169 resultados para Construction and demolition waste
Resumo:
Masonry is one of the most ancient construction materials in the World. When compared to other civil engineering practices, masonry construction is highly labour intensive, which can affect the quality and productivity adversely. With a view to improving quality and in light of the limited skilled labour in the recent times several innovative masonry construction methods such as the dry stack and the thin bed masonry have been developed. This paper focuses on the thin bed masonry system, which is used in many parts of Europe. Thin bed masonry system utilises thin layer of polymer modified mortars connecting the accurately dimensioned and/or interlockable units. This assembly process has the potential for automated panelised construction system in the industry setting or being adopted in the site using less skilled labour, without sacrificing the quality. This is because unlike the conventional masonry construction, the thin bed technology uses thinner mortar (or glue) layer which can be controlled easily through some novel methods described in this paper. Structurally, reduction in the thickness of the mortar joint has beneficial effects; for example it increases the compressive strength of masonry; in addition polymer added glue mortar enhances lateral load capacity relative to conventional masonry. This paper reviews the details of the recent research outcomes on the structural characteristics and construction practices of thin bed masonry. Finally the suitability of thin bed masonry in developing countries where masonry remains as the most common material for residential building construction is discussed.
Resumo:
Climate change, resource depletion and increasing urbanization are converging global issues that are challenging the way we design, construct and operate buildings. The housing sector is a significant contributor to these global issues through consumption of limited resources, waste generation and disposal (solid, liquid and atmospheric waste) and negative human health impacts (Senick 2006). Although the design and construction of ‘sustainable housing’ would appear to be an obvious and technically feasible solution, there remains multi-faceted issues affecting the delivery of sustainable housing (Holloway and Bunker 2006). Two fundamental issues - what makes a house sustainable, and to what extent regulation should be used to deliver sustainability - have been, and continue to be, debated at multiple levels in society. Despite personal, professional and political views on these issues, three key characteristics of the whole housing supply chain require fundamental change if we are to successfully address sustainability challenges (Birkeland 2008). These include: fragmentation; established methods, practices and processes, and the relationships between players. A more in-depth understanding of the role of ethics (values, beliefs and standards) and potential ethical conflicts within the supply chain will assist in better defining the nature of the fundamental changes required...
Resumo:
1.1 Background What is renewable energy education and training? A cursory exploration of the International Solar Energy Society website (www.ises.org) reveals numerous references to education and training, referring collectively to concepts of the transfer and exchange of information and good practices, awareness raising and skills development. The purposes of such education and training relate to changing policy, stimulating industry, improving quality control and promoting the wider use of renewable energy sources. The primary objective appears to be to accelerate a transition to a better world for everyone (ISEE), as the greater use of renewable energy is seen as key to climate recovery; world poverty alleviation; advances in energy security, access and equality; improved human and environmental health; and a stabilized society. The Solar Cities project – Habitats of Tomorrow – aims at promoting the greater use of renewable energy within the context of long term planning for sustainable urban development. The focus is on cities or communities as complete systems; each one a unique laboratory allowing for the study of urban sustainability within the context of a low carbon lifestyle. The purpose of this paper is to report on an evaluation of a Solar Community in Australia, focusing specifically on the implications (i) for our understandings and practices in renewable energy education and training and (ii) for sustainability outcomes. 1.2 Methodology The physical context is a residential Ecovillage (a Solar Community) in sub-tropical Queensland, Australia (latitude 28o south). An extensive Architectural and Landscape Code (A&LC) ‘premised on the interconnectedness of all things’ and embracing ‘both local and global concerns’ governs the design and construction of housing in the estate: all houses are constructed off-ground (i.e. on stumps or stilts) and incorporate a hybrid approach to the building envelope (mixed use of thermal mass and light-weight materials). Passive solar design, gas boosted solar water heaters and a minimum 1kWp photovoltaic system (grid connected) are all mandatory, whilst high energy use appliances such as air conditioners and clothes driers are not permitted. Eight families participated in an extended case study that encompassed both quantitative and qualitative approaches to better understand sustainable housing (perceived as a single complex technology) through its phases of design, construction and occupation. 1.3 Results The results revealed that the level of sustainability (i.e. the performance outcomes in terms of a low-carbon lifestyle) was impacted on by numerous ‘players’ in the supply chain, such as architects, engineers and subcontractors, the housing market, the developer, product manufacturers / suppliers / installers and regulators. Three key factors were complicit in the level of success: (i) systems thinking; (ii) informed decision making; and (iii) environmental ethics and business practices. 1.4 Discussion The experiences of these families bring into question our understandings and practices with regard to education and training. Whilst increasing and transferring knowledge and skills is essential, the results appear to indicate that there is a strong need for expanding our education efforts to incorporate foundational skills in complex systems and decision making processes, combined with an understanding of how our individual and collective values and beliefs impact on these systems and processes.
