675 resultados para Air power


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper deals with the analysis of the parameters which are effective in shaft voltage generation of induction generators. It focuses on different parasitic capacitive couplings by mathematical equations, finite element simulations and experiments. The effects of different design parameters have been studied on proposed capacitances and resultant shaft voltage. Some parameters can change proposed capacitive coupling such as: stator slot tooth, the gap between slot tooth and winding, and the height of the slot tooth, as well as the air gap between the rotor and the stator. This analysis can be used in a primary stage of a generator design to reduce motor shaft voltage and avoid additional costs of resultant bearing current mitigation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A high voltage pulsed power supply is proposed in this paper based on oscillation between an inductor and a capacitor in an LC circuit. A two-leg resonant circuit, supplied through an inverter with an alternative voltage waveform, can generate output voltage up to four times an input voltage magnitude. Bipolar and unipolar modulations are used in a single phase inverter to analyse their effects on the proposed resonant converter. Simulations have been carried out to evaluate the proposed topology and control.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a high voltage pulsed power system based on low voltage switch-capacitor units connected to a current source for several applications such as plasma systems. A buck-boost converter topology is used to utilize the current source and a series of low voltage switch-capacitor units is connected to the current source in order to provide high voltage with high voltage stress (dv/dt) as demanded by loads. This pulsed power converter is flexible in terms of energy control, in that the stored energy in the current source can be adjusted by changing the current magnitude to significantly improve the efficiency of various systems with different requirements. Output voltage magnitude and stress (dv/dt) can be controlled by a proper selection of components and control algorithm to turn on and off switching devices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Electromagnetic compatibility of power electronic systems becomes an engineering discipline and it should be considered at the beginning stage of a design. Thus, a power electronics design becomes more complex and challenging and it requires a good communication between EMI and Power electronics experts. Three major issues in designing a power electronic system are Losses, EMI and Harmonics. These issues affect system cost, size, efficiency and quality and it is a tradeoff between these factors when we design a power converter.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An algorithm based on the concept of Kalman filtering is proposed in this paper for the estimation of power system signal attributes, like amplitude, frequency and phase angle. This technique can be used in protection relays, digital AVRs, DSTATCOMs, FACTS and other power electronics applications. Furthermore this algorithm is particularly suitable for the integration of distributed generation sources to power grids when fast and accurate detection of small variations of signal attributes are needed. Practical considerations such as the effect of noise, higher order harmonics, and computational issues of the algorithm are considered and tested in the paper. Several computer simulations are presented to highlight the usefulness of the proposed approach. Simulation results show that the proposed technique can simultaneously estimate the signal attributes, even if it is highly distorted due to the presence of non-linear loads and noise.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents an analysis of phasor measurement method for tracking the fundamental power frequency to show if it has the performance necessary to cope with the requirements of power system protection and control. In this regard, several computer simulations presenting the conditions of a typical power system signal especially those highly distorted by harmonics, noise and offset, are provided to evaluate the response of the Phasor Measurement (PM) technique. A new method, which can shorten the delay of estimation, has also been proposed for the PM method to work for signals free of even-order harmonics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes a method for power flow control between utility and microgrid through back-to-back converters, which facilitates desired real and reactive power flow between utility and microgrid. In the proposed control strategy, the system can run in two different modes depending on the power requirement in the microgrid. In mode-1, specified amount of real and reactive power are shared between the utility and the microgrid through the back-to-back converters. Mode-2 is invoked when the power that can be supplied by the DGs in the microgrid reaches its maximum limit. In such a case, the rest of the power demand of the microgrid has to be supplied by the utility. An arrangement between DGs in the microgrid is proposed to achieve load sharing in both grid connected and islanded modes. The back-to-back converters also provide total frequency isolation between the utility and the microgrid. It is shown that the voltage or frequency fluctuation in the utility side has no impact on voltage or power in microgrid side. Proper relay-breaker operation coordination is proposed during fault along with the blocking of the back-to-back converters for seamless resynchronization. Both impedance and motor type loads are considered to verify the system stability. The impact of dc side voltage fluctuation of the DGs and DG tripping on power sharing is also investigated. The efficacy of the proposed control ar-rangement has been validated through simulation for various operating conditions. The model of the microgrid power system is simulated in PSCAD.