648 resultados para Construction Civil
Resumo:
Partnering has drawn attention from both academics and practitioners in the construction industry in the context of construction and facilities management. The past decades have seen a number of articles reporting the application of partnering in construction. The Chinese construction industry is one of the largest industries in the world; however, to the authors’ best knowledge, no project in mainland China has adopted this procurement approach in a formal and systematic manner as yet. This study employed a qualitative approach to investigate the factors that support or impede the implementation of partnering in mainland China. The findings indicate that the partnering practice is feasible in the construction industry of China due to the large demand brought about by China’s strong economic growth and government support. However, the implementation of partnering in the Chinese construction industry is being impeded by the restrictions of the current Chinese regulatory framework and tender evaluation framework, the incompatible features of Chinese culture and the general lack of trust. Six strategies that help to facilitate the implementation of partnering in China have been developed. This study offers a useful reference to implement collaborative contracting models such as partnering in developing countries.
The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes
Resumo:
Purpose – Rehearsing practical site operations is without doubt one of the most effective methods for minimising planning mistakes, because of the learning that takes place during the rehearsal activity. However, real rehearsal is not a practical solution for on-site construction activities, as it not only involves a considerable amount of cost but can also have adverse environmental implications. One approach to overcoming this is by the use of virtual rehearsals. The purpose of this paper is to investigate an approach to simulation of the motion of cranes in order to test the feasibility of associated construction sequencing and generate construction schedules for review and visualisation. Design/methodology/approach – The paper describes a system involving two technologies, virtual prototyping (VP) and four-dimensional (4D) simulation, to assist construction planners in testing the sequence of construction activities when mobile cranes are involved. The system consists of five modules, comprising input, database, equipment, process and output, and is capable of detecting potential collisions. A real-world trial is described in which the system was tested and validated. Findings – Feedback from the planners involved in the trial indicated that they found the system to be useful in its present form and that they would welcome its further development into a fully automated platform for validating construction sequencing decisions. Research limitations/implications – The tool has the potential to provide a cost-effective means of improving construction planning. However, it is limited at present to the specific case of crane movement under special consideration. Originality/value – This paper presents a large-scale, real life case of applying VP technology in planning construction processes and activities.
Resumo:
The construction industry is an industry of major strategic importance. Its level of productivity has a significant effect on national economic growth. Productivity indicators are examined. The indicators consist of labour productivity, capital productivity, labour competitiveness, capital intensity and added value content of data, which are obtained from the published census/biannual surveys of the construction industry between the years 1999 and 2011 from the Department of Statistics of Malaysia. The results indicated that there is an improvement in the labour productivity, but the value-added content is declining. The civil engineering and special trades subsectors are more productive than the residential and non-residential subsectors in terms of labour productivity because machine-for-labour substitution is a more important process in those subsectors. The capital-intensive characteristics of civil engineering and special trade works enable these subsectors to achieve higher added value per labour cost but not the capital productivity. The added value per labour cost is lower in larger organizations despite higher capital productivity. However, the capital intensity is lower and unit labour cost is higher in the larger organizations.
Resumo:
The productivity of the construction industry worldwide has been declining over the past forty years. One approach to improving the situation is by the introduction of lean construction. The IKEA model has also been shown to be beneficial when used in the construction context. A framework is developed in which the lean construction concept is embodied within the IKEA model by integrating Virtual Prototyping (VP) technology and its implementation is described and evaluated through a real-life case implementing the lean production philosophy. The operational flows of the IKEA model and lean construction are then compared to analyze the feasibility of IKEA-based lean construction. It is concluded that the successful application of the IKEA model in this context will promote the implementation of lean construction and improve the efficiency of the industry.
Resumo:
Construction and demolition (C&D) waste occupies the largest share of overall waste generation in many countries. However, waste management practices and outcomes may differ between countries. For instance, in Australia, C&D waste recovery is continuously improving during the last years but the amount of C&D waste increases every year, as there has been little improvement in waste avoidance and minimization. In contrast, in Germany, waste generation remains constant over many years despite the continuous economic growth. The waste recycling rate in Germany is one of the highest in the world. However, most waste recycled is from demolition work rather than from waste generated during new construction. In addition, specific laws need to be developed to further reduce landfill of non-recycled waste. Despite of the differences, C&D waste generation and recovery in both countries depend on the effectiveness of the statutory framework, which regulates their waste management practices. This is an issue in other parts of the world as well. Therefore countries can learn from each other to improve their current statutory framework for C&D waste management. By taking Germany and Australia as an example, possible measures to improve current practices of C&D waste management through better statutory tools are identified in this paper. After providing an overview of the statutory framework of both countries and their status in waste generation and recovery, a SWOT analysis is conducted to identify strengths, weaknesses, opportunities and threats of the statutory tools. Recommendations to improve the current statutory frameworks, in order to achieve less waste generation and more waste recovery in the construction industry are provided for the German and Australian government and they can also be transferred to other countries.