Resumo:
In 2001 China amended its copyright law in accordance with the requirements of the Agreement on Trade Related Aspects of Intellectual Property (TRIPS). This thesis explores the impact of copyright reform on China’s domestic film and music industries. Through extensive interviews with film and music industry workers – directors, producers, executives, judges, lawyers and musicians – it investigates the role of copyright in film and music’s shift from state driven to commercially focussed. The construction and negotiation of a new ‘copyright culture’ in China is examined through the lens of Yurchak’s (1999) concept of ‘entrepreneurial governmentality.’ Administrative structures put in place prior to China’s economic reform are no longer capable of controlling film and music production and consumption and new approaches to managing it are becoming more important. High levels of unauthorised distribution are forcing these industries to adapt their business models so that they can function in a system with weak copyright protection. Legal, economic and political changes have resulted in the emergence of an ‘entrepreneurial governmentality’ among film and music industry professionals. This commercially focussed group is, in turn, increasing pressure on the state to expand the space in which it can function and support efforts to strengthen the copyright system that allows it to exist. It is suggested that the construction and negotiation of a new ‘copyright culture’ is now taking place. This thesis describes the current situation in the film and music industries. It examines the tension between the theoretical possibilities created by copyright law, and the practical challenges of operating in China. It observes innovative business models being applied by film and music businesses in China. It discusses the impact of traditional attitudes to copying and also examines the role that open licensing models might play in helping limit the negative effects of copyright protection on public access to content and in raising levels of education about copyright among key groups within the community.
Resumo:
According to a recent report Australian higher education is not in crisis. However, we could be doing it better. The report Mapping Australian Higher Education (Norton, 2012) highlights comparative weaknesses such as levels f student engagement; interactions between students and academic staff; and academic staff preferences for research over teaching. The report points out that despite these concerns most graduates continue to get good, well-paid jobs, student satisfaction is improving, and levels of public confidence in Australian higher education are high. It also stresses that ‘the promise of higher education is that it provides adaptable cognitive skills, not that it always provides the job specific skills graduates will need in their future employment’ (Norton, 2012, p.58). This is worth keeping in mind as we contribute to the significant growth in curriculum initiatives aimed at preparing graduates for the world of work. Work Integrated Learning (WIL) is not a new concept but there is increased pressure on higher education globally to address graduate employability skills. The sector is under pressure in an increasingly competitive environment to demonstrate the relevance of courses, accountability and effective use of public funds (Peach & Gamble, 2011). In the Australian context this also means responding to the skills shortage in areas such as engineering, health, construction and business (DEEWR, 2010). This paper provides a brief overview of collaborative efforts over several years to improve the activity of WIL at the Queensland University of Technology (QUT). These efforts have resulted in changes to curriculum, pedagogy, systems and processes, and the initiation of local, regional, national, and international networks. The willingness of students, staff, and industry partners to ‘get stuck in’ and try new approaches in these different contexts can be understood as a form of boundary spanning. That is, the development of the capability to mediate between different forms of expertise and the demands of different contexts in order to nurture student learning and improve the outcomes of higher education through WIL (Peach, Cates, Ilg, Jones, Lechleiter, 2011).
Resumo:
The new competitive international business environment is characterised by constant change and uncertainty. This is particularly true in project-oriented industries such as construction where subcontracting and competitive tendering add new dimensions to an already uncertain working environment. Many management writers and practitioners argue that the changing business environment and the speed required to design, develop and market products and services will lead to increasing use of project management in the future. This means that project management skills will become a competitive weapon for those individuals and firms that properly develop them.
