280 resultados para Capacitor banks
Resumo:
If a real estate agent describes a property as being “a golden opportunity to invest” the expression will be readily construed as mere “puffery”. The legal landscape changes when a real estate agent describes a property as “leased” and having a “guaranteed net income”. Can an agent avoid potential liability, for an inaccurate description, by arguing that they were merely acting as a messenger to pass on information received from their vendor client? The potential liability of real estate agent “messengers” was recently considered by the Queensland Court of Appeal in Banks & Anor v Copas Newnham Pty Ltd & Ors [2002] QCA 217.
Resumo:
A pervasive and puzzling feature of banks’ Value-at-Risk (VaR) is its abnormally high level, which leads to excessive regulatory capital. A possible explanation for the tendency of commercial banks to overstate their VaR is that they incompletely account for the diversification effect among broad risk categories (e.g., equity, interest rate, commodity, credit spread, and foreign exchange). By underestimating the diversification effect, bank’s proprietary VaR models produce overly prudent market risk assessments. In this paper, we examine empirically the validity of this hypothesis using actual VaR data from major US commercial banks. In contrast to the VaR diversification hypothesis, we find that US banks show no sign of systematic underestimation of the diversification effect. In particular, diversification effects used by banks is very close to (and quite often larger than) our empirical diversification estimates. A direct implication of this finding is that individual VaRs for each broad risk category, just like aggregate VaRs, are biased risk assessments.
Resumo:
To assist road safety professionals in developing effective strategies to combat the risk associated with driving while fatigued, a survey was administered to 1000 Australian drivers. Participants reported their past behaviours in regards to driving while sleepy and their perceptions of risk associated with driving fatigued as compared to speeding and driving under the influence of alcohol. Although participants appeared to be aware of the substantial risk associated with driving while sleepy, many drivers reported that they frequently drive when sleepy. Age and gender comparisons, revealed that risk taking behaviour in regards to driving while sleepy is occurring across all age groups and in both male and female drivers. Overall young to middle age drivers and male drivers reported the highest frequency of driving while sleepy and reported the lowest perceived personal risk in regards to driving while sleepy.
Resumo:
In this paper, a comprehensive planning methodology is proposed that can minimize the line loss, maximize the reliability and improve the voltage profile in a distribution network. The injected active and reactive power of Distributed Generators (DG) and the installed capacitor sizes at different buses and for different load levels are optimally controlled. The tap setting of HV/MV transformer along with the line and transformer upgrading is also included in the objective function. A hybrid optimization method, called Hybrid Discrete Particle Swarm Optimization (HDPSO), is introduced to solve this nonlinear and discrete optimization problem. The proposed HDPSO approach is a developed version of DPSO in which the diversity of the optimizing variables is increased using the genetic algorithm operators to avoid trapping in local minima. The objective function is composed of the investment cost of DGs, capacitors, distribution lines and HV/MV transformer, the line loss, and the reliability. All of these elements are converted into genuine dollars. Given this, a single-objective optimization method is sufficient. The bus voltage and the line current as constraints are satisfied during the optimization procedure. The IEEE 18-bus test system is modified and employed to evaluate the proposed algorithm. The results illustrate the unavoidable need for optimal control on the DG active and reactive power and capacitors in distribution networks.
Resumo:
Single particle analysis (SPA) coupled with high-resolution electron cryo-microscopy is emerging as a powerful technique for the structure determination of membrane protein complexes and soluble macromolecular assemblies. Current estimates suggest that ∼104–105 particle projections are required to attain a 3 Å resolution 3D reconstruction (symmetry dependent). Selecting this number of molecular projections differing in size, shape and symmetry is a rate-limiting step for the automation of 3D image reconstruction. Here, we present SwarmPS, a feature rich GUI based software package to manage large scale, semi-automated particle picking projects. The software provides cross-correlation and edge-detection algorithms. Algorithm-specific parameters are transparently and automatically determined through user interaction with the image, rather than by trial and error. Other features include multiple image handling (∼102), local and global particle selection options, interactive image freezing, automatic particle centering, and full manual override to correct false positives and negatives. SwarmPS is user friendly, flexible, extensible, fast, and capable of exporting boxed out projection images, or particle coordinates, compatible with downstream image processing suites.
Resumo:
The U2 Tower competition entry involved the architectural design for a landmark office tower with associated head office for the world acclaimed rock band U2. The selected site for the office tower was located on the banks of the river Liffey, Dublin. The tower design was intended as a signifier or gateway to the docklands and the city itself. The proposed design incorporated a podium level for music retail and a media centre, a concourse level including cafeteria and outdoor areas as well as a commercial tower.
