A hybrid simulation framework to assess the impact of renewable generators on a distribution network
Resumo:
With an increasing number of small-scale renewable generator installations, distribution network planners are faced with new technical challenges (intermittent load flows, network imbalances…). Then again, these decentralized generators (DGs) present opportunities regarding savings on network infrastructure if installed at strategic locations. How can we consider both of these aspects when building decision tools for planning future distribution networks? This paper presents a simulation framework which combines two modeling techniques: agent-based modeling (ABM) and particle swarm optimization (PSO). ABM is used to represent the different system units of the network accurately and dynamically, simulating over short time-periods. PSO is then used to find the most economical configuration of DGs over longer periods of time. The infrastructure of the framework is introduced, presenting the two modeling techniques and their integration. A case study of Townsville, Australia, is then used to illustrate the platform implementation and the outputs of a simulation.
Resumo:
The behaviour of single installations of solar energy systems is well understood; however, what happens at an aggregated location, such as a distribution substation, when output of groups of installations cumulate is not so well understood. This paper considers groups of installations attached to distributions substations on which the load is primarily commercial and industrial. Agent-based modelling has been used to model the physical electrical distribution system and the behaviour of equipment outputs towards the consumer end of the network. The paper reports the approach used to simulate both the electricity consumption of groups of consumers and the output of solar systems subject to weather variability with the inclusion of cloud data from the Bureau of Meteorology (BOM). The data sets currently used are for Townsville, North Queensland. The initial characteristics that indicate whether solar installations are cost effective from an electricity distribution perspective are discussed.
Resumo:
The reliable operation of the electrical system at Callide Power Station is of extreme importance to the normal everyday running of the Station. This study applied the principles of reliability to do an analysis on the electrical system at Callide Power Station. It was found that the level of expected outage cost increased exponentially with a declining level of maintenance. Concluding that even in a harsh economic electricity market where CS Energy tries and push their plants to the limit, maintenance must not be neglected. A number of system configurations were found to increase the reliability of the system and reduce the expected outage costs. A number of other advantages were identified as a result of using reliability principles to do this study on the Callide electrical system configuration.
Resumo:
In deregulated versions of free-market electricity, producers will be free to send power along other utilities. The price of power strongly depends and fluctuates according to mutual benefit index of both supplier and consumer. In such a situation, strong interaction among utilities may cause instabilities in the system. As the frequency of market-based dispatch increases market forces tend to destabilize the stable system dynamics depending on the value of Ks/τλ(market dependent parameter) ratio. This tends to destabilize the coupled dynamics. The implementation of TCSC can effectively damp the inter area modes of oscillations of the coupled market system.
Resumo:
This paper presents a shared autonomy control scheme for a quadcopter that is suited for inspection of vertical infrastructure — tall man-made structures such as streetlights, electricity poles or the exterior surfaces of buildings. Current approaches to inspection of such structures is slow, expensive, and potentially hazardous. Low-cost aerial platforms with an ability to hover now have sufficient payload and endurance for this kind of task, but require significant human skill to fly. We develop a control architecture that enables synergy between the ground-based operator and the aerial inspection robot. An unskilled operator is assisted by onboard sensing and partial autonomy to safely fly the robot in close proximity to the structure. The operator uses their domain knowledge and problem solving skills to guide the robot in difficult to reach locations to inspect and assess the condition of the infrastructure. The operator commands the robot in a local task coordinate frame with limited degrees of freedom (DOF). For instance: up/down, left/right, toward/away with respect to the infrastructure. We therefore avoid problems of global mapping and navigation while providing an intuitive interface to the operator. We describe algorithms for pole detection, robot velocity estimation with respect to the pole, and position estimation in 3D space as well as the control algorithms and overall system architecture. We present initial results of shared autonomy of a quadrotor with respect to a vertical pole and robot performance is evaluated by comparing with motion capture data.
Resumo:
This paper reviews electricity consumption feedback literature to explore the potential of electricity feedback to affect residential consumers’ electricity usage patterns. The review highlights a substantial amount of literature covering the debate over the effectiveness of different feedback criteria to residential customer acceptance and overall conservation and peak demand reduction. Researchers studying the effects of feedback on everyday energy use have observed substantial variation in effect size, both within and between studies. Although researchers still continue to question the types of feedback that are most effective in encouraging conservation and peak load reduction, some trends have emerged. These include that feedback be received as quickly as possible to the time of consumption; be related to a standard; be clear and meaningful and where possible both direct and indirect feedback be customised to the customer. In general, the literature finds that feedback can reduce electricity consumption in homes by 5 to 20 per cent, but that significant gaps remain in our knowledge of the effectiveness and cost benefit of feedback.