Resumo:
Public road authorities have a key responsibility in driving initiatives for reducing greenhouse gas (GHG) emissions in the road construction project lifecycle. A coherent and efficient chain of procurement processes and methods is needed to convert green policies into tangible actions that capture the potential for GHG reduction. Yet, many infrastructure clients lack developed methodologies regarding green procurement practices. Designing more efficient solutions for green procurement requires an evaluation of the current initiatives and stages of development. A mapping of the current GHG reduction initiatives in Australian public road procurement is presented in this paper. The study includes the five largest Australian state road authorities, which cover 94% of the total 817,089 km of Australian main roads (not local) and account for 96% of the total A$13 billion annual major road construction and maintenance expenditure. The state road authorities’ green procurement processes and tools are evaluated based on interviews and a review of documents. Altogether 12 people, comprising 1-3 people of each organisation, participated in the interviews and provided documents. An evaluation matrix was developed for mapping the findings across the lifecycle of road construction project delivery. The results show how Australian state road authorities drive decisions with an impact on GHG emissions on the strategic planning phase, project development phase, and project implementation phase. The road authorities demonstrate varying levels of advancement in their green procurement methodologies. Six major gaps in the current green procurement processes are identified and, respectively, six recommendations for future research and development are suggested. The greatest gaps remain in the project development phase, which has a critical role in fixing the project (GHG reduction) goals, identifying risks and opportunities, and selecting the contractor to deliver the project. Specifically, the role of mass-haul optimisation as a part of GHG minimisation was reviewed, and mass-haul management was found to be an underutilised element with GHG reduction potential.
Resumo:
The construction of a Lunar Base is seen as achievable. The paper provides a useful summary of challenges facing pioneers of lunar base construction. It highlights important aspects of the location and use of the facility, the local environment, the human physiological adaptation process, and a principal concern for the construction industry—construction materials and methods required to erect the facility. Specific emphasis is placed on the latter two major issues. The authors believe that a lunar base will be built, operated and maintained by humans. It may be the next generation that carry out these dreams, but it is research of the type reported in this paper that will make these dreams a reality.
Resumo:
The concept of Six Sigma was initiated in the 1980s by Motorola. Since then it has been implemented in several manufacturing and service organizations. Till now Six Sigma implementation is mostly limited to healthcare and financial services in private sector. Its implementation is now gradually picking up in services such as call center, education, construction and related engineering etc. in private as well as public sector. Through a literature review, a questionnaire survey, and multiple case study approach the paper develops a conceptual framework to facilitate widening the scope of Six Sigma implementation in service organizations. Using grounded theory methodology, this study develops theory for Six Sigma implementation in service organizations. The study involves a questionnaire survey and case studies to understand and build a conceptual framework. The survey was conducted in service organizations in Singapore and exploratory in nature. The case studies involved three service organizations which implemented Six Sigma. The objective is to explore and understand the issues highlighted by the survey and the literature. The findings confirm the inclusion of critical success factors, critical-to-quality characteristics, and set of tools and techniques as observed from the literature. In case of key performance indicator, there are different interpretations about it in literature and also by industry practitioners. Some literature explain key performance indicator as performance metrics whereas some feel it as key process input or output variables, which is similar to interpretations by practitioners of Six Sigma. The response of not relevant and unknown to us as reasons for not implementing Six Sigma shows the need for understanding specific requirements of service organizations. Though much theoretical description is available about Six Sigma, but there has been limited rigorous academic research on it. This gap is far more pronounced about Six Sigma implementation in service organizations, where the theory is not mature enough. Identifying this need, the study contributes by going through theory building exercise and developing a conceptual framework to understand the issues involving its implementation in service organizations.
Resumo:
The productivity of the construction industry worldwide has been declining over the past forty years. One approach to improving the situation is by the introduction of lean construction. The IKEA model has also been shown to be beneficial when used in the construction context. A framework is developed in which the lean construction concept is embodied within the IKEA model by integrating Virtual Prototyping (VP) technology and its implementation is described and evaluated through a real-life case implementing the lean production philosophy. The operational flows of the IKEA model and lean construction are then compared to analyze the feasibility of IKEA-based lean construction. It is concluded that the successful application of the IKEA model in this context will promote the implementation of lean construction and improve the efficiency of the industry.
