650 resultados para road projects
Resumo:
The paper explores the efficacy of public agencies using their contracting relationships with private firms to affect training outcomes in the construction industry. It develops a theoretical perspective on this issue by extending a framework that was originally developed by Hart, Schleifer and Vishny (1997) to study privatisation. This paper shows how their framework can also be applied to situations where the provision of public works is already privatised and the government is attempting to regulate training outcomes via a contracting arrangement. An empirical study of two training policies of the Western Australian government complements this theoretical discussion. We report the results of an analysis of data drawn from the government’s Tender Registration System between 1997 & 2006. As such we use a unique and comprehensive resource to examine the possible effects of new training policies on an important segment of the construction ‘market’.
Resumo:
New product development projects are experiencing increasing internal and external project complexity. Complexity leadership theory proposes that external complexity requires adaptive and enabling leadership, which facilitates opportunity recognition (OR). We ask whether internal complexity also requires OR for increased adaptability. We extend a model of EO and OR to conclude that internal complexity may require more careful OR. This means that leaders of technically or structurally complex projects need to evaluate opportunities more carefully than those in projects with external or technological complexity.
Resumo:
Purpose – The purpose of this paper is to provide a practicable systems-based approach to knowledge management (KM) in a project environment, to encourage organisations to unlock the value in their review processes. It relies on knowledge capture and storage at decision review points, to enrich individual, team and organisational learning during the project life cycle. The project's phases are typically represented horizontally with deliverables (objectives) or project "promises" as the desirable outcomes. The purpose of this paper is to give expression through introducing a vertical dimension to facilitate the KM process. A model is proposed that conceptualises project-specific knowledge drawing on and feeding into the organisation's knowledge management system (KMS) at tactical and strategic levels. Design/methodology/approach – This conceptual paper links concepts from systems theory with KM, to produce a model to identify, collate, and optimise project-based knowledge and integrate it into the management process. Findings – The application of the system theory approach enriches the knowledge generated by a project, and feeds it into the next phase of that project. At the same time, it contributes to the individual's and project team's KM, specifies possible courses of action, together with risks, costs and benefits and thus it expands the organisation's higher level KMS. Research limitations/implications – The concept suggests that the knowledge capture, storage and sharing process may best be undertaken holistically, in view of the systems relationships between the tasks. Systems theory structures this process. Research opportunities include studying the interfaces between levels of KM, in relation to the project's progress. Practical implications – Reconceptualisation of the project as a knowledge creation process may improve the project's progress as well as add to the individual's, project team's, and wider organisation's knowledge base. An example is given. Originality/value – This paper illuminates the broader potential of under-utilised opportunities in well-known management approaches to add dimension to the business project, of knowledge creation, storage and sharing.
Resumo:
An estimation of costs for maintenance and rehabilitation is subject to variation due to the uncertainties of input parameters. This paper presents the results of an analysis to identify input parameters that affect the prediction of variation in road deterioration. Road data obtained from 1688 km of a national highway located in the tropical northeast of Queensland in Australia were used in the analysis. Data were analysed using a probability-based method, the Monte Carlo simulation technique and HDM-4’s roughness prediction model. The results of the analysis indicated that among the input parameters the variability of pavement strength, rut depth, annual equivalent axle load and initial roughness affected the variability of the predicted roughness. The second part of the paper presents an analysis to assess the variation in cost estimates due to the variability of the overall identified critical input parameters.
Resumo:
A broad range of motorcycle safety programs and systems exist in Australia and New Zealand. These vary from statewide licensing and training systems run by government licensing and transport agencies to safety programs run in small communities and by individual rider groups. While the effectiveness of licensing and training has been reviewed and recommendations for improvement have been developed (e.g. Haworth & Mulvihill, 2005), little is known about many smaller or innovative programs, and their potential to improve motorcycle safety in the ACT.
Resumo:
With the current National Road Safety Strategy [1] coming to the end of its term, it is timely to consider ways in which the next iteration of this strategy can be enhanced. Strategic planning should be a cyclic process in which learning and adaptation are just as important as planning and implementation. It will always be the case that some actions are not as effective as expected, or that barriers to effective implementation will emerge. Rather than being setbacks, these are opportunities for learning about the validity of our assumptions. They are also opportunities for us to adapt to meet unanticipated or emerging challenges. One of the positive aspects of the implementation of the first and second National Road Safety Strategies has been the willingness of road safety agencies to critically assess progress and to identify where and how actions would be better focused. This has been reflected in the evolving nature of the periodic National Road Safety Action Plans. As the decade of the current Strategy reaches an end, there is a need to take this process further, and undertake a thorough critical evaluation of the Strategy development and implementation. While not an attempt to be exhaustive, the following article will identify some key priorities for consideration as part of this process.
Resumo:
In urban environments road traffic volumes are increasing and the density of living is becoming higher. As a consequence the urban community is being exposed to increasing levels of road traffic noise. It is also evident that the noise reduction potential of within-the-road-reserve treatments such as noise barriers, mounding and pavement surfacing has been exhausted. This paper presents a strategy that involves the comparison of noise ameliorative treatments both within and outside the road reserve. The noise reduction resulting from the within-the-road-reserve component of treatments has been evaluated using a leading application of the CoRTN Model, developed by the UK Department of Transport 1988 [1], and the outside road reserve treatment has been evaluated in accordance with the Australian Standard 3671, Acoustics – Road traffic noise intrusion – Building sitting and construction [5]. The evaluation of noise treatments has been undertaken using a decision support tool (DST) currently being developed under the research program conducted at RMIT University and Department of Main Roads, Queensland. The case study has been based on data from a real project in Queensland, Australia. The research described here was carried out by the Australian Cooperative Research Centre for Construction Innovation [9], in collaboration with Department of Main Roads, Queensland, Department of Public Works, Queensland, Arup Pty. Ltd., Queensland University of technology and RMIT University.