Resumo:
Purpose: The purpose of this paper is to identify changes in bank lending criteria due to the GFC and to explore the associated impacts on new housing supply in Queensland, Australia. Design/methodology/approach: This research involves a survey of each of Australia’s big four banks, as well as two prominent arrangers of development finance. Data on key lending criteria was collected: Pre GFC, during the GFC, and GFC recovery stage. Findings: The GFC has resulted in a retraction of funds available for residential development. The few institutions lending are filtering out only the best credit risks by way of constrictive loan covenants including: low loan to value ratios, high cash equity requirements, regional “no go” zones, and demonstrated borrower track record. The ability of developers to proceed with new housing developments is being constrained by their inability to obtain sufficient finance. Research limitations/implications: This research uses survey data, together with an understanding of the project finance process to extrapolate impacts on the residential development industry across Queensland. No regional or sub-market analysis is included. Future research will include subsequent surveys to track any loosening of credit policies over time and sub-market sector analysis. Practical implications: The inability to obtain project finance is identified as a key constraint to new housing supply. This research will inform policy makers and provide important quantitative evidence of the importance of availability of development finance in the housing supply chain. Social implications: Queensland is facing a supply shortfall, which if not corrected, may lead to upward pressure on house prices and falling housing affordability. Originality/value: There is very little academic research on development funding. This research is unique in linking bank lending criteria to new housing supply and demonstrating the impact on the development industry.
Resumo:
Determination of the placement and rating of transformers and feeders are the main objective of the basic distribution network planning. The bus voltage and the feeder current are two constraints which should be maintained within their standard range. The distribution network planning is hardened when the planning area is located far from the sources of power generation and the infrastructure. This is mainly as a consequence of the voltage drop, line loss and system reliability. Long distance to supply loads causes a significant amount of voltage drop across the distribution lines. Capacitors and Voltage Regulators (VRs) can be installed to decrease the voltage drop. This long distance also increases the probability of occurrence of a failure. This high probability leads the network reliability to be low. Cross-Connections (CC) and Distributed Generators (DGs) are devices which can be employed for improving system reliability. Another main factor which should be considered in planning of distribution networks (in both rural and urban areas) is load growth. For supporting this factor, transformers and feeders are conventionally upgraded which applies a large cost. Installation of DGs and capacitors in a distribution network can alleviate this issue while the other benefits are gained. In this research, a comprehensive planning is presented for the distribution networks. Since the distribution network is composed of low and medium voltage networks, both are included in this procedure. However, the main focus of this research is on the medium voltage network planning. The main objective is to minimize the investment cost, the line loss, and the reliability indices for a study timeframe and to support load growth. The investment cost is related to the distribution network elements such as the transformers, feeders, capacitors, VRs, CCs, and DGs. The voltage drop and the feeder current as the constraints are maintained within their standard range. In addition to minimizing the reliability and line loss costs, the planned network should support a continual growth of loads, which is an essential concern in planning distribution networks. In this thesis, a novel segmentation-based strategy is proposed for including this factor. Using this strategy, the computation time is significantly reduced compared with the exhaustive search method as the accuracy is still acceptable. In addition to being applicable for considering the load growth, this strategy is appropriate for inclusion of practical load characteristic (dynamic), as demonstrated in this thesis. The allocation and sizing problem has a discrete nature with several local minima. This highlights the importance of selecting a proper optimization method. Modified discrete particle swarm optimization as a heuristic method is introduced in this research to solve this complex planning problem. Discrete nonlinear programming and genetic algorithm as an analytical and a heuristic method respectively are also applied to this problem to evaluate the proposed optimization method.
Resumo:
The design grows out of the rich culture of circus and the rugged dynamic topography of Chongqing. The site for this project is nestled on the banks of the mighty Yangzte, China's longest river: a vast sweeping watery ribbon carving its way through the mountainous terrain. This swirling sinuous environmental thread replicates in nature the tweisting ribbons circling the gyrating circus gymnast. The project grows from intertwining these swirling parallel conceptions of 'ribbon'. A multi-layered envelope of glass and steel ribbons creates a dome like enclosure that wraps itself around the dynamic performing heart of the circus. The main auditorium and stage area are accommodated in this space. Key public elements and facilities are located adjacent to the new riverfront boulevard maximising the positive relationship with this attractive landscape zone. Service and support areas are located along the southern boundary. Key Statistics; Client: Chongqing Broadcast Bureau Developer: Chongqing Real Estate Site: 3.3 Ha Development: Total G.F.A.: 36,800m2 Project Cost: Total Investment: RMB 300 Million (A$48 million) Other competition participants were BIG-Bjarke Ingels Group (Denmark)/arquitectonica (USA)/Beijing Architectural Design Institute/East China Architectural Design Institute/China Architectural Design Academy.