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes control methods for proper load sharing between parallel converters connected in a microgrid and supplied by distributed generators (DGs). It is assumed that the microgrid spans a large area and it supplies loads in both in grid connected and islanded modes. A control strategy is proposed to improve power quality and proper load sharing in both islanded and grid connected modes. It is assumed that each of the DGs has a local load connected to it which can be unbalanced and/or nonlinear. The DGs compensate the effects of unbalance and nonlinearity of the local loads. Common loads are also connected to the microgrid, which are supplied by the utility grid under normal conditions. However during islanding, each of the DGs supplies its local load and shares the common load through droop characteristics. Both impedance and motor loads are considered to verify the system response. The efficacy of the controller has been validated through simulation for various operating conditions using PSCAD. It has been found through simulation that the total Harmonic Distortion (THD) of the of the microgrid voltage is about 10% and the negative and zero sequence component are around 20% of the positive sequence component before compensation. After compensation, the THD remain below 0.5%, whereas, negative and zero sequence components of the voltages remain below 0.02% of the positive sequence component.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In paper has been to investigate the morphological patterns and kinetics of PDMS spreading on silicon wafer using combination of techniques like ellipsometry, atomic force microscope (AFM), scanning electron microscope (SEM) and optical microscopy. A macroscopic silicone oil drops as well as PDMS water based emulsions were studied after deposition on a flat surface of silicon wafer in air, water and vacuum. our own measurements using an imaging ellipsometer, which also clearly shows the presence of a precursor film. The diffusion constant of this film, measured with a 60 000 cS PDMS sample spreading on a hydrophilic silicon wafer, is Df = 1.4  10-11 m2/s. Regardless of their size, density and method of deposition, droplets on both types of wafer (hydrophilic and hydrophobic) flatten out over a period of many hours, up to 3 days. During this process neighbouring droplets may coalesce, but there is strong evidence that some of the PDMS from the droplets migrates into a thin, continuous film that covers the surface in between droplets. The thin film appears to be ubiquitous if there has been any deposition of PDMS. However, this statement needs further verification. One question is whether the film forms immediately after forced drying, or whether in some or all cases it only forms by spreading from isolated droplets as they slowly flatten out.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In a power network, when a propagation energy wave caused by a disturbance hits a weak link, a reflection is appeared and some of energy is transferred across the link. In this work, an analytical descriptive methodology is proposed to study the dynamical stability of a large scale power system. For this purpose, the measured electrical indices (angle, or voltage/frequency) following a fault in different points among the network are used, and the behaviors of the propagated waves through the lines, nodes and buses are studied. This work addresses a new tool for power system stability analysis based on a descriptive study of electrical measurements. The proposed methodology is also useful to detect the contingency condition and synthesis of an effective emergency control scheme.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The following paper presents an evaluation of airborne sensors for use in vegetation management in powerline corridors. Three integral stages in the management process are addressed including, the detection of trees, relative positioning with respect to the nearest powerline and vegetation height estimation. Image data, including multi-spectral and high resolution, are analyzed along with LiDAR data captured from fixed wing aircraft. Ground truth data is then used to establish the accuracy and reliability of each sensor thus providing a quantitative comparison of sensor options. Tree detection was achieved through crown delineation using a Pulse-Coupled Neural Network (PCNN) and morphologic reconstruction applied to multi-spectral imagery. Through testing it was shown to achieve a detection rate of 96%, while the accuracy in segmenting groups of trees and single trees correctly was shown to be 75%. Relative positioning using LiDAR achieved a RMSE of 1.4m and 2.1m for cross track distance and along track position respectively, while Direct Georeferencing achieved RMSE of 3.1m in both instances. The estimation of pole and tree heights measured with LiDAR had a RMSE of 0.4m and 0.9m respectively, while Stereo Matching achieved 1.5m and 2.9m. Overall a small number of poles were missed with detection rates of 98% and 95% for LiDAR and Stereo Matching.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cyber bullying – or bullying through the use of technology – is a growing phenomenon which is currently most commonly experienced by young people and the consequences manifested in schools. Cyber bullying shares many of the same attributes as face-to-face bullying such as a power imbalance and a sense of helplessness on the part of the target. Not surprisingly, targets of face-to-face bullying are increasingly turning to the law, and it is likely that targets of cyber bullying may also do so in an appropriate case. This article examines the various criminal, civil and vilification laws that may apply to cases of cyber bullying and assesses the likely effectiveness of these laws as a means of redressing that power imbalance between perpetrator and target.