility Approach (MAUA) and the effect of MAUA on the role of risk management in procurement selection. To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision making model is mentioned. A brief summary is also given of the research method and hypothesis used to test and develop the new procurement model and which uses competition as the dependent variable and as a proxy for VfM. The hypothesis is given as follows: When the actual procurement mode matches the theoretical/predicted procurement mode (informed by the new procurement model), then actual competition is expected to match optimum competition (based on actual prevailing capacity vis-à-vis the theoretical/predicted procurement mode) and subject to efficient tendering. The aim of this paper is to report on progress towards testing this hypothesis in terms of an analysis of two of the four data components in the hypothesis. That is, actual procurement and actual competition across 87 road and health major public sector projects in Australia. In conclusion, it is noted that the Global Financial Crisis (GFC) has seen a significant increase in competition in public sector major road and health infrastructure and if any imperfections in procurement and/or tendering are discernible, then this would create the opportunity, through the deployment of economic principles embedded in the new procurement model and/or adjustments in tendering, to maintain some of this higher level post-GFC competition throughout the next business cycle/upturn in demand including private sector demand. Finally, the paper previews the next steps in the research with regard to collection and analysis of data concerning theoretical/predicted procurement and optimum competition.
Resumo:
Highway construction works have significant bearings on all aspects of sustainability. As they typically involve huge capital funds, stakeholders tend to place all interests on the financial justifications of the project, especially when embedding sustainability principles and practices may demand significant initial investment. Increasing public awareness and government policies demand that infrastructure projects respond to environmental challenges and people start to realise the negative consequences of not to pursue sustainability. Stakeholders are now keen to identify sustainable alternatives and financial implications of including them on a whole lifecycle basis. Therefore tools that aid the evaluation of investment options, such as provision of environmentally sustainable features in roads and highways, are highly desirable. Life-cycle cost analysis (LCCA) is generally recognised as a valuable approach for investment decision making for construction works. However to date it has limited application because the current LCCA models tend to focus on economic issues alone and are not able to deal with sustainability factors. This paper reports a research on identifying sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into existing LCCA models to produce a new sustainability based LCCA model with cost elements specific to sustainability measures. This presents highway project stakeholders a practical tool to evaluate investment decisions and reach an optimum balance between financial viability and sustainability deliverables.
Resumo:
Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.
Resumo:
With increasing media exposure and evidence of environmental impacts, it is increasingly recognized that incorporating sustainability principles in construction works is both crucial and beneficial. However a recent survey reveals that among stakeholders of infrastructure projects such as roads, there is no common understanding on what constitutes sustainability in real-life projects. Sustainability has been interpreted widely and differently and as a result, sustainability outcomes are not tangible at the project level or often neglected. Under such conditions, policies and strategies on sustainability remain largely ideological and cannot be sufficiently reflected in the actual project delivery. The major difficulty of this sustainability pursuit lies in the lack of consensus among the experts on sustainability criteria and indicators. To move ahead, these criteria and indicators are to be agreed upon. This paper reviews the sustainable infrastructure development, its criteria and indicators, focusing on road infrastructure context. It goes on to introduce a Delphi study, an integral part of a QUT research, aimed at identifying critical sustainability criteria and indicators for Australian road infrastructure projects. It paves the way for further identification of solutions for each critical indicator at a subsequent stage. The criteria, indicators and solutions will be encapsulated into a decision making framework for the enhancement of sustainability deliverables. By doing so, the research will promote more integrated thinking of and consistent approaches to the sustainability agenda in road and highway infrastructure projects in Australia.
Resumo:
Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.
Resumo:
Design-build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to the many advantages offered on projects by such systems. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. In order to provide evidence of the benefits of DB, it is essential to identify the factors that can contribute to successful DB implementation and this paper aims to provide evidence of such factors that can promote the successful implementation of DB project delivery systems on Indonesian road infrastructure projects. Four main factors and 28 indicators were identified from an extensive literature review, and a Delphi questionnaire survey was conducted amongst 20 experts drawn from the Indonesian road infrastructure construction sector. The first round Delphi study found that regulation, competency of clients, ability to manage DB projects and external conditions were the major factors that can promote successful DB implementation.