Resumo:
The study presented in this paper reviewed 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011, in order to understand the relationships between the risk factors and injury severity (e.g. fatalities, hospitalized injuries, or non-hospitalized injuries) and to develop a strategic prevention plan to reduce the likelihood of fatalities where an accident is unavoidable. The study specifically aims to: (1) verify the relationships among risk factors, accident types, and injury severity, (2) determine significant risk factors associated with each accident type that are highly correlated to injury severity, and (3) analyze the impact of the identified key factors on accident and fatality occurrence. The analysis results explained that safety managers’ roles are critical to reducing human-related risks—particularly misjudgement of hazardous situations—through safety training and education, appropriate use of safety devices and proper safety inspection. However, for environment-related factors, the dominant risk factors were different depending on the different accident types. The outcomes of this study will assist safety managers to understand the nature of construction accidents and plan for strategic risk mitigation by prioritizing high frequency risk factors to effectively control accident occurrence and manage the likelihood of fatal injuries on construction sites.
Resumo:
IT-supported field data management benefits on-site construction management by improving accessibility to the information and promoting efficient communication between project team members. However, most of on-site safety inspections still heavily rely on subjective judgment and manual reporting processes and thus observers’ experiences often determine the quality of risk identification and control. This study aims to develop a methodology to efficiently retrieve safety-related information so that the safety inspectors can easily access to the relevant site safety information for safer decision making. The proposed methodology consists of three stages: (1) development of a comprehensive safety database which contains information of risk factors, accident types, impact of accidents and safety regulations; (2) identification of relationships among different risk factors based on statistical analysis methods; and (3) user-specified information retrieval using data mining techniques for safety management. This paper presents an overall methodology and preliminary results of the first stage research conducted with 101 accident investigation reports.
Resumo:
Client owners usually need an estimate or forecast of their likely building costs in advance of detailed design in order to confirm the financial feasibility of their projects. Because of their timing in the project life cycle, these early stage forecasts are characterized by the minimal amount of information available concerning the new (target) project to the point that often only its size and type are known. One approach is to use the mean contract sum of a sample, or base group, of previous projects of a similar type and size to the project for which the estimate is needed. Bernoulli’s law of large numbers implies that this base group should be as large as possible. However, increasing the size of the base group inevitably involves including projects that are less and less similar to the target project. Deciding on the optimal number of base group projects is known as the homogeneity or pooling problem. A method of solving the homogeneity problem is described involving the use of closed form equations to compare three different sampling arrangements of previous projects for their simulated forecasting ability by a cross-validation method, where a series of targets are extracted, with replacement, from the groups and compared with the mean value of the projects in the base groups. The procedure is then demonstrated with 450 Hong Kong projects (with different project types: Residential, Commercial centre, Car parking, Social community centre, School, Office, Hotel, Industrial, University and Hospital) clustered into base groups according to their type and size.
Resumo:
Although the drivers of innovation have been studied extensively in construction, greater attention is required on how innovation diffusion can be effectively assessed within this complex and interdependent project-based industry. The authors draw on a highly cited innovation diffusion model by Rogers (2006) and develop a tailored conceptual framework to guide future empirical work aimed at assessing innovation diffusion in construction. The conceptual framework developed and discussed in this paper supports a five-stage process model of innovation diffusion namely: 1) knowledge and idea generation, 2) persuasion and evaluation; 3) decision to adopt, 4) integration and implementation, and 5) confirmation. As its theoretical contribution, this paper proposes three critical measurements constructs which can be used to assess the effectiveness of the diffusion process. These measurement constructs comprise: 1) nature and introduction of an innovative idea, 2) organizational capacity to acquire, assimilate, transform and exploit an innovation, and 3) rates of innovation facilitation and adoption. The constructs are interpreted in the project-based context of the construction industry, extending the contribution of general management theorists. Research planned by the authors will test the validity and reliability of the constructs developed in this paper.
Resumo:
This paper extends the understanding of working-time changes and work-life balance (WLB) through analyzing a case study where a reduction in working hours designed to assist the workforce in balancing work and nonwork life was implemented. An alliance project in the Australian construction industry was established initially with a 5-day working week, a departure from the industry-standard 6-day week. However, a range of factors complicated the success of this initiative, and the industry-standard 6-day working week was reinstated for the project. The authors argue that this case is valuable in determining the complex mix of influences that work against a wholesale or straightforward adoption of working-time adjustments and work-life balance practices. It is concluded that although the prevailing workplace culture is considered an important factor in the determination of working time, structural and workplace principles and practices may also be critical in working to secure the successful introduction of working-time reduction and work-life balance initiatives in the construction industry in the future.