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This chapter looks at issues of non-stationarity in determining when a transient has occurred and when it is possible to fit a linear model to a non-linear response. The first issue is associated with the detection of loss of damping of power system modes. When some control device such as an SVC fails, the operator needs to know whether the damping of key power system oscillation modes has deteriorated significantly. This question is posed here as an alarm detection problem rather than an identification problem to get a fast detection of a change. The second issue concerns when a significant disturbance has occurred and the operator is seeking to characterize the system oscillation. The disturbance initially is large giving a nonlinear response; this then decays and can then be smaller than the noise level ofnormal customer load changes. The difficulty is one of determining when a linear response can be reliably identified between the non-linear phase and the large noise phase of thesignal. The solution proposed in this chapter uses “Time-Frequency” analysis tools to assistthe extraction of the linear model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper employs empirical evidence from a survey of Queensland secondary school students to examine their knowledge about their wages and working conditions. It does so within the theoretical lens of the Gagne (or Gagne-Briggs) theory of instruction, which centres on the content of learning and how learning is acquired (Gagne, Briggs & Wager, 1988). While Gagne articulates five categories of learning, our focus here is on two; verbal information or declarative knowledge (facts that people can declare), and procedural knowledge (the rules and procedures for achieving outcomes). We show that student workers know little about the instruments governing their employment, or their workplace entitlements. Of the total sample of year 9 and year 11 students surveyed (n=892), those students who worked, or who had worked in the past year (n=438), were asked to identify whether they were employed under an award, collective agreement or AWA. Eighty three per cent of students did not know which industrial instrument set their wages. We argue that if young workers do not have declarative knowledge of their entitlements, nor basic procedural knowledge about redress, then they are not in a position to deploy Gagne’s ‘cognitive strategies’ that would enable them to take action to ensure their working conditions meet legal minima. We advocate that young workers should be given summary information on their wages and other entitlements on appointment and that such summary information should be readily available on employers’ noticeboards and electronically on company websites, and that the information should include a brief summary of avenues for redressing issues of underpayment or sub-standard conditions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Air transportation of Australian casualties in World War II was initially carried out in air ambulances with an accompanying male medical orderly. By late 1943 with the war effort concentrated in the Pacific, Allied military authorities realised that air transport was needed to move the increasing numbers of casualties over longer distances. The Royal Australian Air Force (RAAF) became responsible for air evacuation of Australian casualties and established a formal medical air evacuation system with trained flight teams early in 1944. Specialised Medical Air Evacuation Transport Units (MAETUs) were established whose sole responsibility was undertaking air evacuations of Australian casualties from the forward operational areas back to definitive medical care. Flight teams consisting of a RAAF nursing sister (registered nurse) and a medical orderly carried out the escort duties. These personnel had been specially trained in Australia for their role. Post-WWII, the RAAF Nursing Service was demobilised with a limited number of nurses being retained for the Interim Air Force. Subsequently, those nurses were offered commissions in the Permanent Air Force. Some of the nurses who remained were air evacuation trained and carried out air evacuations both in Australia and as part of the British Commonwealth Occupation Force in Japan. With the outbreak of the Korean War in June 1950, Australia became responsible for the air evacuation of British Commonwealth casualties from Korea to Japan. With a re-organisation of the Australian forces as part of the British Commonwealth forces, RAAF nurses were posted to undertake air evacuation from Korea and back to Australia from Iwakuni, Japan. By 1952, a specialised casualty staging section was established in Seoul and staffed by RAAF nurses from Iwakuni on a rotation basis. The development of the Australian air evacuation system and the role of the flight nurses are not well documented for the period 1943-1953. The aims of this research are three fold and include documenting the origins and development of the air evacuation system from 1943-1953; analysing and documenting the RAAF nurse’s role and exploring whether any influences or lessons remain valid today. A traditional historical methodology of narrative and then analysis was used to inform the flight nurse’s role within the totality of the social system. Evidence was based on primary data sources mainly held in Defence files, the Australian War Memorial or the National Archives of Australia. Interviews with 12 ex-RAAF nurses from both WWII and the Korean War were conducted to provide information where there were gaps in the primary data and to enable exploration of the flight nurses’ role and their contributions in war of the air evacuation of casualties. Finally, this thesis highlights two lessons that remain valid today. The first is that interoperability of air evacuation systems with other nations is a force multiplier when resources are scarce or limited. Second, the pre-flight assessment of patients was essential and ensured that there were no deaths in-flight.