Resumo:
Properly designed decision support environments encourage proactive and objective decision making. The work presented in this paper inquires into developing a decision support environment and a tool to facilitate objective decision making in dealing with road traffic noise. The decision support methodology incorporates traffic amelioration strategies both within and outside the road reserve. The project is funded by the CRC for Construction Innovation and conducted jointly by the RMIT University and the Queensland Department of Main Roads (MR) in collaboration with the Queensland Department of Public Works, Arup Pty Ltd., and the Queensland University of Technology. In this paper, the proposed decision support framework is presented in the way of a flowchart which enabled the development of the decision support tool (DST). The underpinning concept is to establish and retain an information warehouse for each critical road segment (noise corridor) for a given planning horizon. It is understood that, in current practice, some components of the approach described are already in place but not fully integrated and supported. It provides an integrated user-friendly interface between traffic noise modeling software, noise management criteria and cost databases.
Resumo:
Many factors have the potential to influence human health. These factors need to be monitored to maintain health. As is the case with human health, construction projects have a number of critical factors that can facilitate a broad evaluation of project health. In order to use these factors as an indication of health, they need to be assessed. This assessment can help to achieve desired outcomes for the project. This paper discusses the approach of assessing Critical Success Factors (CSFs) using Key Performance Indicators (KPIs) to ascertain the immediate health of a construction project. This approach is applicable to all phases of construction projects and many construction procurement methods. KPIs have been benchmarked on the basis of industry standards and historical data. The robustness of the KPIs to assess the immediate health of a project has been validated using Australian and international case studies.
Project diagnostics : assessing the condition of projects and identifying poor health combing forces
Resumo:
In many cases, construction projects do not achieve the objectives that the project participants set for them. If participants could better understand how their project is performing overall, at various stages of its delivery, then the opportunities to achieve project success would almost certainly be greater. This paper documents a method of assessing the status of a project, at a point in its design or construction phase, or after completion. The status is assessed in terms of up to seven (7) key success factors. Any evidence of less than adequate performance in these performance areas is scrutinised to seek out the root causes of why this situation is happening. Using these identified root causes of under performance, general suggestions can then be made as to how to return the project to good health. A software package that assists in assessing the status of the project has been developed. The package is currently being calibrated before commercial release.
Resumo:
Queensland Department of Main Roads, Australia, spends approximately A$ 1 billion annually for road infrastructure asset management. To effectively manage road infrastructure, firstly road agencies not only need to optimise the expenditure for data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. This paper presents the results of case studies in using the probability-based method for an integrated approach (i.e. assessing optimal costs of pavement strength data collection; calibrating deterioration prediction models that suit local condition and assessing risk-adjusted budget estimates for road maintenance and rehabilitation for assessing life-cycle budget estimates). The probability concept is opening the path to having the means to predict life-cycle maintenance and rehabilitation budget estimates that have a known probability of success (e.g. produce budget estimates for a project life-cycle cost with 5% probability of exceeding). The paper also presents a conceptual decision-making framework in the form of risk mapping in which the life-cycle budget/cost investment could be considered in conjunction with social, environmental and political issues.
Resumo:
Australias civil infrastructure assets of roads, bridges, railways, buildings and other structures are worth billions of dollars. To effectively manage road infrastructures, road agencies firstly need to optimise the expenditure for data collection whilst not jeopardising the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates can be accurately calculated. Finally, the prediction of budgets for maintenance and rehabilitation must be reasonably reliable.
Resumo:
The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.
Resumo:
The human health effects following exposure to ultrafine (<100nm) particles (UFPs) produced by fuel combustion, while not completely understood, are generally regarded as detrimental. Road tunnels have emerged as locations where maximum exposure to these particles may occur for the vehicle occupants using them. This study aimed to quantify and investigate the determinants of UFP concentrations in the 4km twin-bore (eastbound and westbound) M5 East tunnel in Sydney, Australia. Sampling was undertaken using a condensation particle counter (CPC) mounted in a vehicle traversing both tunnel bores at various times of day from May through July, 2006. Supplementary measurements were conducted in February, 2008. Over three hundred transects of the tunnel were performed, and these were distributed evenly between the bores. Additional comparative measurements were conducted on a mixed route comprising major roads and shorter tunnels, all within Sydney. Individual trip average UFP concentrations in the M5 East tunnel bores ranged from 5.53 × 104 p cm-3 to 5.95 × 106 p cm-3. Data were sorted by hour of capture, and hourly median trip average (HMA) UFP concentrations ranged from 7.81 × 104 p cm-3 to 1.73 × 106 p cm-3. Hourly median UFP concentrations measured on the mixed route were between 3.71 × 104 p cm-3 and 1.55 × 105 p cm-3. Hourly heavy diesel vehicle (HDV) traffic volume was a very good determinant of UFP concentration in the eastbound tunnel bore (R2 = 0.87), but much less so in the westbound bore (R2 = 0.26). In both bores, the volume of passenger vehicles (i.e. unleaded gasoline-powered vehicles) was a significantly poorer determinant of particle concentration. When compared with similar studies reported previously, the measurements described here were among the highest recorded concentrations, which further highlights the contribution road tunnels may make to the overall UFP exposure of vehicle occupants.