Resumo:
Information communication and technology (ICT) systems are almost ubiquitous in the modern world. It is hard to identify any industry, or for that matter any part of society, that is not in some way dependent on these systems and their continued secure operation. Therefore the security of information infrastructures, both on an organisational and societal level, is of critical importance. Information security risk assessment is an essential part of ensuring that these systems are appropriately protected and positioned to deal with a rapidly changing threat environment. The complexity of these systems and their inter-dependencies however, introduces a similar complexity to the information security risk assessment task. This complexity suggests that information security risk assessment cannot, optimally, be undertaken manually. Information security risk assessment for individual components of the information infrastructure can be aided by the use of a software tool, a type of simulation, which concentrates on modelling failure rather than normal operational simulation. Avoiding the modelling of the operational system will once again reduce the level of complexity of the assessment task. The use of such a tool provides the opportunity to reuse information in many different ways by developing a repository of relevant information to aid in both risk assessment and management and governance and compliance activities. Widespread use of such a tool allows the opportunity for the risk models developed for individual information infrastructure components to be connected in order to develop a model of information security exposures across the entire information infrastructure. In this thesis conceptual and practical aspects of risk and its underlying epistemology are analysed to produce a model suitable for application to information security risk assessment. Based on this work prototype software has been developed to explore these concepts for information security risk assessment. Initial work has been carried out to investigate the use of this software for information security compliance and governance activities. Finally, an initial concept for extending the use of this approach across an information infrastructure is presented.
Resumo:
Since the late twentieth century, there has been a shift away from delivery of infrastructure, including road networks, exclusively by the state. Subsequently, a range of alternative delivery models including governance networks have emerged. However, little is known about how connections between these networks and their stakeholders are created, managed or sustained. Using an analytical framework based on a synthesis of theories of network and stakeholder management, three cases in road infrastructure in Queensland, Australia are examined. The paper finds that although network management can be used to facilitate stakeholder engagement, such activities in the three cases are mainly focused within the core network of those most directly involved with delivery of the infrastructure often to the exclusion of other stakeholder groups.
Resumo:
There is increasing concern about the impact of employees‟ alcohol and other drug (AOD) consumption on workplace safety and performance, particularly within the construction industry. While most Australian jurisdictions have identified this as a critical safety issue, information is limited regarding the prevalence of AODs in the workplace and there is limited evidential guidance regarding how to effectively and efficiently address such an issue. The current research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce - to render it unacceptable to arrive at a construction workplace with impaired judgement from AODs. The study will adopt qualitative and quantitative methods to firstly evaluate the extent of general AOD use in the industry. Secondly, the development of an appropriate industry policy will adopt a non-punitive and rehabilitative approach developed in consultation with employers and employees across the infrastructure and building sectors, with the aim it be adopted nationally for adoption at the construction workplace. Finally, an industry specific cultural change management program and implementation plan will be developed through a nationally collaborative approach. Final results indicate that a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off cumulative score for risky or hazardous alcohol. Other drug use was also identified as a major issue. Results support the need for evidence-based, preventative educational initiatives that are tailored to the industry. This paper will discuss the final survey and interview results.
Resumo:
While business process management (BPM) is often associated with large investments in IT systems and process analysis projects, the success of BPM initiatives largely depends on the cultural readiness of organizations for process management. In this article, we introduce a model that helps to understand the role of culture in managing business processes and to take the right investments into the development of organizational culture. For that purpose, we also describe an assessment tool that allows examining the supportiveness of an organizational culture for BPM initiatives. We show how the results of such an assessment help organizations to determine in which areas of a corporation investments in cultural change can be most beneficial.
Resumo:
The advanced programmatic risk analysis and management model (APRAM) is one of the recently developed methods that can be used for risk analysis and management purposes considering schedule, cost, and quality risks simultaneously. However, this model considers those failure risks that occur only over the design and construction phases of a project’s life cycle. While it can be sufficient for some projects for which the required cost during the operating life is much less than the budget required over the construction period, it should be modified in relation to infrastructure projects because the associated costs during the operating life cycle are significant. In this paper, a modified APRAM is proposed, which can consider potential risks that might occur over the entire life cycle of the project, including technical and managerial failure risks. Therefore, the modified model can be used as an efficient decision-support tool for construction managers in the housing industry in which various alternatives might be technically available. The modified method is demonstrated by using a real building project, and this demonstration shows that it can be employed efficiently by construction managers. The Delphi method was applied in order to figure out the failure events and their associated probabilities. The results show that although the initial cost of a cold-formed steel structural system is higher than a conventional construction system, the former’s failure cost is much lower than the latter’s