Resumo:
Building prefabrication is known as Industrialised Building Systems (IBS) in Malaysia. This construction method possesses unique characteristics that are central to sustainable construction. For example, offsite construction enables efficient management of construction wastage by identifying major causes of waste arising during both the design and construction stages. These causes may then be eliminated by the improvement process in IBS component's manufacturing. However, current decisions on using IBS are typically financial driven and hinder the wider ranged adoption. In addition, current IBS misconceptions and the failure of rating schemes in evaluating the sustainability of IBS affect its implementation. A new approach is required to provide better understanding on the sustainability potential of IBS among stakeholders. Such approach should also help project the outcomes of each levels of decision-making to respond to social, economy and environmental challenges. This paper presents interim findings of research aimed at developing a framework for sustainable IBS development and suggests a more holistic approach to achieve sustainability. A framework of embedding sustainability factors is considered in three main phases of IBS construction; 1) Pre-construction, 2) Construction and 3) Post-construction phase. SWOT analysis was used to evaluate the strengths, weaknesses, opportunities and threats involved in the IBS implementations. The action plans are formulated from the analysis of sustainable objectives. This approach will show where and how sustainability should be integrated to improve IBS construction. A mix of quantitative and qualitative methodology was used in this research to explore the potential of IBS in integrating sustainability. The tools used in the study are questionnaires and semi-structured interviews. Outcomes from these tools lead to the identification of viable approaches involving 18 critical factors to improve sustainability in IBS constructions. Finally, guidelines for decision-making are being developed to provide a useful source of information and support to mutual benefit of the stakeholders in integrating sustainability issues and concepts into IBS applications.
Resumo:
The civil liability provisions relating to the assessment of damages for past and future economic loss have abrogated the common law principle of full compensation by imposing restrictions on the damages award, most commonly by a “three times average weekly earnings” cap. This consideration of the impact of those provisions is informed by a case study of the Supreme Court of Victoria Court of Appeal decision, Tuohey v Freemasons Hospital (Tuohey) , which addressed the construction and arithmetic operation of the Victorian cap for high income earners. While conclusions as to operation of the cap outside of Victoria can be drawn from Tuohey, a number of issues await judicial determination. These issues, which include the impact of the damages caps on the calculation of damages for economic loss in the circumstances of fluctuating income; vicissitudes; contributory negligence; claims per quod servitum amisit; and claims by dependants, are identified and potential resolutions discussed.
Resumo:
A building information model (BIM) provides a rich representation of a building's design. However, there are many challenges in getting construction-specific information from a BIM, limiting the usability of BIM for construction and other downstream processes. This paper describes a novel approach that utilizes ontology-based feature modeling, automatic feature extraction based on ifcXML, and query processing to extract information relevant to construction practitioners from a given BIM. The feature ontology generically represents construction-specific information that is useful for a broad range of construction management functions. The software prototype uses the ontology to transform the designer-focused BIM into a construction-specific feature-based model (FBM). The formal query methods operate on the FBM to further help construction users to quickly extract the necessary information from a BIM. Our tests demonstrate that this approach provides a richer representation of construction-specific information compared to existing BIM tools.
Resumo:
Infrastructure forms a vital component in supporting today’s way of life and has a significant role or impact on economic, environmental and social outcomes of the region around it. The design, construction and operation of such assets are a multi-billion dollar industry in Australia alone. Another issue that will play a major role in our way life is that of climate change and the greater concept of sustainability. With limited resources and a changing natural world it is necessary for infrastructure to be developed and maintained in a manner that is sustainable. In order to achieve infrastructure sustainability in operations it is necessary for there to be: a sustainability assessment scheme that provides a scientifically sound and realistic approach to measuring an assets level of sustainability; and, systems and tools to support the making of decisions that result in sustainable outcomes by providing feedback in a timely manner. Having these in place will then help drive the consideration of sustainability during the decision making process for infrastructure operations and maintenance. In this paper we provide two main contributions; a comparison and review of sustainability assessment schemes for infrastructure and their suitability for use in the operations phase; and, a review of decision support systems/tools in the area of infrastructure sustainability in operations. For this paper, sustainability covers not just the environment, but also finance/economic and societal/community aspects as well. This is often referred to as the Triple Bottom Line and forms one of the three dimensions of corporate sustainability [Stapledon, 2004].
Resumo:
Downtime (DT) caused by non-availability of equipment and equipment breakdown has non-trivial impact on the performance of construction projects. Earlier research has often addressed this fact, but it has rarely explained the causes and consequences of DT – especially in the context of developing countries. This paper presents a DT model to address this issue. Using this model, the generic factors and processes related to DT are identified, and the impact of DT is quantified. By applying the model framework to nine road projects in Nepal, the impact of DT is explored in terms of its duration and cost. The research findings highlight how various factors and processes interact with each other to create DT, and mitigate or exacerbate its impact on project performance. It is suggested that construction companies need to adopt proactive equipment management and maintenance programs to minimize the impact of DT.