Resumo:
Could mobile telephony be harnessed for development in Papua New Guinea (PNG)? Could mobile phones be utilised to enhance the security and prosperity of rural communities? Could mobile phones be a useful tool in the achievement of the PNG 2050 Vision targets? This paper is based on literature review around use of mobile phones in development in Asia, Africa, and the Caribbean. It also draws on discussions with key players in PNG, such as NGOs, UN agencies, donor partners, telecommunication companies and the government of PNG. Anticipated benefits of mobile phone availability have not been fully realised in rural areas of PNG to date due to pricing, difficulties with recharging handset batteries in communities which do not have mains electricity supply, and also concerns about negative social changes related to mobile telephony, for example parental stress over youth forming unsuitable relationships. Nonetheless, there are manifest possible ways for mobile phone technology to change user communication patterns positively regarding economic output. In sectors as diverse as health, education and law and justice, discussions are currently underway to establish how mobile phones could be used to increase service delivery, particularly to rural and marginal communities.
Resumo:
Widespread adoption by electricity utilities of Non-Conventional Instrument Transformers, such as optical or capacitive transducers, has been limited due to the lack of a standardised interface and multi-vendor interoperability. Low power analogue interfaces are being replaced by IEC 61850 9 2 and IEC 61869 9 digital interfaces that use Ethernet networks for communication. These ‘process bus’ connections achieve significant cost savings by simplifying connections between switchyard and control rooms; however the in-service performance when these standards are employed is largely unknown. The performance of real-time Ethernet networks and time synchronisation was assessed using a scale model of a substation automation system. The test bed was constructed from commercially available timing and protection equipment supplied by a range of vendors. Test protocols have been developed to thoroughly evaluate the performance of Ethernet networks and network based time synchronisation. The suitability of IEEE Std 1588 Precision Time Protocol (PTP) as a synchronising system for sampled values was tested in the steady state and under transient conditions. Similarly, the performance of hardened Ethernet switches designed for substation use was assessed under a range of network operating conditions. This paper presents test methods that use a precision Ethernet capture card to accurately measure PTP and network performance. These methods can be used for product selection and to assess ongoing system performance as substations age. Key findings on the behaviour of multi-function process bus networks are presented. System level tests were performed using a Real Time Digital Simulator and transformer protection relay with sampled value and Generic Object Oriented Substation Events (GOOSE) capability. These include the interactions between sampled values, PTP and GOOSE messages. Our research has demonstrated that several protocols can be used on a shared process bus, even with very high network loads. This should provide confidence that this technology is suitable for transmission substations.
Resumo:
In the decision-making of multi-area ATC (Available Transfer Capacity) in electricity market environment, the existing resources of transmission network should be optimally dispatched and coordinately employed on the premise that the secure system operation is maintained and risk associated is controllable. The non-sequential Monte Carlo simulation is used to determine the ATC probability density distribution of specified areas under the influence of several uncertainty factors, based on which, a coordinated probabilistic optimal decision-making model with the maximal risk benefit as its objective is developed for multi-area ATC. The NSGA-II is applied to calculate the ATC of each area, which considers the risk cost caused by relevant uncertainty factors and the synchronous coordination among areas. The essential characteristics of the developed model and the employed algorithm are illustrated by the example of IEEE 118-bus test system. Simulative result shows that, the risk of multi-area ATC decision-making is influenced by the uncertainties in power system operation and the relative importance degrees of different areas.
Resumo:
This project researched the performance of emerging digital technology for high voltage electricity substations that significantly improves safety for staff and reduces the potential impact on the environment of equipment failure. The experimental evaluation used a scale model of a substation control system that incorporated real substation control and networking equipment with real-time simulation of the power system. The outcomes confirm that it is possible to implement Ethernet networks in high voltage substations that meet the needs of utilities; however component-level testing of devices is necessary to achieve this. The assessment results have been used to further develop international standards for substation communication and precision timing.
