212 resultados para productivity index


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background/aims: Access to appropriate health care following an acute cardiac event is important for positive outcomes. The aim of the Cardiac ARIA index was to derive an objective, comparable, geographic measure reflecting access to cardiac services across Australia. Methods: Geographic Information Systems (GIS) were used to model a numeric-alpha index based on acute management from onset of symptoms to return to the community. Acute time frames have been calculated to include time for ambulance to arrive, assess and load patient, and travel to facility by road 40–80 kph. Results: The acute phase of the index was modelled into five categories: 1 [24/7 percutaneous cardiac intervention (PCI) ≤1 h]; 2 [24/7 PCI 1–3 h, and PCI less than an additional hour to nearest accident and emergency room (A&E)]: 3 [Nearest A&E ≤3 h (no 24/7 PCI within an extra hour)]: 4 [Nearest A&E 3–12 h (no 24/7 PCI within an extra hour)]: 5 [Nearest A&E 12–24 h (no 24/7 PCI within an extra hour)]. Discharge care was modelled into three categories based on time to a cardiac rehabilitation program, retail pharmacy, pathology services, hospital, GP or remote clinic: (A) all services ≤30 min; (B) >30 min and ≤60 min; (C) >60 min. Examples of the index indicate that the majority of population locations within capital cities were category 1A; Alice Springs and Byron Bay were 3A; and the Northern Territory town of Maningrida had minimal access to cardiac services with an index ranking of 5C. Conclusion: The Cardiac ARIA index provides an invaluable tool to inform appropriate strategies for the use of scarce cardiac resources.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Growth in productivity is the key determinant of the long-term health and prosperity of an economy. The construction industry being one of major strategic importance, its productivity performance has a significant effect on national economic growth. The relationship between construction output and economy has received intensive studies, but there is lack of empirical study on the relationship between construction productivity and economic fluctuations. Fluctuations in construction output are endemic in the industry. In part they are caused by the boom and slump of the economy as a whole and in part by the nature of the construction product. This research aims to uncover how the productivity of construction sector is influenced in the course of economic fluctuations in Malaysia. Malaysia has adopted three economic policies – New Economic Policy (1971-1990), National Development Policy (1991-2000) and the National Vision Policy (2001-2010) since gaining independence in 1959. The Privatisation Master Plan was introduced in 1991. Operating within this historical context, the Malaysian construction sector has experienced four business cycles since 1960. A mixed-method design approach is adopted in this study. Quantitative analysis was conducted on the published official statistics of the construction industry and the overall economy in Malaysia between 1970 and 2009. Qualitative study involved interviews with a purposive sample of 21 industrial participants. This study identified a 32-year long building cycle appears in 1975-2006. It is superimposed with three shorter construction business cycles in 1975-1987, 1987-1999 and 1999-2006. The correlations of Construction labour productivity (CLP) and GDP per capita are statistically significant for the 1975-2006 building cycle, 1987-1999 and 1999-2006 construction business cycles. It was not significant in 1975-1987 construction business cycles. The Construction Industry Surveys/Census over the period from 1996 to 2007 show that the average growth rate of total output per employee expanded but the added value per employee contracted which imply high cost of bought-in materials and services and inefficient usage of purchases. The construction labour productivity is peaked at 2004 although there is contraction of construction sector in 2004. The residential subsector performed relatively better than the other sub-sectors in most of the productivity indicators. Improvements are found in output per employee, value added per employee, labour competitiveness and capital investment but declines are recorded in value added content and capital productivity. The civil engineering construction is most productive in the labour productivity nevertheless relatively poorer in the capital productivity. The labour cost is more competitive in the larger size establishment. The added value per labour cost is higher in larger sized establishment attributed to efficient in utilization of capital. The interview with the industrial participant reveals that the productivity of the construction sector is influenced by the economic environment, the construction methods, contract arrangement, payment chain and regulatory policies. The fluctuations of construction demand have caused companies switched to defensive strategy during the economic downturn and to ensure short-term survival than to make a profit for the long-term survival and growth. It leads the company to take drastic measures to curb expenses, downsizing, employ contract employment, diversification and venture overseas market. There is no empirical evidence supports downsizing as a necessary step in a process of reviving productivity. The productivity does not correlate with size of firm. A relatively smaller and focused firm is more productive than the larger and diversified organisation. However diversified company experienced less fluctuation in both labour and capital productivity. In order to improve the productivity of the construction sector, it is necessary to remove the negatives and flaws from past practices. The recommended measures include long-term strategic planning and coordinated approaches of government agencies in planning of infrastructure development and to provide regulatory environments which encourage competition and facilitate productivity improvement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction sites around the world employ large numbers of people from diverse cultural backgrounds. The effective management of this cultural diversity has important implications for the productivity, safety, health and welfare of construction workers and for the performance and reputation of firms which employ them. The findings of a three year, multi-staged study of cultural diversity management practices on construction sites are critiqued using social identity theory. This reveals that so called "best-practice" diversity management strategies may have an opposite effect to that intended. It is concluded that the management of diversity on construction projects would benefit from being informed by social identity research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The goal of this research project is to develop specific BIM objects for temporary construction activities which are fully integrated with object design, construction efficiency and safety parameters. Specifically, the project will deliver modularised electronic scaffolding and formwork objects that will allow designers to easily incorporate them into BIM models to facilitate smarter and safer infrastructure and building