Resumo:
To enhance workplace safety in the construction industry it is important to understand interrelationships among safety risk factors associated with construction accidents. This study incorporates the systems theory into Heinrich’s domino theory to explore the interrelationships of risks and break the chain of accident causation. Through both empirical and statistical analyses of 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011, the study investigates relationships between accidents and injury elements (e.g., injury type, part of body, injury severity) and the nature of construction injuries by accident type. The study then discusses relationships between accidents and risks, including worker behavior, injury source, and environmental condition, and identifies key risk factors and risk combinations causing accidents. The research outcomes will assist safety managers to prioritize risks according to the likelihood of accident occurrence and injury characteristics, and pay more attention to balancing significant risk relationships to prevent accidents and achieve safer working environments.
Resumo:
The construction industry has been under pressure for many years to produce economical buildings which offer value for money, not only during the construction phase, but more importantly, during the full life of the building. Whole Life Cycle Costing (WLCC) is a relatively new concept for the construction industry especially on residential development and particularly for Malaysia. Discussing the speculation in using WLCC for the Malaysian residential constructions is the aim for this paper and it is one of the research questions on my research. This paper also wants to gather more speculation that may involve through others experienced. Basically, this paper is written to facilitate the current or future individual which will involve in residential property development sector with a new sensible approach to what at times seems impressively confusing especially in simplifying the operations and maintenance services and rehabilitation as well.
Resumo:
The focus of knowledge management (KM) in the construction industry is moving towards capability building for value creation. The study reported by this paper is motivated by recent assertions about the genesis and evolution of knowledge management capability (KMC) in the strategic management field. It attempts to shed light on the governance of learning mechanisms that develop KMC within the context of construction firms. A questionnaire survey was administered to a sample of construction contractors operating in the very dynamic Hong Kong market to elicit opinions on the learning mechanisms and business outcomes of targeted firms. On the basis of a total of 149 usable responses, structural equation modeling (SEM) analysis identified relationships among knowledge-governance mechanisms, knowledge processes, and business performance, thereby supporting the existence of strategic learning loops. The study findings provide evidence from the construction context for capability assertions that knowledge-governance mechanisms and processes form learning mechanisms that carry out strategic learning to create value, effect performance outcomes, and ultimately drive the evolution of KMC. The findings imply that it is feasible for managing construction firms to govern learning mechanisms through managing the capability-based holistic KM system, thereby reconfiguring KMC to match needs in the dynamic market environment over time.
Resumo:
A firm, as a dynamic, evolving, and quasi-autonomous system of knowledge production and application, develops knowledge management capability (KMC) through strategic learning in order to sustain competitive advantages in a dynamic environment. Knowledge governance mechanisms and knowledge processes connect and interact with each other forming learning mechanisms, which carry out double loop learning that drives genesis and evolution of KMC to modify operating routines that effect desired performance. This paper reports a study that was carried out within a context of construction contractors, a type of project-based firms, operating within the dynamic Hong Kong construction market. A multiple-case design was used to incorporate evidence from the literature and interviews, with the help of system dynamics modeling, to visualize the evolution of KMC. The study demonstrates the feasibility to visualize how a firm's KMC matches its operating environment over time. The findings imply that knowledge management (KM) applications can be better planned and controlled through evaluation of KM performance over time from a capability perspective.
Resumo:
This paper reports the findings of an in-depth literature review, which was designed as the first phase of a study that ultimately aims to rank the importance of key governance mechanisms on collaborative construction projects, in terms of impact on value-for-money. The absence of such information in the global knowledge base has prompted the current study. Seminal research completed recently concluded that deductive evidence with regard to the performance outcomes of collaborative procurement mechanisms is currently limited (Eriksson and Westerberg 2011). The authors aim to address this gap in current understanding. The literature review identifies key features of both formal and informal mechanisms which have been applied within collaborative contracting contexts. The literature review lays a solid foundation for designing a deductive research strategy to be implemented in the second phase of the study, which will employ a large-scale quantitative survey to shed light on the governance structures of collaborative contracts, and the ways in which they impact on realisation of VfM during project delivery in the Australian infrastructure industry. The current paper aims to identify the main categories of formal and informal governance mechanisms currently being employed globally. This will provide structure for the development of the survey in the second phase of the study.