Resumo:
This research project explores how interdisciplinary art practices can provide ways for questioning and envisaging alternative modes of coexistence between humans and the non-humans who together, make up the environment. As a practiceled project, it combines a body of creative work (50%) and this exegesis (50%). My interdisciplinary artistic practice appropriates methods and processes from science and engineering and merges them into artistic contexts for critical and poetic ends. By blending pseudo-scientific experimentation with creative strategies like visual fiction, humour, absurd public performance and scripted audience participation, my work engages with a range of debates around ecology. This exegesis details the interplay between critical theory relating to these debates, the work of other creative practitioners and my own evolving artistic practice. Through utilising methods and processes drawn from my prior career in water engineering, I present an interdisciplinary synthesis that seeks to promote improved understandings of the causes and consequences of our ecological actions and inactions.
Resumo:
Electricity cost has become a major expense for running data centers and server consolidation using virtualization technology has been used as an important technology to improve the energy efficiency of data centers. In this research, a genetic algorithm and a simulation-annealing algorithm are proposed for the static virtual machine placement problem that considers the energy consumption in both the servers and the communication network, and a trading algorithm is proposed for dynamic virtual machine placement. Experimental results have shown that the proposed methods are more energy efficient than existing solutions.
Resumo:
In the electricity market environment, coordination of system reliability and economics of a power system is of great significance in determining the available transfer capability (ATC). In addition, the risks associated with uncertainties should be properly addressed in the ATC determination process for risk-benefit maximization. Against this background, it is necessary that the ATC be optimally allocated and utilized within relative security constraints. First of all, the non-sequential Monte Carlo stimulation is employed to derive the probability density distribution of ATC of designated areas incorporating uncertainty factors. Second, on the basis of that, a multi-objective optimization model is formulated to determine the multi-area ATC so as to maximize the risk-benefits. Then, the solution to the developed model is achieved by the fast non-dominated sorting (NSGA-II) algorithm, which could decrease the risk caused by uncertainties while coordinating the ATCs of different areas. Finally, the IEEE 118-bus test system is served for demonstrating the essential features of the developed model and employed algorithm.
Resumo:
Eco-feedback interventions are capable of producing reductions in household energy consumption. Yet less is known about exactly how this reduction is achieved, how to maximise user engagement, or how to effectively translate engagement into energy saving. This paper discusses design opportunities for eco-feedback systems through observations of domestic energy use in both Western and rural developing world contexts. Drawing on case studies from these two contexts including 21 empirical interviews, we present an alternative framework for human-resource interaction, highlighting design opportunities for a transition towards more engaged and sustainable energy consumption among users.
Resumo:
Climate change is leading to an increased frequency and severity of heat waves. Spells of several consecutive days of unusually high temperatures have led to increased mortality rates for the more vulnerable in the community. The problem is compounded by the escalating energy costs and increasing peak electrical demand as people become more reliant on air conditioning. Domestic air conditioning is the primary determinant of peak power demand which has been a major driver of higher electricity costs. This report presents the findings of multidisciplinary research which develops a national framework to evaluate the potential impacts of heat waves. It presents a technical, social and economic approach to adapt Australian residential buildings to ameliorate the impact of heat waves in the community and reduce the risk of its adverse outcomes. Through the development of a methodology for estimating the impact of global warming on key weather parameters in 2030 and 2050, it is possible to re-evaluate the size and anticipated energy consumption of air conditioners in future years for various climate zones in Australia. Over the coming decades it is likely that mainland Australia will require more cooling than heating. While in some parts the total electricity usage for heating and cooling may remain unchanged, there is an overall significant increase in peak electricity demand, likely to further drive electricity prices. Through monitoring groups of households in South Australia, New South Wales and Queensland, the impact of heat waves on both thermal comfort sensation and energy consumption for air conditioning has been evaluated. The results show that households are likely to be able to tolerate slightly increased temperature levels indoors during periods of high outside temperatures. The research identified that household electricity costs are likely to rise above what is currently projected due to the impact of climate change. Through a number of regulatory changes to both household design and air conditioners, this impact can be minimised. A number of proposed retrofit and design measures are provided, which can readily reduce electricity usage for cooling at minimal cost to the household. Using a number of social research instruments, it is evident that households are willing to change behaviour rather than to spend money. Those on lower income and elderly individuals are the least able to afford the use of air conditioning and should be a priority for interventions and assistance. Increasing community awareness of cost effective strategies to manage comfort and health during heat waves is a high priority recommended action. Overall, the research showed that a combined approach including behaviour change, dwelling modification and improved air conditioner selection can readily adapt Australian households to the impact of heat waves, reducing the risk of heat related deaths and household energy costs.