construction. This research first identified there is currently a distinct lack of BIM objects for temporary construction works resulting in productivity loss during design and construction, and opportunities for improved consideration of safety standards and practices with the design of scaffolding and formwork. This is particularly relevant in Australia, given the “harmonisation” of OHS legislation across all states and territories from 1 January 2012, meaning that enhancements to Queensland practices will have direct application across Australia. Thus, in conjunction with government and industry partners in Queensland, Australia, the research team developed a strategic three-phase research methodology: (1) the preliminary review phase on industrial scaffolding and formwork practices and BIM implementation; (2) the BIM object development phase with specific safety and productivity functions; and (3) the Queensland-wide workshop phase for product dissemination and training. This paper discusses background review findings, details of the developed methodology, and expected research outcomes and their contributions to the Australian construction industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this study, we investigate the relationship between tree species diversity and production in 18 mixed-species plantations established under the Rainforestation Farming system in Leyte province, the Philippines. The aim was to quantify productivity in the mixed-species plantations in comparison to the monocultures, and identify key drivers of productivity including environmental conditions, stand structural characteristics and surrogate measures of biodiversity, i.e. species richness, Shannon’s diversity index and functional groups. We found that monocultures had a much higher productivity than mixtures of the same and other species. In the mixtures, biodiversity and productivity did not have a simple relationship. Instead the proportion of exotic and native species, and the proportion of fast-growing species had a marginally significant positive effect on stand productivity, but no significant relationship was found with species richness or Shannon’s diversity. Instead stand structural characteristics such as density and age were the strongest drivers of increased productivity. Production levels within the mixed-species plantations varied significantly between sites. Overall, we found that the productivity of mixed species plantations was driven more by the characteristics of species present and stand structural characteristics then by simply the number and abundance of species, which suggests management practices are key for balancing multiple objectives to meet sustainable development needs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The professional development needs of early career academics (ECAs) are increasingly subject to scrutiny. The literature notes writing groups can be successful in increasing research outputs and improving research track records – a core concern for ECAs. However, the pressure on ECAs to publish takes the pleasure out of writing for many. We argue writing groups, created by and for ECAs, can provide an environment for ECAs to (re)produce pleasure in writing and participation in the processes of academic review and debate. In addition, our experience of a writing group was that it provided a platform of social and emotional support contributing to our personal well-being and professional development.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents two novel concepts to enhance the accuracy of damage detection using the Modal Strain Energy based Damage Index (MSEDI) with the presence of noise in the mode shape data. Firstly, the paper presents a sequential curve fitting technique that reduces the effect of noise on the calculation process of the MSEDI, more effectively than the two commonly used curve fitting techniques; namely, polynomial and Fourier’s series. Secondly, a probability based Generalized Damage Localization Index (GDLI) is proposed as a viable improvement to the damage detection process. The study uses a validated ABAQUS finite-element model of a reinforced concrete beam to obtain mode shape data in the undamaged and damaged states. Noise is simulated by adding three levels of random noise (1%, 3%, and 5%) to the mode shape data. Results show that damage detection is enhanced with increased number of modes and samples used with the GDLI.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pan et al. claim that our results actually support a strong linear positive relationship between productivity and richness, whereas Fridley et al. contend that the data support a strong humped relationship. These responses illustrate how preoccupation with bivariate patterns distracts from a deeper understanding of the multivariate mechanisms that control these important ecosystem properties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction industry is an industry of major strategic importance. Its level of productivity has a significant effect on national economic growth. Productivity indicators are examined. The indicators consist of labour productivity, capital productivity, labour competitiveness, capital intensity and added value content of data, which are obtained from the published census/biannual surveys of the construction industry between the years 1999 and 2011 from the Department of Statistics of Malaysia. The results indicated that there is an improvement in the labour productivity, but the value-added content is declining. The civil engineering and special trades subsectors are more productive than the residential and non-residential subsectors in terms of labour productivity because machine-for-labour substitution is a more important process in those subsectors. The capital-intensive characteristics of civil engineering and special trade works enable these subsectors to achieve higher added value per labour cost but not the capital productivity. The added value per labour cost is lower in larger organizations despite higher capital productivity. However, the capital intensity is lower and unit labour cost is higher in the larger organizations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper employs the industry of origin approach to compare value-added and labour productivity of Singapore and Hong Kong’s wholesale and retail sectors for the period 2001–08. The direct comparison between these two economies was motivated by the statement of the Singapore Government that its services sector, especially the retail sector, lagged behind Hong Kong’s productivity levels. The results show that since 2005, Singapore’s wholesale and retail sector performance in terms of labour productivity has been below Hong Kong’s level, largely due to the poor performance of its retail sector arising from an influx of foreign workers. Results from total factor productivity analysis of these two economies also suggest that Hong Kong’s better performance (since 2005) was largely due to its ability to employ more educated and trained workers with limited use of capital. The results suggest that polices that have worked in Hong Kong may not work in Singapore because its population is more diverse, which poses a challenge to policymakers in raising its productivity level.